General requirements for gas stations
The process of handling the construction project planning permit:
1, application by the construction unit
2, about to see the scene
3. Put forward the planning and design conditions (preliminary office)
4. Surveying and mapping topographic maps (surveying and mapping units with surveying and mapping qualifications)
5. Constructive detailed planning (design unit with planning and design qualification)
6, building plan, vertical, profile, renderings (design unit with architectural design qualification)
7. Expert review
8. Publicity 15 days
9. Planning approval
10, the construction unit provides the necessary information.
1 1, the first instance of the proxy.
12, microcomputer input
Handled by the manager
cheque
Competent leader for approval
Pay the relevant department fees.
Issue a license
Materials to be provided for the formalities of new gas stations (points):
1, construction project planning permit (copy) and application form for construction application (provided by the Planning Bureau)
2. Power of Attorney (original)
3. Application report (original)
4, Planning Commission or Economic and Trade Commission approval (original)
5, the municipal government planning approval (copy)
6. Planning publicity feedback sheet and publicity sample (original)
7. Opinions of relevant departments (original)
8, building along the street approval form (original)
9. Land certificate and attached drawings (copy)
10, community agreement (original)
1 1. Upon examination, 1 set of construction detailed planning drawings and electronic floor plans shall be signed and sealed by the design unit (the ratio is 1: 500 or 1: 1000).
12, latest electronic topographic map
13 and 1 sets of plan, elevation and section drawings of single building shall be signed and sealed by the design unit to verify the construction area (Table A3).
14, daytime scene renderings, night scene renderings and decoration lighting descriptions of buildings (belonging to buildings along the street)
15, aerial view of community planning
16, guarantee (original),
Schematic diagram of construction project planning permit handling process
The construction unit or individual applies for the construction project planning permit.
Connector for administrative examination and approval window of construction planning department
Incomplete materials will not be accepted and returned to the applicant.
Director approval
Construction Bureau window issued by the construction project planning permit.
Submit information:
1, construction detailed planning or general plan of architectural engineering design scheme
2, architectural engineering design scheme 3, wall material innovation office certificate
Initiate inventory audit
Those that do not meet the planning conditions are returned to the examination and approval unit.
The construction unit or individual applies for the construction project planning permit.
Schematic diagram of the handling process of joint acceptance of construction project completion
Connector for administrative examination and approval window of construction planning department
Incomplete materials will not be accepted and returned to the applicant.
After the acceptance conditions are met, the host warehouse will convene relevant warehouses for construction and planning for acceptance.
Acceptance of the construction bureau window issued by the construction project completion planning acceptance certificate and quality supervision report.
A, planning approval documents:
1 Application Form for Acceptance of Construction Project Completion Planning
2. After completion, actually measure the general plan and the measured area.
3. As-built drawing
Second, the materials submitted for completion acceptance
1, application for supervision and inspection of unit project completion
2, the completion report of the construction unit
3, supervision unit quality evaluation report
4, survey and design units of engineering quality inspection report
5, unit engineering quality control data
Construction units or individuals apply for joint acceptance of construction project completion.
Do not meet the acceptance conditions or unqualified acceptance returned to the examination and approval unit, according to the situation, the construction unit shall be ordered to rectify or hand over the planning acceptance team.
The detailed planning or general plan of the construction of the architectural engineering design scheme, and the flow chart of the examination and approval of the architectural engineering design scheme.
Connector for administrative examination and approval window of construction planning department
Incomplete materials will not be accepted and returned to the applicant.
Director approval
check and ratify
Submit information:
1, construction project planning permission application 2, approved construction detailed planning or construction project design scheme 3, construction project design scheme. Minutes of planning committee meeting.
Initiate inventory audit
Those that do not meet the planning conditions are returned to the examination and approval unit.
The construction unit or individual shall apply for the detailed planning of construction or the general plan of construction project design and the examination and approval of construction project design.
Two, the gas station for the "business license"
(1) Pre-approval of enterprise name for industrial and commercial business license:
1 Application for pre-approval of enterprise name signed by all investors.
2. Identification documents of legal persons
3 other relevant materials required by the audit department.
