Joke Collection Website - Bulletin headlines - Emergency plan for flood control safety

Emergency plan for flood control safety

202 1 Emergency Plan for Flood Control Safety (6 general articles)

In our daily study, work and life, we sometimes encounter unexpected accidents. In order to make emergency response in time and reduce the consequences of accidents, we often need to make emergency plans in advance. How to prepare an emergency plan? The following is my 20021emergency plan for flood control safety (6 articles in total), hoping to help you.

Emergency plan for flood control safety 1 purpose: to ensure the normal living and working order of business households and the safety of life and property, to ensure the normal operation of all equipment, and to make all buildings, facilities and equipment safe for flood control in summer.

Scope of application: projects under the jurisdiction of the company

Supervise the implementation: project manager (the second working time is the manager on duty)

Responsibilities: Project Property Department, Engineering Department and Security Department are responsible for supervising the implementation.

Emergency procedures for flood control:

A, flood control organization procedures

1, set up a flood control team before the flood season, with the project manager as the team leader, the engineering supervisor as the deputy team leader, and the team members as the security supervisor, property supervisor and duty manager;

2. In case of danger, the project manager is responsible for allocating material resources and manpower, the director of the engineering department is responsible for on-site command, and the manager of the customer service center and the manager of the security department are responsible for allocating the personnel of this department for emergency rescue. In case of danger at night and on weekends, the manager on duty will be in charge of the command temporarily, and inform other flood control team members to rush to the scene in time.

Second, the engineering department in the flood season flood control measures

1. Set up a special storage room for flood control equipment, mainly including several submersible pumps, drainage hoses, waterproof distribution boxes, woven bags, sand, shovels, etc.

2, the key to the flood control equipment library should be stored in the security department, engineering department, project department;

3, before the arrival of the flood season, engineering maintenance personnel and security patrol personnel should carefully patrol.

(1) Whether the drainage ditch of the roof platform is unblocked, and cleaning up the garbage on the roof at the same time;

(2) Check whether the sewage pump in the underground pool is sensitive and effective, and put the control in the "automatic" position;

(3) Check the rainwater wells, sewage wells and rainwater pipes inside and outside the building for deposits, and clean them to ensure smooth drainage;

(4) Check whether there is rain leakage in important computer rooms such as transformer room and central control room, and handle it in time if there is any.

Third, the dangerous situation handling procedures

1. If rainwater is poured into the underground machine room, engineers should start the sewage pump to drain in time and block the machine room door with sandbags to protect all kinds of important equipment. In the evening and weekend, the manager on duty organizes personnel to carry out emergency rescue on the one hand, and immediately informs the project manager and other flood control team members on the other hand;

2. The security personnel are commanded by the manager of the security department, some personnel maintain order, and some personnel assist the engineering department to eliminate danger and rescue equipment;

3, the property department personnel to remove water everywhere;

4. After the dangerous situation occurs, it is necessary to conduct a comprehensive inspection, count the losses and material consumption caused by this flood, and replenish flood control materials in time to prepare for the next flood control;

5. The event handling process should be recorded in detail, and the project manager should report to the company leader.

Emergency Plan for Flood Control Safety 2 With the arrival of rainy season, according to the Notice of Liuyang Safety Supervision Administration on Doing Well the Safety Work of Non-coal Mine Enterprises at Present, flood control and flood prevention work is imminent. In order to spend the flood season safely, our mine has formulated an emergency plan for flood control, set up a leading group for flood control, and equipped with sufficient materials, equipment and other flood control materials to ensure the mine to spend the flood season safely and smoothly. The contingency plan is as follows:

First, the emergency principle:

Our mine adheres to the principle of putting prevention first, combining robbery prevention with unified command, unified dispatching and obeying the overall situation, carries forward the spirit of unity and flood control, and actively cooperates and unites under the unified guidance of the leading group for mine flood control to ensure the safety of mine flood control.

Second, the work plan:

Formulate the safety management system for flood control and flood fighting, ensure that all staff have flood control awareness, and implement the system to all teams and personnel. Timely conduct safety flood control education and flood control safety responsibility education. Always check the preparation of flood control materials and the operation of flood control equipment to ensure the emergency when the flood comes. Strengthen logistics support and services to ensure the safety of personnel, materials, equipment and on-site work.

