Joke Collection Website - Bulletin headlines - Work summary and work plan of county water conservancy bureau
Work summary and work plan of county water conservancy bureau
I. Summary of Work in 20xx
(a) the completion of key work
1, the project is completed.
After three years of communication and coordination, three enterprises, namely xx Ji Zheng Thermal Insulation and Sealing Material Factory, xx Zhenhai Doors and Windows Factory, and xx Luer Metal Manufacturing and Installation Co., Ltd., were introduced, all of which passed the capital verification, with the capital verification amount of X million yuan, accounting for x% of the completed tasks.
2. Completion of investment promotion work
In 20xx, the investment attraction task of the Water Conservancy Bureau is X billion yuan (except for the three-year key task). X billion yuan has been completed, accounting for x% of the task. Among them: the investment task of water conservancy infrastructure construction is X billion yuan, of which X billion yuan has been invested, accounting for X %; of the task; Strive for funds of X million yuan, and the funds in place are X million yuan, accounting for X %; of the task; The task of introducing production and processing funds is X million yuan, and the production and processing funds have been invested X million yuan, accounting for x% of the task.
3. Completion of business work
According to the task indicators issued by the county party committee and county government, we mainly have eight business tasks. Details are as follows:
The first is the urban water source project. Due to the increasing population in this county, the urban water supply is seriously inadequate. In order to ensure the future water supply demand of the county, the Water Conservancy Bureau is fully promoting the preliminary work of the second water source project with a total investment of 457 million yuan. At present, the project proposal has been reviewed by the Songliao Committee of the Ministry of Water Resources and approved by the Provincial Development and Reform Commission. The feasibility study report of Dazhaizi Reservoir has been compiled by the Provincial Water Conservancy and Hydropower Survey and Design Institute, and X supporting elements have been completed by the Provincial Development and Reform Commission. In the case of incomplete elements, the provincial development and reform commission conducted an advanced consultation and demonstration, and submitted it to the provincial development and reform commission for approval after the land pre-examination, immigration outline and environmental assessment elements were complete. The preliminary design report and approval are expected to be completed before the end of May, and construction will start in the first half of 20xx, aiming to be completed by the end of 20 15 and put into use in 20 16.
The second is the regulation project of small and medium-sized rivers. 20xx urban defense continuous construction project 1 section, new construction 1 section, and regulation of small and medium-sized rivers.
(1) Yitong River City Defense Project: The expansion project of xx County of Yitong River (No.2 rubber dam to railway bridge section) was approved, with a total investment of X million yuan, and the main project construction task has been completed, with a total investment of X million yuan and an engineering quantity of X million cubic meters. Yitong River City Defense Project is an expansion project of the downstream development zone of railway bridge, with a total investment of X billion yuan. At present, the foundation of the site has been cleared. It is expected that the main earthwork will be completed in mid-June 1 1 and before the main flood season next year, which will provide flood control guarantee for the expansion of the development zone.
(2) Small and medium-sized river regulation project: * * There are x blocks, namely the regulation project of X Town (Xiaochengziqiao-Airport Bridge Section) in xx County of Santong River and the regulation project of Wudaogou Town Section in xx County of Santong River. The treatment project of X Town (from X Subbridge to Airport Bridge) in xx County of Santanghe River has been approved, with a total investment of X million yuan, and the project has started construction. At present, the masonry of X kilometers has been completed, and the engineering quantity is X million cubic meters. The main project can be completed before the end of the year. The treatment project of Wudaogou Town Section in xx County of Santanghe River is being submitted for approval, and construction can start next year after approval.
The third is the reinforcement project of dangerous reservoirs. This year, * * completed the reinforcement project of X Reservoir. At the beginning of the year, 1 1 key small (II) dangerous reservoir reinforcement design was completed and reported to the provincial offices for approval, with a total investment of X million yuan. The project started construction on April 25th, and now X blocks have been completed, and the other 5 blocks are being finished. It can be completed by the end of June and accepted by all provincial offices before the end of the year. At the same time, five small (2) expansion projects such as Chaoyanggou have all been completed. The total investment of the reinforcement project of X-block general small (II) reservoirs such as Dazhengjia is X million yuan. However, Tonghua Water Conservancy and Hydropower Survey and Design Institute reported the design report to the provincial office in mid-September because of its late preparation. The examination and approval can be completed in the near future, and construction will start early next year, and it will be completed that year, and it will pass the acceptance of the ministries and agencies.
