Joke Collection Website - Bulletin headlines - Quality and safety year-end work summary
Quality and safety year-end work summary
5 quality and safety year-end work summaries
Time flies, and a period of work has ended. Looking back on the work during this period, there must be many hardships and hardships. It is time Do a good job and summarize the work seriously. Below is the year-end work summary of quality and safety that I compiled for you. I hope you like it!
Quality and safety year-end work summary 1
20__ is a year of harvest, a year of rapid development of the company, and also a year of continuous improvement in the safety and quality management work of our Yuanhong company. In the year of improvement, under the correct leadership of Mr. Xu, all departments of Yuanhong Company have closely united and made unremitting efforts, and various safety and quality work have made great progress, laying a solid foundation for the annual safety and quality management work in 20__ . The safety and quality management work in 20__ is summarized as follows:
1. In terms of safety management
Safety is the most important and basic need of human beings, and it is a must for development companies and construction enterprises. Keeping the promise is also the driving force for realizing the benefits of development enterprises.
1. Leaders pay attention to and strengthen the implementation of the safety production responsibility system.
Since the beginning of the year, Mr. Xu has led members of the company’s leadership team to continuously study and explore new ways of safety management, firmly establish the management concept of “safety ensures stability, safety produces benefits, safety promotes development”, and establishes long-term safety The management mechanism makes it clear that the main person in charge of the unit is the first person responsible for the unit's safety work and has overall responsibility for the unit's safety work. Adhere to the work policy of "prevention first", improve the organizational management network, clarify the safety responsibilities of each functional department based on the actual situation of the unit, and incorporate safety work into the overall plan of the unit's civilized construction. Sign safety production and operation commitments and comprehensive management responsibility letters with functional departments and construction teams respectively to clarify safety work requirements. Ensure that safety management and enterprise production and operation have the same plans, arrangements, inspections, assessments, and rewards and punishments. The company holds regular safety work meetings, which are chaired by the person in charge of the unit. They carefully listen to the safety work reports of various functional departments, analyze existing problems, and study solutions.
2. Use various forms to strengthen safety education and enhance employee safety awareness
Increase safety knowledge training for front-line workers, and go deep into the construction site to learn about training objects, content, form, Effectively improve the pertinence of training content, the level of training objects and the diversity of training forms, and combine employee safety knowledge, technical level, business ability with personal performance assessment and incentive mechanism.
3. Carry out safety inspections in depth and detail, focusing on prevention
Safety inspections are an important means of improving production safety, and their basic tasks are: discover and identify various supervise the implementation of various safety rules and regulations; and stop illegal command and illegal operations. We adhere to three aspects: strengthening daily safety inspections, carrying out special safety inspections, and continuously organizing safety self-inspections of the project department to ensure that safety precautions are in place.
4. Carry out various safety activities and promote safe production management
Strengthen safety management, strictly enforce the assessment system, formulate assessment implementation details, establish the status of safe production, and clarify various aspects of safety work Indicators, organize construction units to carry out activities such as 100-day safety production, safety production month and safety hazard inspection, implement safety technical measures, increase safety prevention awareness, clarify the responsibilities of personnel at all levels, establish and improve the supervision and control mechanism, and implement all aspects of safety management Work continues throughout the entire construction process. At each regular project meeting, safety production is regarded as an important content, and special arrangements are made based on relevant national safety production regulations, systems and safety production accident notifications, etc., and all employees are educated to attach great importance to safety production ideologically and establish a strong sense of self-esteem. A sense of protection and protection of others.
5. Implement safety standardization work and improve safety management levels
Various effective rules and regulations have been formulated. Safety warning slogans and signs can be seen everywhere at production, storage and operation sites. The safety management of the company has been greatly improved and perfected, and the on-site safety, fire protection and protective equipment have been further improved. Employees have transformed standards into habits, can regulate their behavior according to standardized requirements, and implement them consistently and resolutely, reducing the number of employees. Illegal operations and unsafe behaviors, employees' awareness of safety standardization has been further enhanced, and employees' comprehensive safety quality has been improved. The emergency plan and civilized construction rules have been refined and implemented item by item to achieve standardization of safety management.