Three, the establishment of flood control front-line headquarters, clear responsibilities:

Commander in chief: xxx

Deputy commander: xxx

Member: xxxxxxxx

Commander-in-Chief: Take overall responsibility for mine-wide flood control and unified command of flood control and flood prevention work.

Deputy commander: responsible for implementing the preemptive plan and mobilizing flood fighting personnel and needed materials. Prepare emergency equipment in time, run to the designated place quickly according to the command of the commander-in-chief, and be responsible for the accommodation of disaster relief personnel.

Members: Carry out the instructions of the commander-in-chief, and be responsible for the supply and reserve of flood control materials, the dispatching and transportation of equipment and all related matters of emergency rescue work. Medical group: the staff of Nanyue village health center is responsible for treating the injured in the rescue process.

Fourth, the emergency plan:

(1), set up a front-line headquarters for flood control and flood fighting under the command of the mine manager, with division of responsibilities, clear responsibilities, ensuring that the responsibilities are assigned to people, strengthening dispatching, and ensuring that all actions are commanded and obeyed. When the flood season comes, assign a special person to be on duty at the scene and set up a flood control and rescue team.

(2) Make a good material supply plan, arrange the preparations for flood control materials, and prepare enough flood control materials such as woven bags, sand, pumps, shovels and raincoats before the flood season comes.

(3) Strengthen the maintenance and repair of loaders and generators put into the rescue site, ensure the normal operation of temporary equipment in flood season, and give full play to the emergency function of equipment in special period.

(4) The materials and equipment threatened by flood on the ground shall be arranged by the mine manager in a unified way and transported to a high safety zone as far as possible.

(5) According to the change of water level, the commander-in-chief should organize flood control team members to dredge flood drainage channels as much as possible to minimize the property loss of the mine.

(6) Xie Xiyuan is responsible for keeping the team, distributing tools, materials and materials needed for flood fighting and emergency rescue work according to the requirements and instructions of the headquarters, and ensuring the smooth progress of flood fighting and emergency rescue work.

(7) The medical group is served by the medical staff of Nanyue Village Health Center. In the process of emergency rescue, medical personnel should go to the scene to treat the injured in time, and the seriously injured should be sent to the hospital in time for treatment.

(8) Xie Haibo is in charge of the car group, and there are enough cars to transport the wounded and medical personnel in case of emergency rescue.

(9) Xiong Shanbao is responsible for the communication group. After the accident, be responsible for convening flood fighting and emergency rescue personnel, contacting relevant units at higher levels, and reporting relevant spirits and instructions of higher levels to the general commander in time.

(10), if the accident is too big for our unit to handle, we should immediately notify the mine rescue team for rescue.

V. Quantity and storage location of emergency equipment and materials:

Factory department storage room

Emergency plan for flood control safety III. Flood control situation and main tasks

After the reconstruction was destroyed by water, the reservoir area (hereinafter referred to as the reservoir area) was built. The reservoir area mainly undertakes the water demand for fish farming in nearly 3,000 hectares of paddy fields and state-owned fishing grounds in Datun Town. Because the dike project is not perfect, emergency rescue is carried out every year. Especially since this year, due to flood storage and diversion measures, the water level in the reservoir area is relatively high. At present, the water level in the reservoir area has reached 132.45 meters. In addition, 65438+ 1 100 million cubic meters of paddy fields will still be discharged into the reservoir area from Zhenlai branch of the prison. Due to the heavy wind and waves in autumn, 4420 meters of dikes have been in danger, including 265430 meters of serious danger.

Based on the principle of scientific and democratic decision-making, in order to ensure the safety of the reservoir area. The county government organized experts to demonstrate the flood control in the reservoir area. According to the opinions of the expert group, the general requirements for flood control and emergency rescue in the reservoir area are to insist on safety first, prevention first and rescue with all one's strength. Not only to hold the water, but also to hold the embankment.

