With the continuous progress of society, there are more and more situations where meeting minutes need to be used in handling affairs, and the minutes require meeting procedures. Clear, clear purpose, prominent center, accurate summary, well-structured and concise language. So how are general meeting minutes written? The following are sample minutes of regular safety meetings that I collected and compiled (5 general articles). Welcome to read and collect them.

Minutes of regular safety meeting 1

Time: xx hour, xx month xx, xxxx year

Location: On-site conference room

Moderator : xxx

Record arrangement: xxx

Participating units and participants:

Supervision units: xxx (safety supervisor), xxx

Construction unit: xxx, xxx, xxx, xxx, xxx, xxx

Main topic of the meeting: Regular safety meeting

Meeting content:

xxx (safety director) :

Generally speaking, the first half of the month is okay. In the second half of the month, the main safety inspection of the chimney and the implementation of safety responsibilities are carried out, including weekly inspections and monthly inspections.

xxx (Safety Officer):

1. Pay close attention to the chimney, hold a safety meeting once a week, and convey the information released above to the construction workers below. Safety is emphasized every day. The tower crane is working normally. We will have a meeting with the driver immediately to pay attention to safety. There are also two teams from the local area, and regular safety meetings will be implemented immediately.

2. The chimney safety passage has been confirmed and implemented and has been done well, but the climbers and safety belts must be implemented as soon as possible.

3. Clean and tidy the canteen and dormitories.

xxx (Safety Officer):

1. Civil construction’s high-altitude operations, cross-cut work, falling objects and civilized construction have made great progress compared with the previous months.

2. When constructing the smoke tower at night, the top light of the tower should be turned on first before proceeding with the construction.

3. The wind has been very strong recently, and it is easy to hit the crane and then hit the xx tower crane. I hope everyone will pay attention.

4. Implement the chimney climber and climbing rope as soon as possible.

xxx (Safety Supervision):

1. There are still many problems in the second half of the month, which must be implemented in a practical and detailed manner.

2. The safety net must be in place. Construction is getting higher and higher, and there are more cross-cutting operations. Safety hazards must be minimized and work must be stopped immediately for rectification when discovered.

3. The tower crane must be reinforced and secured, otherwise it is not allowed to be used.

4. Chimney hoisting, the hoisting objects are heavy, and it is easy for falling objects to occur, so the weight of the hoisting objects must be reduced. Up to 6-7 sticks each time.

5. The safety cloth must be tightened tightly to prevent it from being completely blown away by strong winds.

6. Avoid high-altitude operations and cross-cutting operations as much as possible.

7. Chainsaw users must wear goggles.

8. The inspection will begin next Tuesday. If the above problems are found, the assessment will be carried out immediately. Minutes of regular safety meeting 2

Meeting time: 3:00 pm on x month x, 20xx (Tuesday)

Meeting location: Conference room on the second floor of Building 2#, Tianjiao Xi'an< /p>

Participants: See the sign-in form

General contractor: Duan Ping, Zhang Xinyu, Li Youming

Subcontractors: Zheng Hongzhong, Deng Hongze, Chi Yongqiang, Zhang Xianshun, Xiao Anjun , Wang Zhijun, Zhang Jun, Shang Jingming, Hao Yingxiong, Bai Haijun.

Moderator: Duan Ping (Project Manager)

Main content of the meeting:

About the safety and civilization of the 2# building construction site, site material planning and classification, and project quality , project progress and other issues.

1. Safe and civilized construction

1. Materials at the construction site are required to be classified and stacked neatly. Turnover materials, finished materials, and raw materials are not allowed to be stacked randomly. Steel pipes are stacked on the rack in layers according to different lengths. .

2. The steel bar site is isolated separately and enclosed with scaffolding to allow only a small door for personnel to enter and exit. The safety and civility slogans of the steel bar processing shed need to be reset.

3. The safety channel on the south side will be strengthened for protection, and safety and civility slogans will be set up at the entrance of the channel as required.

4. Reorganize the steel waste at the gate of the construction site and build a waste pool to store the steel waste.

5. The site on the southwest side of Building No. 2 was reorganized. Multi-layer shelves were built using rack pipes and wooden boards were laid to stack steel pipes, fasteners, jack wires and other materials. 6. Flammable and explosive items (such as acetylene, oxygen, etc.) must be stored separately in a cool place, away from open flames. 7. Set up a safety shelter above the ground pump and add safety and civilization slogans. The foundation pit on the north side of the pump truck will be fenced with steel pipes.

8. The construction machinery of the labor party must comply with the specification requirements of "one machine, one box, one gate and one protection", and check the temporary power consumption at the construction site. It is strictly prohibited to make unauthorized connections to avoid potential safety hazards. First-class boxes, The secondary box shall be marked and the electrical system diagram shall be pasted in the distribution box.

9. For cleaning and maintenance of roads at the construction site, the project department and the labor service unit take turns cleaning every week.

