Joke Collection Website - Bulletin headlines - Summary of safety production work in construction units
Summary of safety production work in construction units
Time flows in a hurry like running water. A period of work has ended. After the accumulation and precipitation in the past period, we have made great improvements and changes. Should we write a good review? Do you want to record your work summary? How to write a work summary to be more eye-catching? The following is a summary of the safety production work of construction units that I carefully compiled (selected 5 articles), I hope it can help everyone. Summary of safety production work of construction units 1
1. Basic situation
This time, x Baique Temple, x Yuanguang Temple, x Hongfo Pagoda, x County Tongchang Nan Temple, etc. were inspected Heritage buildings. Through on-site inspections, we mainly inspected the main hall facilities, fire safety facilities and equipment, circuit safety equipment, monitoring facilities, management conditions, etc. of the cultural relics building.
2. Inspection results and measures
During the inspection, the overall environment of most cultural relics building units was relatively clean and tidy, there was no open fire in the main hall, the distribution box circuits were neat, and fire-fighting equipment was complete. The pressure is sufficient and can be used normally. There is a dedicated person to take care of it. Cultural relics management responsibilities are clear, the system is sound, and the work content is clear. Duties and safety inspections are adhered to. The overall inspection situation is good, but some cultural relics building units also have some safety hazards. The working, living and duty facilities of individual cultural relics and ancient building units are simple, the internal settings are chaotic, and there are too few people on duty. During the on-site construction of Baique Temple in X County, the accumulation of debris was not cleaned up in time, and the sanitary conditions were poor. Inflammable materials were randomly placed in the main hall. There are unauthorized connections in the distribution box; a large amount of flammable materials are piled up at the Yuanguang Temple site in X County, and the fire extinguishers are all under pressure. There are unauthorized connections in the east wing, and flammable materials are piled under the distribution box.
Currently, in response to inspection issues, the site immediately requires the cultural relics building unit to make rectifications. The production, use, storage and operation of flammable and explosive dangerous goods are strictly prohibited within the protection scope of the cultural relics building, and the stacked flammable items and garbage are cleared within a time limit. , strictly control the use of open flames, and standardize the management of fire and electricity. At the same time, our bureau will continue to follow up and review.
3. Next steps
(1) Strengthen management and establish a long-term mechanism
On the basis of doing a good job in daily safety and security work, timely Convene a joint meeting to analyze and study outstanding problems in safety work, formulate specific and feasible safety measures, and actively organize personnel to conduct fire drills to comprehensively enhance the safety awareness of managers.
(2) Clear division of labor and assign responsibilities to each person
Our bureau regularly supervises and inspects safety work, conducts timely investigations and studies on the characteristics of safety work, formulates and improves safety work systems, and implements xx hours of real-time monitoring, on duty day and night, making full use of security alarm facilities to achieve civil and technical defense.
(3) Strengthen protection and improve facilities and equipment
In the future, our bureau will, in accordance with the spirit of relevant documents of the autonomous region and x city, cooperate with public security, fire protection and other departments to increase the frequency of inspections and at least do Inspections will be carried out x times in the first quarter. For various hidden dangers that may cause accidents, all those that can be solved immediately are ordered to be solved immediately. For cultural relics warehouses, protective measures such as anti-theft, fire prevention, and lightning protection will be gradually implemented to ensure that safety work is in place. Summary of safety production work of construction units 2
1. Completion of main work
1. In order to strengthen the safety awareness of the main body of the enterprise, we signed safety production target management responsibilities with 4 construction companies book, break down the work safety to each enterprise, and implement target management for the enterprise.
2. Increase publicity, education and training on production safety. In the first half of the year, our committee organized companies to participate in various safety trainings for more than 50 people. At the same time, our committee actively guides enterprises to carry out safety education for all employees, pre-job safety training and third-level education for migrant workers, so as to strive to improve their safety behaviors.
