Joke Collection Website - Bulletin headlines - What is a safe and civilized construction site?
What is a safe and civilized construction site?
1. Set up fences and gates higher than 2.5m around the construction site. The fence materials should be strong, beautiful, and clean, and the fences should be strong and safe. Equipped with spotlights and green belts, the construction site will be “landscaped”. The Huaxi Group logo sign is hung above the main entrance gate of the construction site. A standardized and beautiful light box with one picture and eight signs is installed at the entrance. Namely: project overview board, safety production board, civilized construction board, corporate performance board, list of key management personnel, safety notice board, fire protection board, construction site general layout plan, and new technology application board. The production and placement of picture boards shall be strictly carried out in accordance with Huaxi Group's "Construction Site Corporate Image Management Regulations". Guards are set up at the entrance and exit of the construction site in accordance with regulations. All personnel entering the construction site must wear qualified safety helmets. All on-site construction workers must wear uniform clothes and work cards.
2. The construction site implements "three guarantees" in front of the door. Before leaving the construction site, the tires of construction transportation vehicles and excavating earthmoving equipment must be flushed and mud removed. Vehicles transporting sand, stone, cement, earthwork, garbage and other dust-prone vehicles must be transported in a closed manner. When transferring construction materials, garbage, soil, etc., measures should be taken not to pollute the urban environment. Measures should be taken to prevent dust, prevent noise, and prevent construction from disturbing residents at the site. Night construction shall apply for a night construction permit according to regulations. It is strictly prohibited to burn toxic and harmful substances on site. The mixing shed is surrounded by colorful strips of cloth and a dense-mesh safety net is installed externally. The ceiling is covered with 50mm thick wooden boards, and a layer of bamboo rubber board is laid on top. A sprinkler device is installed on the mixer to facilitate dust-proof.
3. It is strictly prohibited to throw construction waste at high altitude to prevent dust from flying. The removal and transportation of construction waste must be carried out in container sealing. Wet methods must be used to clean the site and floors. No mixing of cement is allowed on site. Consciously abide by relevant environmental protection laws and regulations, and take measures at the construction site to prevent or reduce the harm and pollution of dust, waste gas, waste water, solid waste, noise vibration and construction lighting to people and the environment.
4. The main passages and material storage areas at the construction site must be hardened with concrete floors, and the material sites must be flat and compacted. Temporary facilities, machinery and equipment, various building materials, etc. are reasonably arranged according to the general plan. Materials are stacked neatly and reasonably arranged. Steel materials are classified and put on the shelves. Steel molds and wooden beams are stacked squarely. Fasteners are cleaned and put into trays. Inflammable and explosive items Store in categories according to regulations. And at the same time, various materials are marked. Facilities for washing vehicles will be set up at the exit of the site, and third-level sewage sedimentation tanks and drainage ditches will be set up on site to ensure a good drainage system. Construction sewage, domestic sewage and sewage discharged from transportation vehicle cleaning shall not be discharged into urban sewage pipes without passing through the sedimentation tank. It is strictly prohibited to discharge sewage into rivers and rainwater pipes: there should be no accumulation of water in the site and the roads should be smooth, solid and unimpeded.
5. Temporary facilities at the construction site shall be erected according to the general layout plan, and the construction operation area shall be kept at a safe distance from the office area and living area. Staff dormitories shall not be set up in unfinished buildings. There is greening arrangement in the construction site. The construction site offices, conference rooms, staff accommodation, etc. have good lighting, ventilation, sanitation and fire protection, meet the requirements of relevant standards, and are safe, simple and applicable. The living area is managed by dedicated personnel responsible for daily hygiene and environmental management. The management of the canteen complies with the provisions of the "Food Hygiene Law of the People's Republic of China". The "Hygiene Permit" and the "Health Certificate" of the cooks are complete and hung in the canteen; the canteen is equipped with suspended ceilings, screen doors and windows and the lower part of the outer door. 60cm high iron sheets and other effective measures to prevent flies and rats, and keep them clean and hygienic regularly. Ensure the supply of hygienic drinking water, and the installation of shower rooms meets the requirements.
