Joke Collection Website - Bulletin headlines - Brief analysis of occupational health and safety operation procedures for maintenance fitter posts?
Brief analysis of occupational health and safety operation procedures for maintenance fitter posts?
2. Before taking up the post, you must wear labor protection articles with complete configuration correctly. It is forbidden to take up the post after drinking or drinking.
3, when using instruments, must be in accordance with the locksmith commonly used instruments safety operation procedures; When using power tools, insulating gloves should be worn, and female workers' braids should be tied into the working cap. Check whether the power supply is disconnected. If the machine and the power cord are not cut off, maintenance is prohibited, and a warning sign prohibiting closing must be hung at the power switch. When the pipeline is overhauled, it must be confirmed that the valve for overhauling the pipeline is in the closed state, and at the same time, a warning sign "No valve opening, pipeline overhaul" is hung at the valve.
4, labor instruments must be in good condition, it is forbidden to use unsafe tools with cracks, burrs and loose handles, and strictly abide by the safety operation procedures of commonly used tools;
5. Pay attention to the safety of people around you and yourself at work to prevent tools from falling off and workpieces and iron filings from splashing and hurting people. When two or more people work together, they should pay attention to coordination.
6. When working high above the ground, check whether the ladder scaffold is firm and reliable before work. Tools must be put in the tool bag, and the safety belt must be fastened. No hard shoes, no slapstick, no throwing things.
7. When climbing with a ladder, there should be anti-skid measures. The angle of the ladder should be 60 degrees, and the central part must be supervised by designated personnel. The herringbone ladder should be pulled with a strong rope.
8, hanging objects, there must be a specialist command in advance to choose to check the wire rope, shall not walk under the crane, stay, shall not use hemp rope, wire.
9, scraper, file should have a handle, flat shovel to remove burrs, flat shovel length less than 150mm should not be used. There should be barbed wire between the vice stations working opposite to prevent objects from flying out and hurting people.
10, if heating is needed during maintenance, be sure to stay away from oily and flammable materials to prevent fire.
1 1. Tools must be used to remove iron filings. It is forbidden to pull by hand and blow by mouth.
12. After finishing work or leaving the workplace for some reason, you must disconnect the power supply, gas supply, water supply and oil supply of the equipment, clean up the work site, and put the tools and parts in the designated locations.
13. Waste oil should be poured into the designated container and recycled regularly. It is not allowed to pour into the sewer.
14, the workplace should be kept clean, and there should be no oil and sewage on the ground to prevent people from slipping.
15, when debugging the equipment, the operating procedures of the equipment must be strictly observed. Before the safety protection device on the equipment is installed, it is not allowed to be commissioned and handed over to production; When cleaning parts, smoking is prohibited, and open flame operation is prohibited near the cleaning place; It is not allowed to use gasoline to clean parts and scrub equipment or clean the ground.
16. When operating in relevant workshops, the operators must make safety disclosure to the relevant person in charge of the workshop, and must conscientiously implement the Safety Management Agreement for Cross Operation, Safety Production Confirmation Management System and other relevant safety production management systems, and make safety confirmation and sign before operation.
17, strictly implement other safety regulations, standards and requirements related to the operation of this position.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Previous article:Which province is Zhangye? Which province is Zhangye?
- Next article:English version of New Year greetings
- Related articles
- Welcome speech by the primary school principal
- Tax public welfare slogan
- How to decorate the walls of a small office Key points for decorating the walls of a small office
- The rise of Hunan merchants and the evolution of Hunan culture (2):
- List 20 idiom stories in the Spring and Autumn Period and the Warring States Period.
- How many districts are there in Zhuzhou?
- Five summaries of student reading activities
- Firefighting theme activity plan
- Slogan of nonferrous metal recycling enterprises
- Fireworks prohibited range in Hailing District