Joke Collection Website - Bulletin headlines - Why not stop the abnormal operation of pollution control facilities in some enterprises?
Why not stop the abnormal operation of pollution control facilities in some enterprises?
According to the Ministry of Environmental Protection, on June 6, 65438, 28 inspection teams inspected 678 enterprises (units) and found that 27 of them had gas-related environmental problems. Among the enterprises (units) with problems, there are 5 cases of abnormal operation of pollution control facilities, dust management in construction sites and non-industrial pollution problems, 3 cases of gas-related environmental problems such as industrial enterprises not installing pollution control facilities, 2 cases of off-peak production of industrial enterprises and failure to implement unorganized emission control requirements of industrial enterprises, and comprehensive management of gas-related "scattered pollution" enterprises and emergency treatment of heavy polluted weather 1 start.
The Ministry of Environmental Protection pointed out that there are seven typical situations as follows: First, there are still enterprises whose pollution control facilities are not operating normally and waste gas is discharged directly. The cyclone dust collector of the smelting furnace of Heze Chuangshengchen New Materials Co., Ltd. in Mudan District, Heze City, Shandong Province was not used, the bag of the bag dust collector fell off, the wet dust collector was not added with sodium hydroxide, and the pH value of alkali liquor was 7 (neutral), which could not achieve the dust removal effect. The company's smelting furnace should be equipped with denitration treatment facilities, and the inspection team did not find that the company had denitration facilities at the scene; The company's batching room and production workshop are not sealed, and the dust removal system is not installed at the batching inlet, resulting in serious unorganized dust emission. Shandong Chengwu Yixin Environmental Protection Technology Co., Ltd., Chengwu, Heze City, Shandong Province, set a baffle before the boiler incineration, and the organic waste gas (VOCs) in the workshop was directly discharged through the pipeline in front of the baffle; The tail gas of esterification distillation workshop is discharged directly without collection and treatment, and the smell of the workshop is pungent.
Second, there are still some industrial enterprises that have not installed pollution control facilities, and there are illegal sewage discharges. Rong Feng Cable Accessories Co., Ltd., Renqiu City, Cangzhou City, Hebei Province, has no environmental protection procedures in the new painting process, no pollution control facilities are installed, and there is open-air painting. There is no dust collection and treatment facility in the wood cutting process, and the flue gas is directly discharged. No waste gas treatment facilities were installed in Tianfa Sealing Material Factory 14 plastic heat insulation strip production line in Renqiu City, Cangzhou City, Hebei Province. No pollution control facilities were installed in the painting room of Lankao Hualan Furniture Co., Ltd. in lankao county, Henan Province, and it was directly discharged by an exhaust fan; The waste gas generated by glue spraying and primer spraying processes is discharged directly without treatment.
Third, there are still industrial enterprises that have not strictly implemented the peak-shifting production and transportation requirements of industrial enterprises and are still illegally producing. Hebei Xingtai Julu Feida Rubber Co., Ltd. and Julu Ningfeng Rubber Products Factory should limit production by 50% according to the peak shifting production requirements of local industrial enterprises. During the on-site inspection, the inspection team found that the sealing strips of two vulcanizers sealed by Julu Feida Rubber Co., Ltd. were torn and the equipment had obvious residual temperature; The seals of 1 mill and 1 vulcanizer sealed by Ningfeng Rubber Products Factory in Julu County were torn. During the on-site inspection, the inspection team found that the power supply of the equipment was connected and the vulcanizer had obvious residual temperature.
Fourth, some industrial enterprises have abnormal operation of dust control facilities or imperfect dust control measures, resulting in serious unorganized dust emission. The inspection team found that the spraying facilities of Beijing Fengtai District Beijing High Strength Concrete Co., Ltd. were damaged and could not be used normally. The raw material conveying corridor is not closed for collection, the materials are piled up in the open air without covering, and the dust is unorganized.
Fifth, there are still "scattered and polluted" enterprises illegally producing outside the list. An unnamed wood processing factory at the intersection of Zhuang Qing Road and National Highway 220, Cao Xian County, Heze City, Shandong Province, has no environmental protection procedures and is not included in the comprehensive remediation list of local "scattered pollution" enterprises. During the on-site inspection, the inspection team temporarily stopped production and all the machinery and equipment were powered on. There are about 65,438+0,000 square meters of open-air painting operations, and there are a large number of semi-finished painting products on site.
Sixth, there are still enterprises that have not implemented the emergency response requirements for heavily polluted weather and illegally produced. Bao Li Aluminum Sales Department of Renqiu City, Cangzhou City, Hebei Province should stop production under the orange warning. In the surface treatment workshop of this unit, the power supply of the equipment in the production and spraying workshop is connected, and the spraying production line is full of workpieces, and the conveyor has obvious signs of production.
Seventh, there are still some imperfect dust control measures in some construction sites, and unorganized dust is serious. The inspection team found that five construction sites, including the municipal engineering site of Yangqu Town, jiancaoping district, Taiyuan City, Shanxi Province, the site of Huamei Thermal Insulation Material Co., Ltd. in Boxing County, Binzhou City, Shandong Province, and the third phase site of Dongfang Xingcheng, Zhangdian District, Zibo City, Shandong Province, had imperfect or inadequate dust-proof measures such as surrounding enclosure, material stacking and covering, wet earthwork excavation, road hardening, vehicle cleaning and closed transportation of muck vehicles.
Not strict enough.
- Previous article:What does it mean to make an example?
- Next article:Where are pebbles in Southwest University?
- Related articles
- What are the precautions for using radiators for home heating?
- What is the content of the kindergarten traffic safety handwritten newspaper?
Children's awareness of traffic safety is not strong, so making traffic safety handwritten newspaper is helpful for
- How does the secretary of coal mine branch correct his thinking and establish the concept of overall situation?
- What kind of fruit can lose weight?
- Advertising slogan about drinking, not driving, not drinking [required]
- High temperature after printer paper jam
- How big a pipe should be used for AS pre-embedding in civil air defense in the electrician¡¯s basement?
- Related report on social practice of gas station
- Huizhou 2019 Work Injury Insurance Class I and II
- A brief history of gold diamond