Joke Collection Website - Bulletin headlines - Classification of Wall in Civil Engineering
Classification of Wall in Civil Engineering
Filled wall
The wall filled between columns in a frame structure is called a frame filled wall. Volume calculation: the infilled wall is calculated by volume according to the size shown in the design, excluding the area of door and window openings and the volume occupied by beams (lintels, ring beams and cantilever beams). In fact, the masonry part has been included in the project and is not calculated separately.
divide
A wall that separates the internal space and bears its weight by the floor or beam is called a partition wall.
curtain wall
The light wall hanging mainly between external skeletons is called curtain wall.
Masonry wall
A wall made of bricks and mortar by a certain masonry method. Block generally includes: solid brick, hollow brick, lightweight aggregate concrete block, concrete hollow block, rubble, rubble, etc. Mortar generally includes mixed mortar and cement mortar. Masonry methods include: for brick walls, including "three-in-one" bricklaying method, "2381" bricklaying method, squeezing method, scraping method and full mouth ash method. Among them, the most commonly used are "three-in-one" bricklaying method and extrusion method.
- Previous article:What is illegal medical practice?
- Next article:Looking for funny car warnings and car slogans
- Related articles
- Legal publicity month activity plan
- Pictures of primary school students' intangible manuscripts
- Kindergarten traffic safety teaching plan
- Ask for a propaganda article on flue-cured tobacco planting, which is suitable for reading aloud.
- Notice of Enterprise Safety Production Month Activities
- How to evaluate the "must see the house" of Shell Net (chain home)?
- Corporate Culture of China Petrochemical Corporation
- Safety tips for children's slides
- Children's songs about fire prevention and electricity safety
- Wenfeng Primary School Yaohao Yaohao List