The fourth is the rural drinking water safety project. In 20xx, there were 54 rural drinking water safety projects (4 independent projects of the school), including 48 deep wells and X springs, with a total investment of X million yuan. Up to now, X deep water wells have been drilled, and X deep water wells are expected to be completed by the end of 10. Three spring wells have been completed and three others are under construction. Four pipeline projects have been completed and the rest are being laid. All projects are expected to be delivered before165438+1October 20th. This project can solve the drinking water safety problems of X towns, X villages, X populations, X schools, teachers and students, and X large livestock.
Fifth, small-scale irrigation and water conservancy infrastructure projects. There are mainly two small irrigation and water conservancy infrastructure construction projects.
(1) The bidding for 20 12 small-scale key counties of irrigation and water conservancy with a total investment of X million yuan has been completed. The construction unit is under intense construction, and the main project can be completed before the end of the year. Twenty-seven individual projects will be built, including maintenance of Tangba X, new dam X and new electric irrigation station X, all of which can be completed before the main flood season next year.
(2) The total investment of the water-saving reconstruction supporting project of modern agricultural Heping Irrigation District is X million yuan, and the main construction contents are X kilometers of canal lining, 1 intercepting ditch and X canal system buildings. Construction started in April, and now the main project has been completed. The project has entered the final stage and can be completed before the end of the year.
Six, the second phase of soil and water conservation project in area X, strive for the special fund of X million yuan, and control the soil erosion area of 28.8 1 square kilometer. The project started construction in mid-April and has been completed.
Seventh, the reservoir resettlement support project. This year, we will strive for X billion yuan in direct subsidies for immigrants and project support funds, of which X billion yuan will be used to implement immigration support projects.
Eighth is flood control and drought relief work. Due to the heavy rain and snow this spring, in order to prevent the snowmelt flood, the Water Conservancy Bureau timely organized professional and technical personnel to inspect the small (II) reservoirs in the county during the spring flood season, especially the key flood control areas, flood control facilities and dangerous sections, and immediately dealt with hidden dangers when found. Do a good job in scientific water storage and safe water storage. At the same time, carefully analyze and detect the occurrence and development trend of snowmelt flood, so as to nip in the bud. Strengthen duty work. Since March 26th, the Water Conservancy Bureau has strictly implemented 24-hour duty, and relevant leaders have strengthened their duty and accommodation in shifts to ensure the safety of the spring flood.
After entering the flood season, the Water Conservancy Bureau has done a good job in the procurement of flood control materials, the prevention of mountain torrents and the compilation and revision of flood control plans from early on. On June 28th, the county flood control meeting was held to make overall arrangements for flood season matters. For the first time, the township and water administrative units (villages) signed the flood control responsibility system one by one, with one reservoir and one reservoir. During the main flood season, hydrological forecast should be done carefully, flood information should be released in time, industry supervision on the safety of reservoirs and ponds in the county should be actively carried out, dangerous situations of water conservancy projects should be actively organized and guided, planning, construction supervision and technical services of flood control and drought relief projects such as the reinforcement of dangerous reservoirs should be well done, drought statistics and reports should be carefully organized, and county-level drought relief service teams should purchase drought relief equipment, thus successfully completing various flood control and drought relief tasks. Especially under the direct leadership and command of the county party Committee and the government, it successfully resisted the "8. 16" catastrophic flood, ensured the flood control goal of "no dam break in the county, no dam break in the reservoir and no casualties", and provided a guarantee for the stable economic and social development and the safety of people's lives and property.