3. Strict market access and strengthen the review of prerequisites for safe production. Enterprises that have not obtained a safety production license are not allowed to engage in construction activities, and those that do not have specific measures and conditions to ensure safe production must report to safety supervision. If it is not approved, no construction permit shall be issued and the project shall not start construction. From January to June, *** accepted 13 construction safety reports for construction projects, and the safety report review pass rate was 100.
4. The "Safety Production Month" activity was seriously carried out. During the Construction Safety Publicity and Consultation Day, more than 100 construction industry safety leaflets were distributed to citizens. During the period, electronic screens were used to intermittently play safety propaganda slogans, and companies were required to hang 20 safety propaganda banners at the construction site.
5. In the first half of the year, *** organized 3 major safety inspections and daily inspections, and 83 hidden dangers were detected. Enterprises were ordered to implement rectifications for all hidden dangers discovered. Our committee followed the regulations Re-examination and acceptance required.
6. This year, the County Futai Apartment Building 1# and 2# projects won the title of Provincial Safety and Quality Standardization Demonstration Site.
2. Work plan for the second half of the year
1. Continue to strengthen guidance for enterprises to create safety and quality standardized construction sites.
2. Strictly review the safety prerequisites before starting the project. Strict construction application procedures and increase penalties for construction safety production. Approvals shall be carried out in strict accordance with relevant laws, regulations and legal procedures. At the same time, follow-up supervision shall be carried out, and violations of operating procedures and failure to perform safety production obligations shall be resolutely punished in accordance with the law to ensure the effectiveness of management.
3. Strengthen the management of major hazard sources and construction lifting machinery. Strengthen supervision and management of major hazard sources. Strive to achieve a clear bottom line and clear targets for major hazard sources in all projects under construction. The registration management work will be further improved, and construction hoisting machinery that has not been inspected and accepted shall not be put into use. Summary of production safety work in construction units 3
This year, the construction safety work in our county is under the leadership of the county party committee, county government and superior industry authorities. In the spirit of important instructions for production, we have fully implemented the safety production responsibility system at all levels and the main responsibility of enterprises for safety production, established and improved the long-term mechanism for safety production, deepened special governance, and further strengthened administrative law enforcement and supervision. This year, there have been zero fatal accidents in our county, maintaining There have been no construction safety fatalities for seven consecutive years, and no safety accidents involving serious injuries or serious injuries have occurred. The construction safety situation is good.
1. Basic situation
(1) Basic situation of supervised projects
Our county has 47 safely registered supervised projects this year, with a construction area of ??293,948 square meters. The total project cost is 225.71 million yuan.
(2) Work situation
1. Improve the system and standardize safety supervision
The safety supervision department signs safety production management goals and commitment letters with the responsible entities, Clarify the safety responsibilities of each main unit, the project department pays the construction safety risk deposit system, conducts a review of safety production conditions before the start of construction, strengthens the supervision and management of safety professional acceptance and the phased safety production grade assessment, and projects that fail the phased safety acceptance shall not be moved forward. If a process operation fails to pass the safety inspection, the project quality inspection shall not be carried out. A production safety completion filing system is implemented. Before the project is completed and accepted, the construction project must be filed for production safety, and the principle of production while ensuring safety is adhered to.
2. Implement regulatory responsibilities and strengthen supervision
① Clarify regulatory responsibilities, strengthen daily supervision and inspections, adhere to the principle of who is responsible for supervision, and establish a hidden danger investigation system and a hidden danger investigation platform Accounts should be kept, and a management system for filing and eliminating cases should be implemented to eliminate potential safety hazards in a timely manner.
②. Strengthen the supervision of the construction market. For some projects that violate basic construction procedures, evade supervision, and do not go through the construction and supervision procedures, our bureau will adopt supervision, urging, and administrative penalties. , effectively maintaining the order of the construction market.
③. Strengthen the inspection of the management personnel and special operations personnel of the project department under construction on their certification, attendance and performance of duties, and order the construction units that do not meet the requirements to make rectifications within a time limit.
④. Strengthen the filing and use registration management of lifting machinery and equipment. All lifting machinery and equipment must be in accordance with relevant document requirements, have complete information and pass the test before they can be put into use. Those that do not meet the requirements will be immediately deactivated and cleared from the market.
