What measures can be taken to catch up with the construction period?

Increase economic input and mobilize the enthusiasm of workers.

1. economic measures: economic measures refer to financial guarantee measures to achieve the schedule. Increasing the input of resources is the most commonly used method, such as increasing the input of labor, materials, turnover materials and equipment.

2. Technical measures mainly refer to technical methods to speed up the construction progress. Improve tools and appliances to improve labor efficiency. Improve labor productivity, mainly through auxiliary measures and reasonable workflow.

3. Modifying the implementation plan, such as changing cast-in-place concrete into off-site prefabrication and on-site installation, can improve the construction speed. For example, in an international project, the original construction scheme was cast-in-place concrete, which took a long time. Further investigation shows that the country lacks technical personnel, and the quality and trainability of labor force are poor, which can not guarantee the original construction period. Later, the prefabricated construction scheme was adopted, which greatly shortened the construction period. Of course, on the one hand, there must be available resources, on the other hand, it may cause cost overruns.