4. The completion of the city.
According to the requirements of establishing a national sanitary city in xx County, the Water Conservancy Bureau undertook the construction task of 1 1, with a total investment of X million yuan, which has been completed and reached the standards required by the superior. At the same time, he took the initiative to undertake the "Trinity Diversion" and the whole regulation project of Xiaodi River. Among them, the Xiaodi River diversion project with a total investment of X million yuan was completed in mid-September, and the water conservancy construction unit overcame many unfavorable factors such as many temporary construction projects, uncooperative masses and complicated working conditions. Next year, we will fundamentally solve the problems of insufficient river water and seriously affecting the quality of life of residents. Xiaodi River runs through the whole line, with a total investment of X million yuan, a total comprehensive treatment length of X meters, new construction, reconstruction and expansion of dikes of X meters, and 0/7 culverts and bridges. At present, all the bridges and culverts have been completed except 9 middle and lower reaches bridges and some of them are under construction. The project will completely eliminate the bottleneck of flood control, raise the flood control standard from once every five years to once every x years, solve the problems of flooding, serious urban waterlogging and serious lack of flood discharge capacity of Xiaodi River in flood season, and also provide flood discharge channels for waterlogging in county towns.
(II) Main working measures taken
First, scientific deployment and comprehensive water conservancy work. On March 13, the Water Conservancy Bureau held a county-wide water conservancy work conference, comprehensively arranged and deployed the water conservancy work throughout the year, adopted a brand-new performance appraisal method, decomposed the work tasks of all units and departments item by item, defined the work tasks, defined the work objectives, formulated work measures, and fully implemented the work systems such as "weekly meeting", "monthly dispatch", "quarterly report" and "annual assessment" to ensure that
The second is to implement responsibilities and highlight key projects. Small and medium-sized river regulation project, rural drinking water safety project, dangerous reservoir reinforcement project and key county construction project are the key livelihood projects in the county. In order to ensure that the project is completed and delivered on time, the Party Committee of the Bureau, together with the leaders and departments in charge of the above projects, implements the project guarantee system, which requires scientific arrangement, inverted construction period, safe construction, ensuring the progress and quality of the project, and comprehensively implementing the "weekly plan" and "prescription" construction management mode. Thus speeding up the construction of water conservancy projects.
The third is to do a good job in party building and promote the smooth development of business work. In order to ensure the normal activities of the grass-roots party branch of the water conservancy system, the party Committee of the bureau actively raises funds. The Water Conservancy Bureau invested X million yuan in grass-roots units, built five activity rooms in party member, equipped each party branch with audio-visual equipment and purchased activity equipment, and fully supported the grass-roots party building work. It has further enhanced the cohesion and combat effectiveness of grass-roots party organizations and laid a solid foundation for the smooth development of water conservancy work.
The fourth is to do a good job in building a clean and honest government and ensure the steady progress of all work. According to the actual situation of all departments of the bureau and grass-roots units directly under it, we will do our best to build a clean and honest government in the water conservancy system. At the beginning of the year, the Party Committee of the Bureau formulated the responsibility system for building a clean and honest government, the education plan for building a clean and honest government, the risk prevention and control plan for clean and honest government, and the publicity and education plan for combating corruption, which were deployed, inspected and assessed together with economic work and business work. At the same time, the members of the Party Committee of the Bureau are responsible for supervising, inspecting and guiding the party's work style and clean government construction of the units in charge. Wherever the work is managed, we should pay attention to the responsibility system and investigate the responsibility. Realize a sound system and effective measures. Decompose the objectives and tasks of building a clean government into teams at all levels, quantify them to the head, and realize the network system in which the "top leaders" take overall responsibility, vertically and horizontally. The work of building a clean and honest party style has been strengthened, and the honesty and self-discipline of leading cadres at all levels in the system have been further strengthened. So as to ensure the steady progress of water conservancy work.
(3) Achievements and honors
1, advanced individual
Mu Liming was rated as an advanced worker of rural drinking water safety in the whole province by the Office of the Leading Group for Rural Drinking Water Safety in X Province.
2. Senior unit
The Water Conservancy Bureau was rated as the advanced collective of rural drinking water safety work in the whole province by the office of the leading group for rural drinking water safety work in X Province.
Second, the existing problems
One is the shortage of professional and technical personnel. Due to the large number and wide distribution of water conservancy projects and limited professional and technical personnel, there is a problem of cross-use of personnel.
Second, the support of a single unit is not enough. In the process of water conservancy project implementation, the enthusiasm of individual units is not high, and there are certain difficulties in land acquisition, which seriously restricts the progress of water conservancy project construction.