3. Pay close attention to construction site supervision
This year, our bureau organized 4 quality and safety inspections, conducted 4 safety inspections, issued 11 relevant documents, and issued quality and safety inspections. There were 77 time-limited rectification notices for safety hazards, 20 partial suspension notices and 16 suspension notices for safety hazards, and more than 200 various quality and safety hazards were investigated and dealt with. In particular, with the launch of the "Safe Production Month Activities", our bureau took this as an opportunity, combined with special rectification work, and used on-site management as a breakthrough to pay close attention to on-site organizational leadership and system implementation, investigate signs of various accidents, and implement on-site protective measures. With deep foundation pits, high support formwork, scaffolding and construction hoisting machinery and equipment as the focus of prevention, special construction safety management work has been carried out in depth, focusing on prevention and monitoring, which has effectively promoted the safety management of construction enterprises.
2. Main existing problems
1. Some construction companies have insufficient on-site management personnel and on-site supervision personnel, safety management knowledge needs to be further improved, and the number of inspections of construction companies on projects is too high. few.
2. Insufficient investment in safety makes on-site protection difficult to meet standards. The developers in our county are small in scale, have insufficient funds, low project costs, insufficient safety investment, and backward detection methods, resulting in irregular protection installations, resulting in many safety hazards and difficulty in meeting safety standards.
3. The crackdown on illegal construction is insufficient. Some projects were started before being reported for construction. There were no safety measures, insufficient management personnel, difficulty in meeting construction site standards, complicated penalty procedures, and insufficient crackdowns, which disrupted the construction market.
3. The focus of the next step
In view of the outstanding problems existing in our county, the focus of the next step is:
1. Strengthen education and training and strengthen construction Study laws and regulations and carry out publicity and education activities in various forms. Effectively strengthen the safety education work for construction company leaders, project managers, safety officers and construction workers, ensure that they are trained first and then take up their posts, and special positions are held with certificates, and strive to improve safety production awareness and safety production skills.
2. In accordance with the spirit of Xiang Jianjian [20XX] No. 111 document, strengthen the cost management of safety protection and civilized construction measures for construction projects in our county.
3. Strengthen the main responsibilities of all parties, guide construction enterprises to strengthen standardization construction, further implement the responsibilities of each main body, strengthen the safety responsibilities of construction, design, supervision, construction, and supervision units, and strengthen the safety production Institutionalization and standardization construction, especially the implementation of the responsible entities of supervision units and construction units, must be strengthened.
4. Increase the intensity of law enforcement and penalties. Maintain the dignity of laws and regulations, improve the conscious enforcement of laws, regulations, rules and standards related to safety production by all responsible units, and form a good situation in which enterprises consciously abide by the law and supervisory agencies strictly enforce the law. Strengthen learning, improve the level and intensity of law enforcement, eliminate the problems of weak law enforcement and lax punishment, and establish the authority of construction safety law enforcement. Summary of safety production work of construction units 4
In order to further promote the in-depth investigation and management activities of hidden safety hazards in our town and effectively strengthen the safe and civilized construction management of construction projects, according to "Kai'an Banzi [20XX] No. 42 ) "Notice on Conducting a Major Investigation of Safety Hazards in Buildings in the County" and "(Long Ban Fa [20XX] No. 25) Notice on Conducting a Major Investigation of Safety Hazards in Buildings in the Town", combined with the current construction construction in our town Regarding the situation faced by production safety, from March 10 to April 11, 20XX, our town’s Village Management Office, Safety Supervision Station, and Land and Resources Office established a special inspection team to go to the construction sites of projects under construction in the jurisdiction to conduct safety production work on construction sites. A sweeping inspection was conducted.