6. Strengthen safety performance assessment and standardize daily production behaviors
Link safety work and performance, and impose a certain amount of punishment on departments with more problems to make employees realize that due to One's own violations can cause losses to the entire department, strengthen the awareness of self-supervision and mutual supervision, and improve employees' attention to safety and awareness of compliance with rules and regulations, bringing the safety management of Yuanhong Project Company to a new level.
2. Quality management
1. Raise awareness and firmly establish the quality-oriented idea.
In accordance with the relevant requirements and regulations of the "Construction Project Quality Management Regulations", we must adopt a highly responsible attitude towards employees, establish the awareness that quality responsibility is more important than Mount Tai, and regard quality work as the company's top priority. Quality is above all else, and we pay close attention to the implementation of various quality work, thereby eliminating the occurrence of general and above quality accidents and ensuring the smooth progress of project quality work.
2. Strengthen leadership and ensure quality production from an organizational perspective.
Yuanhong Project Company has established a comprehensive quality work leading group, which is responsible for the organization and command of construction quality and rectification plans for major quality issues, and conducts regular and irregular quality inspections and evaluations. Based on the construction situation, the project department established a quality management leading group and formulated a quality management system. In order to effectively strengthen quality management and supervision, at the same time, we should combine raising the quality awareness of all employees with education so that everyone can establish a "quality-oriented" mentality.
3. Focus on fulfilling responsibilities and continuously improve construction quality.
In the process of implementing work responsibilities, we strengthen responsibility management and specify each person in each project department to clarify their respective responsibilities and tasks, so that everyone feels responsible for the work they do and finds ways to do it. Good job. In management, construction is strictly carried out in accordance with design standards, and process control and acceptance procedures are strictly enforced. Quality meetings are held regularly, a quality assurance system is established, and relevant personnel are organized to observe and study in adjacent bidding sections, so that everyone can unify their thinking, broaden their horizons, and master construction skills and methods. At the same time, we conduct quality inspections regularly and irregularly, and adopt a supervision method that combines fixed-point inspections and inspections on key parts and key links. It has raised the company's engineering technology and quality management level to a new level, which has played a role in establishing a corporate image, building quality projects, and enhancing the company's market competitiveness.
4. Strengthen the learning of quality management knowledge and carry out various trainings
Based on the actual situation on site, Yuanhong Project Company recruits migrant workers with low cultural quality and poor quality awareness. light. In response to this situation, we organized the project department to carry out technical training and quality learning for employees. The learning content included quality laws and regulations, construction technical guidelines, etc., so that employees could further understand the importance of quality.
5. Carry out various quality activities
The company has carried out various quality promotion activities such as "Quality Month Activities" and hung promotional slogans in conspicuous places to create an atmosphere of full participation in quality management. atmosphere, and conducted a safety and quality inspection of each project, notified the problems detected, and required each project to sort out the identified problems one by one, register them one by one, identify the responsible persons one by one, formulate corrective measures one by one, and cancel the accounts one by one. , specially assigned personnel to follow up and review, and formulate effective measures for rectification, assigning responsibilities to specific departments and specific responsible persons; formulate effective measures for common quality problems to eliminate various quality hazards on the project site.
3. Summary of experience
Safety and quality work are the top priorities for our development enterprises. We will always implement the management concept of "safety first, quality first" and always keep in mind " Safety is more important than Mount Tai, and quality is the lifeline of an enterprise." Yuanhong Project Company's safety production and construction quality management work runs through the entire process of project construction. As safety and quality management workers, we must ensure the safety and quality of the project. In 20__, we must clarify our work ideas, strengthen safety management, improve the quality system, improve competitiveness, and work hard to comprehensively and excellently complete the safety and quality management goals in 20__. Quality and safety year-end work summary 2
Further implement the implementation of various quality laws, regulations, and technical standards, deepen the quality awareness of all employees, strive to improve quality management levels, and conscientiously implement the construction and transportation of Pudong New Area in __ City The spirit of the committee’s relevant document notice on carrying out quality month activities. __ Municipal Affordable Housing Sanlin Base Lot 7 Project (D3-2) combines the actual situation of the project department, adapts measures to local conditions, actively cooperates and carries out the "Quality Month" activities, and strives to push the quality level of the project to a higher level A new level.
1. Activity materials
1. Hang banners and slogans during the "Quality Month" to strengthen the quality management of the Quality Month, quality control, and publicity of the importance of quality, so that The theme of the "Quality Month" activity is deeply rooted in the hearts of the people.