(two) to change the business license, the following documents shall be provided:
1 Application Form for Change of Business License
Original and photocopy of business license.
Copy of corporate identity card
4 original resolution of the board of directors
5 Original resolution of shareholders' meeting
6. Certificate of appointed representative or * * * same entrusted agent
Three, the gas station for the "construction project fire audit opinion" and "construction project fire acceptance opinion".
Procedures for fire control audit opinions of gas station construction projects
1, and obtain the Application Form for Review Opinions on Building Fire Protection Design.
2. Submit drawings
3, division of labor audit
Step 4 review
5, leadership approval, issuance
Materials required:
1, project approval
2. General plan of the project
3. Fold relevant construction drawings A, B, C, D, and ventilation and air conditioning system construction drawings according to A4 paper size.
Procedures for fire control acceptance opinions of gas station construction projects
Materials provided:
1, power of attorney and valid identification of the applicant.
2. Application Form for Fire Control Acceptance of Construction Project
3, project completion acceptance report A, copy of fire protection design review opinions of construction projects B, fire protection design changes, relevant descriptions of meeting minutes of fire protection design expert argumentation meeting C, as-built drawings D, concealed engineering supervision record materials.
4, all fire products quality certificate.
5. Interior decoration engineering needs to provide a complete set of acceptance record forms and witness sampling inspection reports, such as construction quality management, material entry acceptance, construction process inspection and fire control acceptance.
6, all building components, building materials, interior decoration materials, fire performance requirements in line with national standards or industry standards.
7, fire control facilities, electrical fire prevention technology inspection certificate.
8. Legal identity certificates and qualification certificates of construction, project supervision and testing units.
Four, the gas station for the "approval certificate of refined oil retail business".
Treatment of new gas station:
As the management of business qualification belongs to territorial management, the regulatory authorities can only pass the examination step by step from the county bureau of commerce, the municipal bureau of commerce and the provincial bureau of commerce, and obtain the approval certificate for retail operation of refined oil products.
(a) to provide relevant application materials to the district and county authorities.
Application form for retail operation of refined oil products
Apply for a new gas station
Registered capital of enterprise
feasibility study report
Detailed location map of the proposed gas station (the radius distance and location from adjacent gas stations shall be indicated)
Design and construction scheme of gas station
Identification document of the legal representative who applies for a gas station.
Pre-assessment of environmental pollution
(two) after the examination and approval, the competent department of the district and county shall submit relevant materials to the Municipal Bureau of Commerce, and the Municipal Bureau of Commerce shall, in conjunction with the competent department of the district and county, conduct on-the-spot investigation and pass the preliminary examination. After examination and approval, the Municipal Bureau of Commerce will submit the information to the Provincial Department of Commerce, which will issue the approval letter for gas station construction (project document of the Provincial Department of Commerce).
(three) the enterprise can start construction only after obtaining the consent of the planning, land and fire departments. After the completion of the gas station construction, the district and county departments and territorial urban construction, planning, land, fire protection, meteorology, quality inspection and other functional departments have passed the acceptance test, and the relevant materials will be sent to the district and county commerce bureaus, the municipal commerce bureaus and the provincial commerce departments for review. The information provided is as follows:
1, the project approval document approved by the Provincial Department of Commerce
2. Projects approved by the National Development and Reform Commission
3. Detailed location map of the proposed gas station (the radius distance and location from adjacent gas stations shall be indicated)
4, issued by the land department of gas station "state-owned land use certificate" or land use approval confirmation document.
5, construction land planning permit
6, the construction project planning permit
7, the construction project construction permit
8, gas station design drawings and construction scheme (with engineering design qualification certificate)
9, construction engineering quality acceptance certificate
10, audit opinion on fire protection design of building engineering
1 1, fire control acceptance opinions of construction projects
12, lightning protection device acceptance certificate and lightning protection test report
13, pre-assessment of environmental pollution
14, environmental protection acceptance document or environmental impact report (table) issued by the environmental protection department.
15, certificate of measurement and verification of tanker issued by quality and technical supervision department.
