Township flood control measures should timely allocate relief funds and materials, organize and resettle the affected people, make temporary living arrangements for the affected people, be responsible for the restoration and reconstruction of the collapsed houses of the affected people, ensure that the victims have food, clothing and housing, and effectively solve the basic living problems of the affected people. I have compiled the information of flood control schemes and measures in villages and towns for everyone. For your reference, please refer to.

?

?

I. General rules 1, compilation purpose

In order to do a good job in flood prevention and disposal, ensure efficient and orderly flood fighting and rescue work, minimize casualties and property losses, and ensure comprehensive, coordinated and sustainable economic and social development, this plan is formulated in accordance with the requirements of the State Council and the unified arrangements of the people's governments of provinces, cities and counties, and combined with the actual situation of our town.

2. Compilation basis

According to People's Republic of China (PRC) Water Law, People's Republic of China (PRC) Flood Control Law, People's Republic of China (PRC) Flood Control Regulations, People's Republic of China (PRC) River Management Regulations, People's Republic of China (PRC) Flood Control Law Implementation Measures, Jiangxi River Management Regulations and other laws and regulations.

Second, the basic situation xx Town is a large alluvial continent in the middle and lower reaches of the Yangtze River, surrounded by water. Fiona Fang 104 square kilometers, with an area of 54 square kilometers and an area of 56,000 mu of cultivated land (cotton planting area of 50,000 mu); Administer 12 administrative villages, 159 villagers' groups, 8,700 farmers and 42,000 people. Key enterprises 10, 22 primary and secondary schools (including junior high school 10 and primary school 17), and township units 19.

Xx levee was built in 1954, with a total length of 64 Li. The soil structure is complex, half of which belongs to sandy soil structure, with a width of 7? 10m, with dike height of 22. 23 meters (mouth elevation), 22 buildings with the size of * * * crossing dike (including drainage machine station 10 and drought-resistant gate 12), and the total length of dike stone slope protection is only 10 km.

Main hidden dangers: 700 meters (2 1+300-22+000) upstream burst dike section in 1983, with serious leakage and concentrated bubble springs; ② 2700 meters (27+000? 29+700) serious bank collapse; (3) The foundation sand of XX100m (4+200-4+300) outer gate is lost, and the gate is in disrepair and seriously damaged; (4) There is no slope protection for XX meters of the XX lattice dike, and the bank collapses seriously.

Third, the organization and command system The town government set up a flood control emergency headquarters, which is responsible for the emergency response of flood control in the town.

1, town flood control in emergency headquarters (hereinafter referred to as the town headquarters)

(1), town headquarters

Total finger swing length: xx (Party Secretary)

Executive Deputy Commander: xx (Deputy Secretary of the Party Committee and Mayor)

Deputy Chief Finger Swing Length: xx

Member: xx

(2) Division of command:

(1) Division of upstream headquarters (xx, xx, xx responsibility dike section)

Finger swing length: xx

Swing length of secondary finger: xx

Technician: xx

Member: xx

Material distributor: xx

(2) the midstream headquarters (xx, xx, xx responsibility dike section)

Finger swing length: xx

Swing length of secondary finger: xx

Technician: xx

Member: xx

Material distributor: xx

(3) Division of downstream headquarters (xx, xx, xx responsibility dike section)

Finger swing length: xx

Swing length of secondary finger: xx

Technician: xx

Member: xx

Material distributor: xx

(4) xx headquarters (xx responsibility dike section)

Finger swing length: xx

Swing length of secondary finger: xx

Technician: xx

Member: xx

Material distributor: xx

⑤ zhonghu headquarters (xx dike section)

Finger swing length: xx

Technician: xx

Member: xx

Material distributor: xx

⑥ Logistics Headquarters

Finger swing length: xx

Swing length of secondary finger: xx

Member: xx

2, other flood control headquarters

Villages should set up flood control headquarters or corresponding professional flood control and disaster relief organizations in flood season to be responsible for flood control work in their villages; In case of major emergencies, a temporary command organization can be set up to be responsible for emergency handling.

Four. Emergency measures for different water levels 1. When the Yangtze River flood reaches the warning water level (17.70m, Wusongkou elevation), under the unified leadership of the town party committee and the town government, the town flood control chief commander or executive deputy chief commander will preside over the consultation, mobilize and deploy flood control work, and declare an emergency flood control period; The town party Committee and the town government sent a working group to guide the flood control work of each dike section; The village patrol and rescue team are on the levee and are heavily guarded. Every 1000m is a patrol section, and they patrol around the clock to check risks. 3 rescue teams in Murakami, 2 rescue teams in Nakamura and Murakami 1 rescue team. (30 persons per person)

2. When the flood reaches 1983 water level (xx water level is 20.3 1 m), all village patrols, rescue teams and transport teams will go to the embankment, with a patrol section every 500 meters and a rescue team (30 people) every 1000 meters; At the same time, according to the water situation, the headquarters took emergency measures such as temporary heightening and dam reinforcement to ensure dam safety.

3. When the flood reaches the water level 1998 (xx water level 2 1.20m), the whole town enters the first-level emergency, and all forces go all out to prevent the flood. Rural patrol, rescue team, transport team and reserve team are all on the levee; Every150m is a patrol section, patrolling 24 hours to check risks; Every 500 meters a rescue team (personnel 30? 50 people).