2. Organize various departments of the project department to conduct joint inspections of on-site construction quality, propose solutions to existing quality problems and common quality problems on site, and strengthen the rectification of these problems to ensure that project quality defects are eliminated nip in the bud.
3. Organize relevant technical personnel and construction personnel to discuss the common quality problem control plan and preventive measures at the construction site, do a good job in explaining the common quality problem plan and preventive measures, and analyze the existing quality hazards in advance. Control at the source.
4. Strengthen the training of operating workers, including construction procedures, technology and related technical and quality training for new employees entering the site.
2. Achievements from carrying out the "Quality Month"
1. The quality management system has become more complete
After nearly a month of carrying out the "Quality Month" activities , our project department has further improved the quality management system, established a quality management team headed by the project manager, and implemented the quality policy of all-staff management. Quality management responsibilities have been further clarified, quality management information has been refined, and quality management rewards and penalties have been increased!
2. The goal of quality management is more clear
The theme of this "Quality Month" activity is "Abide by quality integrity and build high-quality projects", so the key to carrying out this activity is In the implementation of "quality integrity", the current difficulty in construction site management lies in the fact that the quality of on-site construction personnel is generally low, so ensuring that construction personnel "abide by quality integrity" is the key to ensuring project quality. After this activity, our project department further clarified: the top priority of project quality management is to strengthen the cultivation of construction personnel's awareness of quality and integrity.
3. The quality awareness of construction personnel has been significantly improved
During the implementation of this quality month, our project department actively responded to the "About the Construction of Pudong New Area in 20__" "Notice of Project Quality Month Activities" document calls for the purpose of improving the quality awareness of construction personnel, carefully training and educating on-site construction personnel, and at the same time striving to create a good atmosphere of "strengthening quality management awareness" at the construction site. Improved the subjective initiative of construction personnel's quality management awareness.
3. Outlook for quality work in the future
The "Quality Month" in 20__ will soon be over, but doing a good job in quality work is the eternal theme of the company, and it is also the key to the quality of the project department. an important point. As the management work of the project department of No. 7 plot (D3-2) of Sanlin Base of affordable housing in __ City, the quality work has a long way to go. After the implementation of this "Quality Month" activity, our project department Some improvements have been made in some aspects, but at the same time, deficiencies in quality and safety have been exposed.
I believe that the launch of this event is just the beginning. All employees of the project department will continue to work hard to survive and develop with quality, and to defend the project department of Lot 7, Sanlin Base, Sanlin Base, __ city’s affordable housing, and Heilongjiang Construction Engineering Group Co., Ltd. Responsibilities Company image. Strive to adhere to quality integrity and ensure the construction of high-quality projects! Quality and safety year-end work summary 3
In 20__, under the correct leadership of the company leaders and the strong support of all grassroots units, and under the guidance of the system department of the company, the engineering quality department was responsible for engineering quality supervision, We have done some work in mass __ group activities, quality excellence, and new project planning, and have achieved some results, but there are still shortcomings. We will find out the shortcomings in our work through summary and data analysis. The deficiencies will continue to be improved and improved in future work.
1. The quality objectives have been fully achieved, and the project quality is basically under control.
Through the operation of the program, all the projects completed this year are guaranteed to pass the first delivery inspection, reaching the first delivery goal set at the beginning of the year. Aim for a verification rate of 100. The company makes full use of the incentive mechanism, rewards the good and punishes the bad, prompting each project to provide high-quality products and services to the owners, so as to continuously improve customer satisfaction. Strictly follow the operation of the measuring instrument management system, overcome the previous problems of unclear ownership of measuring instruments, unclear responsibilities of the user units for inspection, and chaotic management, so that the passing rate of measuring instruments for inspection reaches the requirement of 100 set at the beginning of the year. Use mass __ group activities to eliminate common quality problems, improve process flow, steadily improve the quality of project entities, and reduce quality failures.