16 "verification certificate" for qualified oil storage tank products
17, feasibility study report
Change and annual inspection of the approval certificate for retail operation of refined oil products;
Submitted materials (changes):
1. Original approval certificate for retail operation of refined oil products (original and photocopy)
2、《lt; Refined oil retail business approval certificate > change registration form
3. The Notice of Pre-approval of Enterprise Name Change issued by the administrative department for industry and commerce and a copy of the changed business license (copy).
4. The enterprise that changes the legal representative or person in charge shall provide the certificate of change of the legal representative or person in charge and the changed business license (photocopy) and photocopy issued by the enterprise and the superior competent department.
5, other relevant information required by the audit department.
Submitted materials (annual inspection):
1, annual inspection registration form of refined oil enterprises;
2, a copy of the approval certificate of refined oil business;
3. Refined oil wholesale and retail enterprises need to provide an agreement on refined oil supply that meets the requirements of the Measures for the Administration of Refined Oil Market within the validity period;
4. Business license issued by the industrial and commercial department;
5. Business license for hazardous chemicals issued by the safety supervision department;
6. An audit report or statement on the purchase and sale of refined oil in the previous year issued by a legally qualified audit department, or provide a tax payment receipt for the purchase and sale of refined oil issued by the tax department;
7, oil depot and gas station (point) proof of property rights;
8, oil depot and gas station (point) infrastructure expansion in the last year, it is necessary to provide the approval documents of oil depot and gas station (point) issued by the provincial department of commerce and the acceptance documents of relevant departments;
9, the enterprise last year in terms of quality, measurement, fire control, safety, environmental protection, etc. Whether there are violations of laws and regulations.
Five, the gas station for the "dangerous chemicals business license"
"Three simultaneities" process of hazardous chemicals construction project
(1) Safety review of construction project initiation: Before applying for safety review of construction project initiation, the construction unit shall select a qualified safety evaluation agency to conduct safety evaluation of construction project initiation. The following construction projects shall be evaluated by Grade A safety evaluation institutions:
1, approved by the State Council and its investment authorities (approval and filing);
2, the people's governments of provinces, autonomous regions and municipalities directly under the central government and their investment departments for examination and approval (approval, filing);
3. Production of highly toxic chemicals;
4, across provinces, autonomous regions and municipalities directly under the central government;
5. The General Administration of Work Safety and the work safety supervision and management departments of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government have special requirements. Before the establishment of a construction project, the construction unit shall apply to the corresponding safety supervision bureau for the safety review of the construction project, and submit the corresponding documents and materials.
(2) Design review of safety facilities of construction projects
1. The design of safety facilities of construction projects shall be carried out by design units with corresponding design qualifications, and the design units shall be responsible for the design of safety facilities of construction projects. 2, the construction unit shall, after the completion of the design of the safety facilities of the construction project, apply to the corresponding safety supervision bureau for the design review of the safety facilities of the construction project, and submit the corresponding documents and materials (the application materials are attached).
(three) the construction project trial production plan for the record
1, the construction unit shall organize relevant units and experts to study and put forward the possible safety problems and countermeasures in the trial production (use) of construction projects, and formulate a careful trial production (use) plan in accordance with the relevant laws, regulations, rules and standards for safety production.
2. The construction unit shall, before the trial production (use) of the construction project, submit the trial production (use) scheme of the construction project to the corresponding safety supervision department for review and filing.
3, the construction unit to take effective safety measures, the construction project safety facilities and production, storage devices and facilities at the same time for trial production (use). Trial production (use) shall not exceed the time limit specified in the trial production (use) scheme of the construction project.
(four) the completion and acceptance of the safety facilities of the construction project
1, after the completion of the safety facilities of the construction project, the construction unit shall, in accordance with the provisions of laws, regulations, rules and standards related to production safety, test the safety facilities of the construction project to ensure that the safety facilities of the construction project meet the safety requirements for the production and storage of dangerous chemicals and are in a normal applicable state.