Verb (abbreviation of verb) Emergency evacuation plan 1. Risk decomposition analysis:

(1) and 1983 upstream burst their banks, resulting in serious leakage. In Paoquan area, if a catastrophic flood occurs once in 98 years, the possible maximum burst width is 60? 70 meters, with a peak flow of 2,070 cubic meters per second, the flood will descend from Jiajiang River, and the No.3 and No.3 banks on both sides will be washed away by the flood, and then flow downstream in different directions after passing Hanfengwei and xx Dongsha Highway.

(2) The possible maximum breach width of the catastrophic flood in 1998 is 80? 100 meter, with a crevasse peak flow of 2300m3/s, the flood will flow through the whole territory of xx village and xx territory from different directions, and at the same time flood the xx and xx ceilings downstream.

(3) When the breach appears at the junction of xx dike and levee, the possible maximum breach width is 40? 50 meters, the crevasse peak flow is 1600 cubic meters per second. The flood first entered xx village, and the xx dike burst, flowing upstream from Jiajiang River, and the contour lines below 2 1.5 meters were all submerged.

(4) When the 4)xx outer door breaks, the maximum width of the break is 40? 50 meters, the crevasse peak flow is 1700 cubic meters per second. The flood first enters the territory of xx, and flows upstream from xx Wei. At the same time, it may burst into Jiajiang River and go upstream along Jiajiang River.

2. Alarm mode:

The whole town uses gong beating, which is implemented by the commanders as appropriate.

(1), ring three times, indicating that there is a major danger;

(2), continuous blow, said has broken;

3. Evacuation:

In case of collapse, the whole town will be blacked out first.

(1), the upstream burst its banks in 1983, and the upstream headquarters organized the implementation of personnel evacuation plan, with commander xx and deputy commander dredging; Deputy Secretary of the Party Branch of Xx Village, Secretary of the Party Branch of xx Community, and Secretary of the Party Branch of xx Village; All personnel on both sides of the breach were evacuated to xx 1? Groups 2 and xx3? In group 4, all residents in the polder area were evacuated to the levee, and if necessary, they were transferred from the levee to Madang or other places outside the polder area by rescue boats; A few residents stranded in polder areas who cannot be evacuated in time can be evacuated to high-rise buildings for assistance; At the same time, the upstream headquarters mobilized ships to look for trapped people in the polder and transferred them to temporary residences.

(2) The ninth regiment of xx has burst its banks, and the Mid-stream Command has organized the implementation of the evacuation plan, with commander xx and deputy commanders XX and XX; Xx village party branch secretary xx concrete implementation. Residents on both sides of the breach were evacuated to Dongdaokou levee and Beitai levee, and residents of Xiaoping Dingfang and xx village were evacuated to nearby levees. If necessary, evacuate to Madang or other places outside the levee by rescue boat: if it cannot be evacuated in time, evacuate to nearby high-rise buildings for rescue; The midstream headquarters mobilized ships to search for trapped people and evacuated to the temporary residence of xx Wei and xx Wei.

3. When a breach occurs at the junction of xx dike and levee, the downstream headquarters shall organize the implementation of this plan, with the commander-in-chief xx and the deputy commander-in-chief XX; Xx village party branch secretary xx, xx village party branch secretary xx specific organization and implementation; The residents at the breach were evacuated to xx 13 group levee and xx Damiao levee respectively, and then evacuated to Madang by boat from the levee when necessary. All personnel in xx and xx polder were evacuated to the levee, and the downstream headquarters mobilized boatmen to find the trapped personnel in the polder.

4, xx burst outside the door, by the middle and downstream headquarters * * * to organize the implementation; The midstream headquarters is responsible for the evacuation of residents on both sides of the breach, and the downstream headquarters is responsible for the evacuation of personnel in xx and xx villages. The middle and lower reaches headquarters organized and mobilized ships to search and rescue the trapped people in the village.

Six, flood aftermath, do a good job in the disaster area living supply, health and epidemic prevention, relief materials, public security management, school resumption, water damage repair, resume production and rebuild their homes and other aftermath.

1, disaster relief

(1) When a major disaster occurs, a disaster relief headquarters will be set up to be responsible for the organization, coordination and command of disaster relief. According to the actual needs of disaster relief work, all relevant departments and units sent liaison officers to participate in the work of the headquarters office.

(2) The civil affairs department is responsible for the life assistance of the affected people. It is necessary to timely allocate relief funds and materials, organize and resettle the affected people, make temporary living arrangements for the affected people, be responsible for the restoration and reconstruction of the collapsed houses of the affected people, ensure that the victims have food, clothing and housing, and effectively solve the basic living problems of the affected people.

(3) The health department is responsible for deploying medical technical forces, rescuing the injured and wounded due to disasters, disinfecting pollution sources, and carrying out emergency treatment on major epidemic situations and diseases in disaster areas to prevent the spread and spread of epidemics.

(4) Organize the removal of pollutants that may cause environmental pollution and protect the normal living environment in the disaster area.

2, flood control materials supplement

(1) After the flood, the consumption of materials for flood control and emergency rescue should be found out and summarized in time, and supplemented in time according to the requirements of graded financing and conventional flood control.

3, water damage engineering repair

(1) For the water-damaged projects that affect the current flood control safety and water supply safety, we must pay close attention to finding out the situation, making plans and implementing repairs. Flood control projects should strive to restore their main functions before the next flood.

(two) the special communication facilities for transportation, electric power, communication, meteorology, hydrology and flood control that have been destroyed by water shall be repaired and restored as soon as possible.

4. Post-disaster reconstruction

After the flood, all relevant departments jointly carried out post-disaster reconstruction work under the unified leadership of the town government. In principle, it should be restored according to the original standard. If conditions permit, standard refactoring can be improved.

?