Actively promote new technologies, and carry out excellence creation work in a planned manner throughout the company. Through the management and promotion of the early planning of engineering projects by the company, the entire company has now clearly understood the early planning of engineering project implementation. Work is an important prerequisite for good project management. In view of this, when the company set the quality target at the beginning of the year this year, it took the pre-planning coverage rate of 100% as an important work goal. Completed the quality inspection and process monitoring tasks planned at the beginning of the year, promptly issued a corrective or preventive action request form for the problems discovered during the inspection, and supervised the implementation of corrective measures. In strict accordance with the requirements of the quality internal audit plan, routine audits were conducted on all construction-in-progress project departments of the company's agencies and permanent institutions. We also notified the problems discovered during the internal audit and urged the completion of improvements to the non-conforming items raised during the audit.
2. Existing shortcomings
Many new quality management personnel are not proficient in the business and cannot skillfully use various quality management methods to improve process performance. Some even Reports cannot be filled out correctly. There are blind spots in the operation of the quality system. Due to abnormal quality management work in individual project departments, quality problems have occurred that affect the use and function of the structure. Some project departments also have insufficient measuring instruments and failure to meet calibration requirements. Non-conforming products cannot be disposed of in accordance with regulations. Most project departments have no records of the disposal of non-conforming products throughout the year. The main reason is that there are still misunderstandings and the disposal of non-conforming products cannot be used as an important means to improve quality management. There is still a gap in communication, mainly manifested in the project department's inability to report the disposal records of non-conforming products as required.
3. Work plans for next year
The dominant idea of ??next year’s work is to manage the key process of quality work and manage the management process that is insufficient this year. Eliminate communication gaps by focusing on the submission of various reports, and pay close attention to the disposal of measuring instruments and non-conforming products through irregular process monitoring and quarterly quality inspections. Based on the status of the projects in hand, the excellence goals are reasonably determined and implemented according to the excellence plan. Through the operation of process monitoring and measurement, product monitoring and measurement and other procedures, we ensure product quality and ensure that its one-time inspection pass rate reaches 100. From the beginning of the year, __ activity topics are planned according to the specific conditions of each project and carried out in a planned manner _ _Group activities to promote the application of new technologies and eliminate common quality problems.
As the leading department for system operation, we guide and help each business system to do a good job in the operation of the quality system and adopt the form of rolling audits. The audit will focus on the key factors affecting the effectiveness of the quality, environment, and occupational health and safety management systems. process, and work with each system to improve the effectiveness of the management system operation. Accept the leadership of the company's Engineering Quality Supervision Department, serve the grassroots, and strengthen the guidance and supervision of system managers to improve the system's ability and efficiency. Quality and safety year-end work summary 4
Time flies, 20__ is coming to an end and will soon become a thing of the past. The past year has been an unusual year, and it also records every bit of our journey along the way. As a functional department responsible for the company's quality control, I deeply understand the burden of work during this year. I am also very grateful to my superiors for their support and care in my work, and to my colleagues for their support and assistance. As we are about to face new tasks and challenges in 20__, let us first review the relevant situation of quality work in 20__:
1. Strengthen our product quality management work to ensure product quality
In order to ensure the quality of our products, we conduct inspections in strict accordance with product requirements to prevent missed inspections and incorrect inspections. During the inspection process, the company's relevant inspection procedures and technical requirements are strictly followed. Warehouse and circulate qualified products. For unqualified products, follow the relevant procedures for unqualified products, issue unqualified review and processing orders and report them to relevant departments, and cooperate with them in cause analysis, improvement measures, and tracking and summary.
2. Training and improvement in inspection skills
1. Compared with last year’s training work, there has been a significant improvement in both training methods and training quality. . This is mainly reflected in the training of outsourced professional knowledge and the exchange of technical experience in the same industry, which has accumulated valuable experience for our future work. We can provide inspection guarantee according to customers' different requirements for products, and reach an agreement on the complete understanding of product requirements.
2. Through the inspection and the situation reported on site, the requirements of the inspector when inspecting the product were emphasized, and the acceptance was carried out in strict accordance with the process card and inspection procedures.
3. Inspection of raw materials and product performance
1. Because molding sand plays a vital role in products, according to process requirements, molding sand inspectors are required to mix sand in the workshop every day The molding sand performance of the machine is tested, and the flow rates of sand, resin, and curing agent are tested monthly to ensure the stability of the molding sand. Reduce the occurrence of pores, looseness and other problems in castings, and reduce the usage of resin and curing agent. On the one hand, it improves the yield of the product, and at the same time, it also greatly reduces the cost of production. This year, the tensile strength test of the figure 8 test block was added, which better provides a strong guarantee for the performance of the molding sand.