2. Before the safety facilities of the construction project are completed and accepted, the construction unit shall, in accordance with the provisions of Article 7 of the Measures for the Implementation of Safety Permit for Dangerous Chemicals Construction Projects (Order No.8 of the State Administration of Work Safety), select a safety evaluation institution with corresponding qualifications to conduct safety evaluation on the trial production (use) and safety facilities of the construction project.
3. The safety evaluation institution shall evaluate according to the laws, regulations, rules, standards and norms related to safety production, and be responsible for the authenticity of the safety evaluation report on the completion and acceptance of construction projects.
(a) the establishment of construction project safety review:
1, application for safety review of construction project establishment;
2, the construction project approval 1 copy (NDRC);
3, the construction project planning permission related documents (copy);
4, a qualified engineering consulting unit issued by the construction project feasibility study report or safety conditions demonstration report;
5. The safety evaluation report of the construction project issued by the unit with safety evaluation qualification;
6. Notice of pre-approval of business license or enterprise name issued by the administrative department for industry and commerce (photocopy)
(two) the design review of safety facilities of construction projects:
1, application for safety facility design review of construction project;
2. Construction Project Approval (NDRC);
3, the construction project planning permission related documents;
4, a qualified engineering consulting unit issued by the construction project feasibility study report or safety conditions demonstration report;
5. The safety evaluation report of the construction project issued by the unit with safety evaluation qualification;
6, the construction project set up safety review opinions;
7, the preliminary design information of the construction project (including the qualification of the design unit and a full set of reports);
8. Design of safety facilities for construction projects.
(three) the construction project trial production plan for the record:
1, the construction project is completed;
2, the production and storage of dangerous chemicals varieties and design capabilities;
3, trial production (use) in the process of possible safety problems and countermeasures;
4. Safety measures taken;
5, accident emergency rescue plan;
6. Prepare the list of experts and technicians of the trial production (use) scheme and their signatures, as well as the signatures of the scheme review and review personnel.
7 construction project trial production (use) plan approval form and construction project trial production (use) plan filing declaration form.
(four) the completion and acceptance of safety facilities of construction projects:
1, construction project approval;
2, the construction project planning permission related documents;
3, the construction project feasibility study report or safety conditions demonstration report;
4, the construction project set up safety evaluation report;
5, the construction project set up safety review approval;
6, the preliminary design data of construction projects, safety facilities design articles and their review and approval;
7, construction, supervision unit construction, supervision qualification documents;
8, the construction project trial production (use) scheme for the record;
9, construction project safety acceptance evaluation report;
10, summary of the "three simultaneities" of the construction project (summary of the implementation of "three simultaneities" by the construction unit, summary of the construction work by the construction unit and summary of the supervision work by the supervision unit);
1 1. According to the relevant contents of the Completion Acceptance Form for Safety Facilities of Hazardous Chemicals Construction Project, internal acceptance of the enterprise is required;
12, post safety responsibility system, safety production rules and regulations, safety operation procedures, etc.
13. Relevant information on the safety qualification of the person in charge of the enterprise and the safety production management personnel (photocopies);
14, special operations personnel certificate (copy);
15, list of three-level safety training and education personnel;
16, emergency rescue plan and relevant information on rescue equipment and rescue team;
17, high temperature, high pressure, boilers, elevators, hoisting machinery and other dangerous equipment passed the inspection by the quality supervision department (copy);
18, detection and identification data of occupational hazards;
- Previous article:What was Tiananmen in the Qing Dynasty? What was Tiananmen’s original name?
- Next article:Is there an app for lawyers to consult?
- Related articles
- Public welfare posters-appreciation of environmental protection public welfare posters
- Hitachi air conditioner after-sales service, you can trust it
- What do you mean, remember? What do you mean, three times and nine times?
- How did Honda XRV win the favor of consumers?
- What are some beautiful phrases for fighting the epidemic?
- How to write the word anti-virus in handwritten newspaper?
- Have you ever been moved to tears by yourself?
- Sentences describing sweet potatoes
- Suggestions on prevention and control of current epidemic situation in Ganyu District of Lianyungang City in June 2022 5438+065438+ 10.
- Sina's slogan