There is one bunk per person in the dormitory, and daily necessities are neatly placed, with three separate lines for quilts, towels, and shoes. Production tools are stored in a unified warehouse; domestic waste is managed by dedicated personnel, and is loaded into containers and cleaned in a timely manner. And establish a temporary housing management system with dedicated personnel for management. The project management department must establish a sanitation responsibility system, conduct regular cleaning and sanitation inspections every day, and issue criticism and fines to dormitories that do not meet standards throughout the construction site. It is forbidden to mess around with wires indoors, and it is strictly forbidden to use electric stoves to open small stoves. Smoking in bed is strictly prohibited. Water-flush toilets that meet sanitary standards are set up on site, and dedicated personnel are assigned to clean and maintain hygiene. Tea kiosks, blackboard newspapers, publicity boards, and newspaper reading boards are set up, and an "Employee Home" activity room is set up for employees to study and entertain.
6. Establish health care and first aid measures at the construction site, set up health care medicine boxes and first aid equipment, and set up a medical staff.
Carry out hygiene and disease prevention publicity and education at any time, and regularly carry out drug detoxification in living areas, especially canteens, toilets and other places, to ensure the health of employees.
7. Various signs and slogans hung or written on the construction site must be strictly implemented in accordance with the "Construction Site Corporate Image Management Regulations" and must be neat, standardized, beautiful, clean, and appropriately positioned. The safety slogans are eye-catching and the hanging signs are safe and reliable. 8. During the construction of the construction site, closed construction is carried out, and the internal and external protection meets the requirements. The dense mesh safety net must be tied with ropes, and the tie must be firm. The nets must be set up tightly, and the brackets, load-bearing platforms, and construction elevators should also be handled accordingly. To be standardized, neat, beautiful and safe; firm and in compliance with relevant standards. Scaffolding tubes and edge and entrance protective railings should be painted in different colors according to usage requirements.
9. The construction site must establish and improve a public security and fire management system,
implement corresponding public security and fire protection measures and responsible persons, configure fire protection facilities and fire fighting equipment in accordance with regulations, and handle emergency operations. Fire approval procedures and implementation of fire guardians. Multiple fixed smoking rooms are set up on the construction site, and random smoking is strictly prohibited.
10. Implement strong management of each subcontracting unit, strictly control the qualifications of each subcontracting unit, and manage, control and assess the safety, quality, progress, civilized construction, etc. of each subcontracting unit ; Conduct on-site inspections of the technology, economic strength, staffing situation, social reputation and safety technology level of each subcontracting unit. The qualifications, technical level, safety level, staffing, etc. of each subcontracting unit must be reported to the supervision company and management company for review and approval before entering the site. 11. This project department will provide work-related accident insurance for employees and accident injury insurance for special operations personnel and special types of work.
12. This project plans to invest more than 10,000 yuan in safety protection facilities, labor protection supplies and on-site civilized construction, which will be earmarked for special purposes. 13. The construction site should plan and clarify the person in charge of safe and civilized construction in the area. The person in charge of each area is responsible for the safe and civilized construction in the area. The project management department conducts monthly assessments and evaluations, rewards excellence and punishes irregularities to promote the smooth development of safe and civilized construction.
- Related articles
- What about the unwanted Guanyin Buddha statue?
- What should we pay attention to during the annual inspection of the construction company’s credit manual?
- If you want to open a bakery shop in Taiyuan, what are the requirements and how much does it cost?
- Essay about energy
- Planning and Layout of Xiaolan Economic and Technological Development Zone
- Dragon Boat Festival Trade Union Activity Plan
- Children's character slogan
- Organize a friendly basketball match activity plan
- English words about public places
- Where was Chen Baocang born?