Joke Collection Website - Bulletin headlines - Project development plan of bookstore information management system
Project development plan of bookstore information management system
1 Introduction
The use of 1. 1
Description: The purpose of compiling this software project development plan is to point out the expected readers.
1.2 background
Description:
A. the name of the software system to be developed;
B. The task proposer, developer and user of the project, and the computing center or computer network for implementing the software;
C. Basic interaction between software systems and other systems or institutions.
1.3 definition
List the definitions of technical terms used in this document and the original phrases of foreign initial words.
1.4 reference
List useful reference materials, such as:
A. The approved plan and contract of this project and the approval from the superior department;
B. Other published documents belonging to this project;
C documents and materials cited in this document, including the software development standards to be used. List the titles, document numbers, publication dates and publishing units of these documents, and explain the sources where these documents can be obtained.
2 Project overview
2. 1 Work content
Briefly explain the main work to be done in the development of this project.
2.2 Main participants
Briefly describe the main personnel involved in the development of this project, including their technical level.
2.3 products
2.3. 1 program
List the name of the program to be handed over to the user, the programming language used and the media form of the stored program, and cite relevant documents to explain its functions and capabilities one by one.
document
List the name and content point of each file to be handed over to the user.
service
List the services provided to users, such as training, installation, maintenance and operation support. , and specify the start date, support level and service period item by item.
2.3.4 Non-transferred products
Explain that the development group should give products (documents and even some programs) to the unit rather than to the users.
2.4 acceptance criteria
For the above-mentioned products and services to be delivered, explain item by item or quote information to explain the acceptance criteria.
2.5 deadline for completing the project
2.6 Approver and approval date of this plan
3 implementation plan
3. 1 Work task decomposition and personnel division
For various tasks that need to be completed in project development, from requirements analysis, design, implementation, testing to maintenance, including document preparation, approval, printing and distribution, user training, software installation, etc. , according to the hierarchical decomposition, specify the person in charge and participants of each task.
3.2 Interface personnel
Explain the personnel responsible for interface work and their responsibilities, including:
A. personnel responsible for the interface between the project and users;
B. Responsible for the interface between this project and various management organizations of this unit, such as contract planning management department, finance department and quality management department;
C interface personnel of the unit responsible for the same contract of this project, etc.
3.3 progress
For requirements analysis, design, coding implementation, testing, handover, training and installation, the scheduled start date, completion date and required resources of each task are given, and the completion order of each task and the landmark events (so-called "milestones") representing the completion of each task are specified.
3.4 Budget
List the required labor (including the number and time of personnel), budget and sources of funds (including office expenses, travel expenses, machine time expenses, information expenses, communication equipment and special equipment rent, etc.). ) item by item.
3.5 Key issues
List the key problems, technical difficulties and risks that can affect the success or failure of the whole project one by one, and point out the impact of these problems on the project.
4 support conditions
Explain the various conditions and facilities needed to support the development of this project.
4. 1 computer system support
List the computer system support needed in the development and operation process, including computers, peripherals, communication equipment, simulators, compiled (or assembled) programs, operating systems, data management packages, data storage capabilities and test support capabilities. , and give the requirements of delivery date and use time item by item.
4.2 Work undertaken by users
List the tasks and deadlines that users need to undertake one by one. Include the conditions provided by the user and the providing time.
4.3 Conditions provided by other units
List the work to be undertaken by the contractor of the other unit and the completion time item by item, including the conditions and time to be provided by the other unit.
Five main points of special planning
Explain the main points of various special plans (such as subcontracting plan, developer training plan, test plan, security plan, quality assurance plan, configuration management plan, user training plan, system installation plan, etc.). What needs to be done in the development of this project.
- Related articles
- Common sayings and maxims of respecting teachers (26 selected sentences)
- Slogan of Beijing normal university returning to school
- Flood control and disaster relief message
- How to set the computer desktop to countdown? I want it now
- What are the medical consumables?
- Primary school Chinese lecture notes
- Urgent! Ask for an explanation at the entrance of the sports meeting
- What are some sentences to say farewell to the death of an elder?
- A complete collection of bathroom prompts and slogans
- Autumn harvest famous saying