1. Inspection situation
This inspection focuses on the outer frame, formwork, temporary electricity for construction, lifting frame, well frame, tower crane, foundation pit support, and special operations personnel The status of employment with certificates, implementation of the safety responsibility system, safety education, safety technical briefings, rectification of hidden dangers, etc. were inspected. Judging from the inspection situation, the comprehensive evaluation of most projects under construction is "poor". Although most private construction sites have conducted self-examination and self-correction work on the construction sites before major inspections, some safety hazards and civilized construction issues have been rectified in a timely manner. However, during the inspection, it was still found that most construction units did not pay attention to safe production and civilized construction. The rectification of hidden safety hazards and civilized construction problems found at the construction site is not in place.
This inspection conducted a random inspection of more than 70 houses under construction, with a construction area of ??9,000 square meters. During the inspection, *** issued more than 70 construction safety commitment letters and 11 work suspension and rectification notices.
2. Main problems existing during the inspection
(1) Management issues
1. Some projects did not apply for construction permits and were constructed illegally without authorization.
2. The construction unit does not properly manage the project and relaxes the management of safe production and civilized construction;
3. There is insufficient provision of full-time safety personnel. The phenomenon of insufficient safety officers still exists.
(2) Safety production
1. The construction company failed to inspect and accept the scaffolding, construction electricity, load-bearing formwork, etc. at the construction site;
2. The erection of scaffolding in some houses is not standardized, and the phenomenon of random erection without compliance is serious. The effective parts of the overlap and the length of the rescue pull do not meet the requirements of the specification. Tie bars, sweeping poles, scissor braces, and scaffolding pieces The quantity laid is seriously insufficient, and containment facilities such as dense-mesh netting are not standardized. There is still a large gap between the outdoor scaffolding and the building, and the lack of isolation and protection still exists.
3. The construction unit does not pay enough attention to the management of tower cranes at the construction site. The phenomenon of tower cranes being put into use without inspection or without obtaining a certificate after inspection is quite prominent.
Judging from this safety inspection, the situation of safety production in construction in the town is still very serious, and the basic work of safety production is still relatively weak. There are many hidden safety accidents at the construction site, and the safety production management work There are still weak links and outstanding problems in the project. In response to the existing problems, the inspection team requires all participating units to attach great importance to early deployment, early arrangement, and early implementation. The person in charge of the construction unit must organize carefully, deploy carefully, plug loopholes, Check blind spots and take various preventive measures to ensure that the construction site environment meets the standards and eliminate safety hazards. If rectifications can be made immediately, the construction unit shall be ordered to make rectifications immediately. If rectifications cannot be made immediately, the construction unit shall be required to make rectifications within a time limit. If there are serious safety hazards, the construction unit shall be ordered to make rectifications immediately. The construction site was ordered to stop construction. The inspection team also required all villages and residents to strengthen the awareness of production safety management, strengthen the responsibility system for production safety, and effectively strengthen management to ensure the steady development of project quality, production safety, and civilized construction in our town. Summary of safety production work of construction units 5
According to the document requirements of the "Self-inspection Notice of the Safety Committee Office of the Ministry of Transport on Rapidly Carrying out Safety Production" issued by the Safety Committee Office of the Ministry of Transport, in order to continue to strengthen our project Regarding the safety management status of the department, the Safety and Quality Department of our project department recently conducted a comprehensive inspection of the safety production situation across the entire line under the leadership of Manager Li Xibing, the safety director of the project department. The safety inspection situation is summarized as follows:
1. Work Objectives
Through comprehensive and in-depth inspections, we have discovered the weak links in the safety production process of our project department, and carried out inspections on links that are prone to recurring during the construction process and are not taken seriously by on-site workers. Strong rectification will be carried out to strengthen the safety awareness of all project department personnel to ensure safe and smooth progress of construction.
2. Key points of inspection
Based on the actual situation and construction stage of my project, the key points of inspection by our project department are: the use of labor protection equipment, and the safety management of erecting and transporting beams. conditions, protection of high-altitude operations and edge operations, on-site temporary power use, operating conditions of special equipment such as bridge erecting machines and gantry cranes, and safety in-house conditions. In view of the above inspection points, our project department conducted detailed inspections of key construction parts such as Huilong Tunnel, Yaojiawan Bridge, Baoxia Service Area, No. 1 and No. 2 Beam Fields, Xiangyu Railway Overpass Bridge, Damiao Bridge and so on.
