Joke Collection Website - Bulletin headlines - Responsibility book for house demolition safety

Responsibility book for house demolition safety

Responsibility Letter for House Demolition Safety (3 selected articles)

With the continuous progress of society, in many cases, we will come into contact with the responsibility book, and signing the responsibility book will help to implement the responsibility. So how is the relevant responsibility book formulated? The following is the responsibility book of house demolition safety that I collected (3 selected articles). You are welcome to study for reference. I hope it helps you.

1 Responsibility Letter for House Demolition Safety In order to strengthen the supervision and management of house demolition safety and protect people's lives and property. Prevent and control the occurrence of safety accidents in house demolition, and implement the laws, regulations, guidelines and policies of the state on safety in production. In the planning area of housing demolition within the scope of housing demolition households must pay attention to the following matters:

1. In principle, the expropriated building materials are owned by Party A (due to evaluation and compensation). If Party B actively cooperates with the collection work, actively removes construction waste and ensures safety, building materials will be awarded to Party B. ..

Second, the demolition should be carried out in a symmetrical order from top to bottom, and several layers should not be demolished at the same time. When one part is demolished, reinforcement or stabilization measures should be taken to prevent the other part from collapsing.

Three, due to special circumstances, the demolition method must be adopted, should comply with the requirements of the "technical regulations for safety of construction and installation engineering", and must meet the following conditions:

(a) The depth of cutting the wall root shall not exceed one third of the wall thickness, and excavation shall not be carried out when the wall thickness is less than two and a half bricks;

(2) When excavating, effective measures must be taken to support the wall;

(3) Before being pushed down, a message should be sent out, and it can only be carried out after nearby personnel have escaped to a safe area.

Four, the need to dismantle the wires, cables, gas pipelines, sewers, heating pipelines and other facilities within the scope of the project, should be reported to the relevant units, and in accordance with the relevant operating procedures.

Five, the demolition project construction site, should set up signs and full-time guardians, and set up fences around, should hang a red light at night; When demolition is carried out at a high place, a chute should be set first. Large or heavy materials should be lifted by lifting ropes or cranes, and it is forbidden to throw them down.

Six, to landfill their own water cellar, to ensure the safety of people and animals.

Seven, house demolition should comply with the requirements of environmental protection, demolition of garbage must be neatly stacked, construction waste removal in accordance with the provisions, shall not be burned in the construction site.

Eight, undertake the demolition project construction unit, should be engaged in the demolition work personnel for personal accident insurance, in strict accordance with the safety production and construction procedures, to ensure the safety of personnel.

9. If Party B decides to dismantle it by itself, it must be carried out in accordance with the above requirements, and Party B shall be responsible for the safety accidents caused by self-dismantling. ..

X this responsibility letter is made in duplicate, one for each party.

Party A (seal):

Party B (signature):

20___ _ _ _ _ _ _ _

Responsibility Letter for House Demolition Safety 2 Party A:

Party B:

In order to strengthen the construction safety management of the demolition project of the old people's hospital, enhance the safety awareness of the construction personnel and ensure the safety of house demolition without accidents, Party A and Party B hereby sign the following safety construction responsibility letter:

A, safety management objectives

Party B shall complete the house demolition project of the old people's hospital in the county on time, with good quality and quantity, and ensure that there are no casualties, serious injuries and deaths during the house demolition.

Second, Party A's safety management responsibilities

1. Earnestly implement national and local laws and regulations on safety management, urge Party B to submit the organization plan and measures for house demolition safety construction to the safety supervision station of the County Housing and Construction Bureau for review and filing before demolition construction, and go through safety guarantee procedures such as personal accident insurance for construction workers and surrounding pedestrians according to the requirements of the safety supervision station.

2. Entrust the safety management personnel of the supervision unit to supervise the whole process of house demolition, put forward rectification opinions in time when finding hidden dangers, and urge the rectification to ensure the safety of house demolition without accidents.

3. Party A has the right to go to the site to check the diary accounts of safety management personnel from time to time, and urge Party B to implement the rectification opinions put forward by the safety officer.

4. Before the house demolition construction, Party A shall notify the relevant departments such as power supply, water supply and telecommunications to do a good job in the relocation of all lines, so as to ensure the safe and smooth progress of Party B's house demolition construction. ..

Three. Safety management responsibilities of Party B:

1, the safety management personnel of the house demolition construction unit must hold relevant certificates, and the construction personnel must receive safety technical training before taking up their posts. In the process of construction, the construction must be organized in strict accordance with the formulated and approved implementation plan of safe construction technology for house demolition.