10. The erection of the cantilevered scaffolding by the scaffolder does not meet the requirements of the specification. The overlap length of the scissor braces is at least one meter. There must be no less than three rotating fasteners in the overlap area. The angle of the scissor braces is 45 degrees to 60 degrees. During the period of time, the damaged safety net must be replaced in time, and the protection of "four exits and ten edges" must be in place.

11. There are potential safety hazards in the unloading platform. The length extending into the building must not be less than 1.5 meters. The lengths of the steel wire ropes on both sides are inconsistent (resulting in uneven unloading). The upward tilt angle of the platform is not enough and there is no safety. Protective measures, no weight limit signs, etc.

12. For the use of "Three Treasures", safety belts must be worn when working at heights (for high and low use), and safety helmets must be worn when entering the construction site. Violators will be fined according to the regulations of the project department.

13. The elevator shaft is not well protected, and the adjacent openings and vents must be protected layer by layer.

14. The tower operator is required to inspect the tower crane once a week and form inspection records. The operation room of the tower operator must be climbed up and down via a ladder. It is strictly prohibited to use scaffolding boards to get up and down the tower crane from the building.

15. It is strictly forbidden to make calls when working in dangerous areas (high altitudes, adjacent openings, etc.) to prevent the occurrence of safety accidents.

16. You should be careful when smoking at construction sites, and do not throw cigarette butts anywhere, as they can easily cause fires.

17. Submit the special operation personnel’s employment certificate (issued by the Ministry of Construction), safety officer’s employment certificate and safety assessment certificate to the project department for archiving.

The above safety and civility issues must be rectified within three days, otherwise the project payment will not be settled on the 16th floor.

2. Project Quality

1. In order to ensure water use at the construction site (main structure and secondary structure), it was decided to build a water reservoir at the construction site. The specific matters will be decided by the project department and the labor service Agreement between the company and the secondary structure party.

2. After the water tank is constructed, plumbers and electricians will connect a tee from the water tank to each floor upstairs for use as secondary structural water.

3. Since cement stirrups are not very practical and cannot guarantee the spacing requirements between double-layer steel bars, Dongfu Labor Service Company is required to replace cement stirrups with steel stirrups starting from the 16th floor.

4. When inspecting the steel bars on each floor, the steel bar team needs to conduct self-inspection. The steel bar team leader will take the lead in the inspection. After passing the inspection, it will be reported to the labor service unit for inspection. Finally, it will be reported to the project department for inspection and the supervision unit will be notified. The installation during the roof steel inspection is simple. For horse trails, the finished product must be protected to prevent trampling on the steel bars, otherwise the steel bars will not be inspected.

5. The poured concrete must be cured, and the curing time shall not be less than 7 days. Test blocks with the same conditions shall be left with the layers.

6. Starting from the 16th floor, a separate support system is set up for the formwork at the back pouring zone, otherwise it will not be accepted.

7. Due to the tight construction period, carpenters should promptly clean up construction waste after removing formwork, and the construction of secondary structures must not be affected, otherwise they will be fined.

8. When carpentry and steel work are carried out, they should be reasonably overlapped and cooperate with each other. There should be no scene where the mold is closed first and then the reinforcement is tied. Otherwise, rework and correction will be ordered; during masonry work, bricklayers and electricians must cooperate with each other. It is not allowed to chip away at the wall later, otherwise a one-time fine of RMB 5,000 will be imposed and the company will be responsible for repairs.

3. Project Progress

1. Starting from the 16th floor, the concrete pouring time must be reasonable, and the pouring time must not be too long due to machinery or labor, otherwise economic measures will be taken.

2. The project department guarantees that the commercial concrete provided has good workability and meets the construction requirements. If the labor service unit needs to promptly notify the project department to solve the problem due to concrete quality during pouring, it is not allowed to add water without permission, otherwise a fine will be imposed if found. Five thousand yuan.

3. Starting from the second floor, clean up one floor at a time. Each floor is connected to the secondary structure. In order to prepare for the secondary structure construction smoothly, workers should be arranged to clean up as soon as possible. If the labor service company does not The secondary structure party will send personnel to clean up as soon as possible, and the costs incurred will be deducted from the labor service company's project funds.

3. The project progress this week will be carried out according to the actual situation. This Thursday, the project department and the labor service company will jointly formulate a weekly progress plan based on the actual situation. After both parties sign, the construction will be carried out according to the progress plan, and it will be completed one week later Compare, analyze, correct and implement. If the progress is delayed due to subjective reasons of the labor party, financial penalties will be imposed based on the delay time.

This meeting minutes has the same legal effect as the "Project Contracting Contract" and can be used as the basis for project payment settlement, and is valid for all types of work.

Beijing Rishengda Construction Enterprise Group Co., Ltd.

Tianjiao Xi'an 2# Building Project Department

Minutes of the regular safety meeting on x, month x, 20xx 3

Time:

xx, month, x day

Location:

Meeting room

Meeting theme:

Safety production meeting:

Main contents:

1. The Spring Festival has passed, reminding everyone to take heart and raise awareness of production safety and never relax. Strengthen production safety education for resumption of work after the holiday.