3. Problems during the inspection
1. Huilong Tunnel
The lighting in the tunnel is insufficient, and some road workers in the tunnel are wearing reflective clothing as required. Serve homework.
2. No. 1 Beam Yard
The four gantry crane hooks in the No. 1 Beam Yard Prefabrication Yard of the Project Department lack anti-fallout safety devices, and the oxygen and acetylene bottles are not classified and placed separately. There are many gantry cranes on site. The door of the distribution box was not closed in time, the waste items on site were not cleared in time, and the civilized construction conditions were poor.
3. K34 684~k34 824 pile-board walls
At the pile-board wall pile foundation construction site, some workers did not wear safety helmets, and the workers at the openings did not wear safety helmets as required. seat belt. The pile holes No. 14 to 16 on site are at the foot of the slope. There is a risk of landslide on the upper slope on the right side of the line at any time, which poses a huge safety hazard.
4. Protective scaffolding for the Xiangyu Railway Line Bridge across the highway
The construction workers who set up the protective scaffolding did not wear safety helmets, and the construction workers at high places did not wear safety belts.
5. Zhangjiayuan Bridge
The on-site bridge erecting machine lacked rear outriggers; the bridge erecting machine was not fixed when it stopped working.
4. Hidden Hazard Control Measures
In response to the above existing problems, the project department issued a Hidden Hazard Rectification Notice and the rectification was completed within three days. The project department will guide and supervise each work area and construction team to make rectifications according to the problems existing in the inspection and eliminate hidden dangers in a timely manner.
1. The person in charge of the on-site construction of Huilong Tunnel is required to strengthen the management of construction personnel and increase the lighting fixtures in the tunnel so that the lighting in the tunnel can meet the construction requirements.
2. The gantry crane hook anti-fallout safety device at the No. 1 beam yard of the project department is installed in place, oxygen and acetylene are placed in categories, and a safe distance is ensured. Some seriously damaged distribution boxes were replaced and the upper covers of all distribution boxes were ensured to be locked.
3. No. 14~~16 pile foundations at the pile board wall construction site used reinforced concrete to heighten the retaining wall, fill the gap between the inner retaining wall and the slope with earth and stone, and set up scaffolding on one side of the retaining wall. The construction platform is used to fix the winch and provide construction personnel with access to work.
4. All construction workers at the protective scaffolding construction site have worn safety protective equipment as required, and the erected parts have been protected with reflective tapes and reflective cones.
5. The Zhangjiayuan Bridge erecting machine has added front legs, which are fixed with wire ropes when out of use.
5. Next work plan and measures
Through this inspection, the overall operation of the special equipment on site is relatively good, the temporary power consumption situation has been well improved, and the on-site construction personnel The awareness of the use of protective equipment has been greatly enhanced. Based on the actual situation, the following directions will be the focus of work in the future:
1. Raise awareness and strengthen safety education and training for special equipment operators and equipment managers. Attach ideological importance to the use and management of special equipment and effectively strengthen the management of special equipment. Strengthen the inspection, repair and maintenance of special equipment.
2. Management of temporary power lines, distribution boxes, etc.
3. Strengthen on-site construction safety education and improve the quality of construction personnel.
4. Penalize construction teams that repeatedly have the same problems for breach of contract and improve the safety awareness of construction team managers.
5. The project department regards self-examination and self-correction as a daily task, seizes the loopholes in safety production, and elevates safety production to a new level.
- Previous article:Propaganda slogan of new city image
- Next article:Matters needing attention in heavy snow season
- Related articles
- Complete collection of tug-of-war slogans (classic)
- How to write a slogan?
- Wonderful advertising slogans for baby swimming pools
- Promotion slogan of the cultural campus
- English logo of continental tires
- Small slogan of garbage sorting guards
- When is World Blood Donation Day?
- I am an environmental protection warrior
- Slogans on Garbage Classification in Wenzhou Schools
- Creative girls' dormitory group name sand sculpture summary of 30 sentences