2. In addition to providing personal accident insurance for all construction workers who demolish the house, Party B also needs to provide personal accident insurance for pedestrians around, and submit the insurance policy to Party A and the safety supervision station for filing before the house is demolished.

3. Party B shall pay Party A a performance bond of 200,000 yuan for construction safety as promised. Give it to Party A within three working days after the house demolition contract is signed, and return it according to the performance of the house after the house demolition and residue cleaning are completed and accepted (without interest), and return it in full without any safety accident (without interest).

4. At the scene of house demolition, the full-time safety management personnel provided by Party B must communicate with the safety management personnel of the supervision unit entrusted by Party A, and timely rectify the rectification opinions put forward by the safety management personnel.

5. All managers and construction workers who are allowed to enter the demolition site must wear safety helmets, and construction workers are forbidden to wear slippers and work after drinking.

5, the construction site should be equipped with warning signs, streets downtown public * * * channel, should set up safety protection facilities, the ground should be set up railings and other isolation devices, in the stairs, floor edge, opening, balcony edge operations, must set up isolation railings and scaffolding and other protective measures.

6, house demolition contractor must be civilized construction, house demolition site to hang relevant warning signs and warning signs; Measures should be taken to control and evacuate pedestrians and vehicles in the corridor; Effective measures should be taken to control dust and noise so as not to affect the daily life of residents as much as possible.

7. After signing the house demolition contract, Party B shall bear all medical expenses and compensation expenses for all casualties during the house demolition construction, and Party A shall deduct 50% to 100% of the performance bond for safe construction from Party B according to the severity of the accident.

8. This responsibility book is in quintuplicate, one for Party A's file, one for Party A's financial file, one for Party B's file, one for the county housing and construction bureau's safety supervision station, and one for the entrusted supervision unit. This responsibility shall come into effect as of the date of signing.

Party A (seal): Party B (seal):

Legal representative: legal representative

Supervisor: Manager: Supervisor:

Handler:

Conclusion date:

Responsibility Letter for House Demolition Safety 3 In order to strengthen the safe construction management of house demolition, conscientiously implement the working policy of "safety first, prevention first", put an end to safety accidents and ensure the safety of people's lives and property, Party A entrusts Party B to build 28 two-story houses (specific location) in accordance with the People's Republic of China (PRC) Law on Work Safety and the Regulations on the Administration of Work Safety in Construction Projects and other relevant laws and policies.

1. Conscientiously implement the laws and policies related to production safety, such as the Law of People's Republic of China (PRC) on Production Safety and the Regulations on the Administration of Production Safety in Construction Projects.

2. Improve the system of safe production, establish the responsibility system with the legal representative as the first responsible person, improve emergency rescue measures, ensure safe construction, and ensure that "the organization is guaranteed, the tasks are required, the work is inspected, and preventive measures are taken".

3, clear house demolition safety production responsibilities, and the project leader signed a letter of responsibility for safe and civilized construction. Set up enclosure facilities and warning signs around the construction site. Fire-fighting facilities should be kept in good standby state, and temporary facilities, mechanical equipment and building materials should be arranged according to the general construction plan, so as to ensure the smoothness and cleanliness of entrances and exits and the site.

4. Before demolishing houses or structures, cut off the power supply and turn off the natural gas. When demolishing buildings, protective frames and protective nets should be set up. Construction personnel should wear safety helmets and hang safety ropes according to regulations, effectively control dust, noise and vibration during construction, and transport building materials and dispose of construction muck and various wastes according to relevant regulations.

5. Party B shall not commit the following acts during the house demolition construction: throwing wastes at high altitude; Backfilling toxic and harmful wastes as earthwork; Mud water is directly discharged into urban drainage facilities or rivers without treatment; Melting asphalt or burning linoleum, paint and other substances that produce toxic and harmful smoke and gas at the construction site without qualified devices; Working, living or not doing business in the building to be demolished; Other acts that should be prohibited.

6. Actively cooperate with the supervision, inspection and guidance of relevant departments. For the existing problems, it is necessary to formulate rectification plans such as rectification measures, financial guarantee and completion date, take effective measures in time to eliminate potential safety hazards, submit written materials for safety inspection and rectification within the specified time, and submit rectification information to Party A. ..

7. Strengthen construction site management and improve various safety protection facilities. In the event of a safety accident, immediately organize forces to rescue, put an end to casualties to the maximum extent, and report the accident in time, and do not delay or conceal the accident. After the safety accident, it is necessary to protect the site, actively cooperate with relevant departments to do a good job in investigation and evidence collection, and do a good job in the aftermath according to responsibilities and relevant regulations to eliminate potential safety hazards.

;