As the saying goes: three-part modeling, seven-cent melting. Spectral testing before the furnace provides reference data for smelting to ensure the correctness and stability of the ingredients; chemical composition testing provides a basis for post-furnace analysis of casting product components; in addition, new chemical trace elements have been added this year: titanium, The detection of copper and chromium has played a certain role in the control of trace elements in products; in terms of raw materials, new incoming inspections of resins and curing agents have been added, and data information is fed back to relevant departments in a timely manner to ensure product stability.
2. The management of casting test blocks is also one of our key improvement projects this year: the original management was very irregular. Through the efforts of the physical and chemical staff, we overcame the difficulties and classified the test blocks according to customers. , establish detailed ledgers, and complete the establishment of the company's test block warehouse.
4. For this year’s output and yield targets
In view of this year’s planned annual output of 30,000 tons and a pass rate of 94, from January to December 20__, the actual output was 29,390T , the pass rate is 91, which is basically the same as last year. In particular, the quality problems of this year’s wheel hub, base, planet carrier, and box body have greatly affected this year’s yield status. I hope to continue our efforts next year and strive to achieve the target value.
5. ISO quality system situation
In order to better improve and implement the ISO quality system to play a role in the enterprise, June and July were used to complete the arrangement of the third-level documents of the quality system. and compilation work, and successfully passed the ISO quality system certification audit during the annual review in August. Later, it successively passed the quality system certification and audit of customers such as South Korea's LG, Sany Electric, Japan's Mitsubishi, and the United States' GE.
6. Supplier Assessment and Inspection
The purpose of reviewing suppliers is to start from the source, avoid potential problems, and minimize risks. This year we completed the review of production suppliers for pig iron, scrap steel, molding sand, coatings, resins, curing agents, etc. It provides a strong guarantee for production and improves the "Supplier Quality Claim Management Measures". First, it effectively controls product quality, and second, it reduces our losses and production costs.
7. Inspection shortcomings
1. Due to the large number of newly developed products and diversified varieties this year, in addition to mainly ductile iron parts before, gray iron parts are now also produced. As a result, the inspection cannot grasp the key points, resulting in a certain degree of missed inspection, especially in dimensional inspection, which still needs to be improved.
2. The inspectors lack foresight and experience in their work, and their sense of responsibility needs to be strengthened. When product problems are discovered, timely feedback should be provided, focusing on production and technical communication, and efforts should be made to propose improvement measures to solve the problem as soon as possible.
3. Lack of knowledge about the product and weak inspection skills. The root causes of recurring quality problems were not found, and the following measures did not form a closed loop, resulting in similar problems recurring.
8. Looking forward to the focus of work in 20__
Strengthen team building and personnel skills training, and focus on process control and back-end inspection. Strengthen employees' quality awareness and cultivate their sense of responsibility, so that every employee has a sense of ownership, everyone becomes a quality controller, and the next process becomes our customer. Recognize your own shortcomings and learn from the experiences and achievements of others. Implement product quality tracking cards, strictly implement process requirements, eliminate hidden dangers to products, and eliminate defective products.
Ninth, our goal in 20__
The passing rate of castings is 95, the rate of missed errors during inspection is 98, the passing rate of finished products is 100, and the external quality processing takes 2 working days Within the period, the monthly quality analysis report accuracy rate is 100%, and the quality training plan achievement rate is 100%.
We will work hard to achieve next year's goals and strive for them. This would not be possible without the caring guidance of our leaders and the strong support and cooperation of our colleagues. At the moment of waving yesterday, we will usher in the new year, go down-to-earth step by step, and make unremitting efforts to overcome the shortcomings of the past. We will use actions to prove our results and survive by results.