Third, about the situation analysis.
In recent years, the state and province have issued a series of policies to control and promote water, which further highlights the strategic position of water conservancy, deepens the connotation of water conservancy work and broadens the development space of water conservancy. 20 1 1 the No.1 document of the provincial party Committee and the provincial water conservancy work conference issued six policies and measures to support the reform and development of water conservancy. The No.1 document of 20 12 and this year further clarified the policies to accelerate the development of water conservancy, and the current and future period is the peak period of water conservancy construction and development. Only by thoroughly understanding these favorable policies can we find the right direction and take the initiative in the new stage of water control development.
Iv. 20xx working point
(1) Three years of hard work in project construction
Strive to introduce 1-2 enterprises, with an investment of about x million yuan, and complete the three-year annual construction task of the project construction.
(2) Investment promotion work
Actively strive for funds, introduce production and processing enterprises, and ensure the completion of the investment promotion tasks assigned by the county party Committee and county government.
(3) Business work
1, water source project of Dazhaizi Reservoir.
Complete the approval of reservoir feasibility study before the end of 20xx, and complete the preparation and approval of preliminary design report before the end of May of 20xx. Construction started in the first half of 20xx, with an estimated investment of X billion yuan. It is planned to complete the dam foundation, main body and part of the project. Complete all engineering construction tasks before the end of 20 15.
2, small and medium-sized river management project.
In 20xx, it is planned to continue to build the Yitong River urban defense extension project to control three small and medium-sized rivers, that is, the Yitong River railway bridge to the downstream expressway bridge dike project, with a total investment of X million yuan, the Wudaogou town section of Santong River and the Liangshui town section of Liangshui River, with a planned investment of X million yuan.
3, dangerous reservoir reinforcement project.
In 20xx, it is planned to start the reinforcement project of X small (II) dangerous reservoirs with a total planned investment of X million yuan.
4. Water-saving renovation project in irrigation area.
20xx plans to invest 1 10,000 yuan to complete the water-saving reconstruction project of Shijiadian Reservoir Irrigation Area.
5, rural drinking water safety project.
In 20xx, the rural drinking water safety project plans to invest X million yuan to drill X deep wells and X springs, which can solve the drinking water safety of X villages and X million people. At the same time, in order to solve the drinking water safety of teachers and students in the school, X million yuan was invested and it is planned to solve the drinking water safety of X teachers and students in 5 schools.
6. The second phase project of soil and water conservation in black soil area.
In 20xx, it is planned to harness X small watersheds, namely Shijiadian and X small watersheds, with an area of xkm2 for soil erosion control and a total investment of X billion yuan.
7. Post-migration support projects.
In 20xx, strive for upward funds of 1 10,000 yuan to implement rural infrastructure construction and resettlement support projects.
8, flood control and drought relief work.
Actively do a good job in flood control and drought relief, do a good job in dispatching and analyzing the rain and flood situation in the county, provide reliable basis for scientific decision-making in time, and ensure the safety of the county.
In short, after a year's efforts, under the leadership of the leading group of the Water Conservancy Bureau and the joint efforts of all cadres and workers, some achievements have been made in water conservancy work, but there are also some shortcomings and deficiencies while summing up the achievements. We will make persistent efforts, blaze new trails, complete all the tasks assigned by our superiors in an all-round way, and hand in a satisfactory answer sheet to the people of the county.
- Previous article:Analysis of Japanese Loanwords and Japanese Cultural Characteristics (2)
- Next article:World No Tobacco Day activity theme plan
- Related articles
- Relocation Time of Dataozi Immigrants in Hanggin Banner
- Slogan of beef bone soup
- Yanjing classic advertising language
- After Xianjian 4 joined Qionghua Sect, Martial Uncle asked us to go down the mountain. Why are we going down the mountain?
- Wang Zihua's wonderful quotations.
- Kindergarten Small Class Teaching Plan "I Can Dress"
- What does a criminal police do?
- How much do you know about the history of the party? Handwritten newspaper is very simple.
- Fifth grade essay on pseudo-illiteracy
- Come on in English