2. Check the implementation of the matters agreed at the last regular meeting and analyze the reasons for unfinished matters.

3. All departments and workshop directors reported on the recent problems in production safety, proposed specific solutions at the meeting, and implemented them in accordance with the "four determinations" principle;

4. Resolve production safety matters that require coordination.

5. The leader on duty should keep records on duty and deal with problems in a timely manner if problems are discovered. Minutes of the regular safety meeting 4

Meeting time: x, month x, 20xx

Meeting location: Student Union Office

Attendants: All members of the Red Cross Affairs Department< /p>

Moderator: Minister Ding Li

Recorder: Yin Guandong

The content of the meeting is as follows: (The meeting was mainly delivered by Minister Ding Li, supplemented by the deputy minister.) < /p>

1. Several issues discovered recently

1. Some students have complaints about work and have a negative attitude. I hope everyone can understand each other and unite to make progress.

2. I hope everyone can overcome the difficulties in volunteer service activities.

3. Everyone should have a sense of community and departmental honor.

2. The trial period is one month.

2. The nature of the work of our department:

Carry out volunteer service activities in the fields of medical care, first aid, health, etc., and participate in volunteer activities carried out by other departments of the School Volunteer Association.

3. Recent work arrangements:

1. China-South Korea exchange meeting (13-15 days), volunteers are needed to provide voluntary services. Statistics of willing students.

2. Next Thursday (October 20), we will cooperate with the Wuhan Blood Center to hold an adult ceremony event of "commemorating growth in the form of blood donation". There will be a full-day duty schedule, statistics Duty hours.

3. Students who participate in volunteer activities at the School of Journalism from the 13th to the 15th and Wednesday to Friday, the first class needs to go to the office in the morning to get the volunteer card, and the last class needs to return the volunteer card. .

4. Department dinner on Saturday night

5. The regular meeting of the School Volunteers Association will be held next Wednesday. I hope everyone will take the initiative to speak freely.

4. Some details

1. Everyone should pay attention to receiving group emails and reply to them.

2. When requesting leave on duty, a leave note must be provided, and the leave note will be sent out via group email later.

3. From now on, you will arrive 10 minutes early for regular department meetings and 15 minutes early for regular CCP meetings.

4. Regular department meetings may be scheduled every Friday in the future.

5. Respond politely to text messages to avoid delays.

6. Silence your mobile phone during meetings.

7. Pay special attention to courtesy to the senior brothers and sisters in other departments.

8. When writing official documents, pay attention to the format and content.

9. Newcomers can communicate more with their brothers and sisters, pay attention to time, and avoid classes and breaks.

5. Speak freely.

1. The significance of joining the Red Cross Society

2. How to become a member of the Red Cross.

3. How to deal with the relationship between work and study.

6. Minister Ding Li introduced some future activity arrangements

1. The blood collection vehicle enters the campus activity jointly organized with the Wuhan Blood Center once a month, starting from this semester. We will plan to set a theme for the month, and I hope you can come up with more ideas.

2. Red Cross Society member training in cooperation with the school hospital.

3.Promote World AIDS Day on December 1st.

4. First aid knowledge contest in December

5. Garden party in December.

6. Tuberculosis prevention and control publicity activity on March 24.

7. In early May, new Red Ten members will be recruited.

8. May Red Cross Member Training

7. The minister made a final summary, emphasizing "responsibility", and the meeting ended. Minutes of regular safety meeting 5

Meeting time:

XXXX, XX, month, XX, XX:XX

Meeting location:

Scheduling meeting Room

Moderator:

XXX

Participants:

XXX XXX XXX XXX

Meeting content :

The leaders of each workshop and department briefly summarized the work in XX months of XXXX, and reported the work arrangements for XX months of XXXX. The minutes of the meeting are as follows:

1. Each workshop has done a good job Summary of the safety activity month in XX.

2. In XX, the State Council issued a notice (XXXX Guofa No. XX) on further strengthening production safety work, requiring all units to use Friday activity time and safety symposiums to organize employees to study seriously. .

3. In the future, each workshop should institutionalize the investigation and handling of safety hazards, and report hidden hazards that do not fall within the scope of XX maintenance and treatment in written form to the Mobility Department for processing in advance.

4. Entering the month of XX, it is necessary to strengthen the inspection of fire protection work in the

5. Strictly prevent the occurrence of "three violations", and the safety system must be implemented consistently; drinking in the middle of the shift and sleeping on duty during the night shift must be eliminated, and inspections of labor discipline and the handover system before and after shifts must be strengthened. .

6. Learn the lessons from the XX major fire accident on XX on XX, strictly investigate the loopholes in management, and strengthen the study of knowledge about hazardous and explosive materials.

7. Strengthen the safety management of XX and electrical maintenance. The maintenance plan must be standardized and the operations must be marked out to prevent the occurrence of safety accidents in the XX workshop on XX month XX.

8. In XX, each workshop should complete the safety acceptance work of the X quarter to build a good foundation for next year.

XXXX year XX month XX day;