20__ is a brand new year and a year of self-challenge. I will work hard to correct the deficiencies in my work in the past year and do a better job in the new year for __ Let us work together to create a brilliant tomorrow! Quality and safety year-end work summary 5
20__ is about to pass, and the new year is about to begin. On this occasion of bidding farewell to the old and welcoming the new , review the work history of the past year, summarize the experience and lessons learned in the past year, which will help to leverage strengths and avoid weaknesses in future work, and do a better job in technical work. Here is a summary of the work over the past year:
1. Main tasks this year
In the past year, I participated in the joint review of drawings for new projects and notified the construction personnel of the review contents in a timely manner. After joint review of the drawings, the construction organization design and technical briefing will be prepared in a timely manner and distributed to the construction personnel. During the construction process, many new buildings and projects under construction have repeatedly negotiated and changed the water, electricity and heating projects according to Party A's requirements. Due to the lack of design drawings to meet the functional requirements, Party A's temporary problems often occurred during the construction process. For changes that can be visaed before construction, all changes are timely and accurate, and some changes that cannot be visaed before construction are visaed immediately after the completion of construction.
For projects under construction and new construction, timely and accurately collect material certificates, conduct material testing, concealed project acceptance, inspection batch quality acceptance, and sub-project quality acceptance in accordance with the image progress of the project, and Timely seek the signature and seal of Party A's resident land engineer and supervision engineer, so that the dates of each inspection batch, sub-division, concealed acceptance, and material test of the construction data can be consistent with the actual construction date and meet the requirements for data preparation.
2. Specific work situation
Responsible for the technical management and data preparation of the project, and provide timely material supply plans for each project. The construction site is scattered and has a wide area and long trunk lines. The project involves many construction units and supervision units, there are more changes in each project, and regular supervision meetings are frequent. Under such circumstances, how to do a good job in technical management and data preparation to ensure the quality of project construction, which will not only satisfy Party A and the supervisor, win honor for the company, but also ensure the preparation and review of budgets and final accounts and the supply of material quantities? The problem was right in front of me. In response to this situation, arrange your work reasonably, prioritize, grasp the key points, and take into account others.
3. Work results
The water seal height of the bathroom floor leakage is insufficient and the elevation difference is large; the connection between the bathroom basin and the drainage pipe is not sealed; the distance between the pipe clamps of the water supply pipe is too large and The installation is not firm; the color separation of wires is unclear; the installation elevations of switches and sockets are quite different; the disconnect card in the lightning protection box is corroded; these problems not only violate the construction quality acceptance specifications, but also directly affect people's lives. , the kitchen and bathroom smelled bad, but the residents were unable to deal with it. In response to these problems, we put forward specific requirements to the construction team leader and team leader at the beginning of each construction site, especially emphasizing the seriousness of this problem, and patiently explained to them the requirements in the specifications and the harm to people's lives. In this year's In the completed project, such problems have basically been eliminated.
4. Problems that still exist in the work
After two years of working on the preparation of information and budget and final accounts for the installation office, I deeply feel the busyness of the work and the great responsibility; both big and small things are weighing on me. They tend to pay attention to this end but ignore the other end. They are a little light-hearted and fail to work systematically in an all-round way. When the company checks all engineering data, it does not clearly understand the setting of check points in the quality acceptance of the inspection batch. ; The supervision seal of some projects was delayed, and the entry materials of some projects were not submitted to the supervisor for inspection in a timely manner. Due to the large number of projects and heavy work tasks, individual project data cannot be synchronized with the project. For some projects, due to anti-theft considerations, radiators, switches and sockets were constructed after the doors and windows were installed, resulting in delays in obtaining project change visas, which affected the preparation of final accounts.
5. Future work plans
By summarizing the work of the past year, we can find out the shortcomings in the work so that we can overcome them in future work. At the same time, we need to read more books and study seriously. Learn the regulations and relevant documents and materials, master professional knowledge, improve your work ability, strengthen your sense of work responsibility, and complete all personal tasks in a timely manner. In short, in the future work, I will continue to summarize and reflect, constantly push myself and enrich my energy, improve my own quality and professional level, adapt to the development of the times and the enterprise, and make progress together with the company. Grow together.
- Related articles
- What is the order of painting and labeling (annual inspection, insurance and environmental protection) on new cars?
- How to draw logo
- What flowers can a friend send when he picks up the car? Will he send flowers?
- Complete collection of banners and slogans for sports games
- What slogans did the educated youth have when they returned to the city?
- Team MomentumTeam Slogan
- The latest entry and exit policies and flight change information prevention and control measures for China to resume opening scenic spots in 2020.
- Ask friends in the circle of friends to help recruit nannies.
- Logo design skills
- What are the tourist attractions in Henan Province?