Second, the specific arrangements for flood control work

(a) the establishment of temporary headquarters for flood control and emergency rescue in the reservoir area, leading the organization work. According to the actual situation of the reservoir area. The chief commander is the deputy magistrate of the county government, and the deputy chief commander is the chief procurator of the procuratorate, the director of the water conservancy bureau and the party secretary of the state-owned fishery. There are three working groups under the headquarters. First, the rescue team headed by the director of state-owned fishing grounds is mainly responsible for dispatching rescue manpower and materials and organizing flood fighting and rescue. Second, the material group, headed by the party secretary of the state-owned fishing ground and the director of the Fisheries Bureau, is mainly responsible for providing material support for emergency rescue. Third, the technical team headed by the chief engineer of the Water Conservancy Bureau is mainly responsible for putting forward the rescue plan for the reservoir area and guiding the rescue work throughout. The emergency rescue in the reservoir area is under the unified leadership of the headquarters, and the rescue work is tracked, supervised and inspected throughout.

(two) by the county and fishery * * * with commitment, the implementation of funds. The emergency rescue in the reservoir area is estimated to cost 200,000 yuan. The county finance takes 654.38+million yuan, the fishing ground supports 654.38+million yuan, and the emergency rescue funds are earmarked for special purposes, which are uniformly dispatched, used and managed by the headquarters. Woven bags, bags and other emergency materials shall be solved by the headquarters in a unified way by coordinating relevant departments and towns.

(3) Focus on time and progress. This time, the rescue in the reservoir area took the form of fighting a tough battle. Concentrate manpower and material resources to ensure that the danger is relieved within ten days.

Third, several requirements.

(1) strengthen confidence. All localities and relevant departments should attach great importance to the emergency rescue work in the reservoir area and unify their thinking. We should regard it as a central task at present, raise awareness and unify our thinking. At present, it is especially necessary to do a good job in the ideological work of fishery cadres and workers. It is necessary to strengthen positive propaganda and guidance, educate the cadres to correctly look at the current situation, overcome the fear of difficulties and luck, fully understand the scientific, feasible and necessary decision-making of the county government, and then enhance their confidence and determination to do a good job in emergency rescue.

(2) suited, nozzle. Emergency rescue under the unified leadership of the headquarters, clear responsibilities. According to the current actual situation, the technical team should come up with a rescue plan as soon as possible and put forward clear requirements for what standards each dangerous road section should meet. According to the requirements of the technical team, the materials team should prepare materials in advance to ensure emergency needs. Rescue teams should implement rescue workers as soon as possible, ensure the team size, rationally allocate labor and arrange time, and improve efficiency. At the same time, the fishery should implement patrol personnel and insist on 24-hour patrol to ensure that measures can be taken in time in case of danger.

(3) Ensure safety. Flood control work is of great responsibility and adheres to standards. All members of the headquarters must understand and treat this problem from the perspective of being responsible for the party and the cause and people's lives and property. They must be serious about work discipline, adhere to engineering standards and strictly operate procedures to ensure that they do not make any mistakes. At the same time, in view of the continuous traffic and cold weather, various safety precautions and safeguard measures should be taken to ensure the construction safety.

(4) coordinated operations. The emergency rescue work in the reservoir area is closely coordinated. At present, it is a key work in the county. All localities and relevant departments must have the concept of the overall situation, establish the idea of "playing a game of chess", take the initiative to take sides, do their duty, and fully support emergency rescue work. The working groups of the headquarters should enter the role as soon as possible, clarify their responsibilities, implement their tasks, do a good job of connecting and actively cooperate to ensure the safety of the reservoir area during the flood season.

Emergency plan for flood control safety 4 In order to prevent severe weather such as rainstorm, thunder and lightning, prevent possible floods, and ensure the personal safety of teachers and students and the safety of campus property, this emergency plan is formulated in combination with the actual situation of our school.

The first is to set up a leading group for storm prevention and flood control.

Group length:

Members:

Second, the preparatory work

1. Before the rainstorm, all primary and secondary schools should carefully check the condition of school buildings, check whether the roof leaks and the walls are damp, clean up drainage facilities such as sewer pipes and ditches, and repair them in time if there are any problems;

2. Educate teachers and students on the safety knowledge of rainstorm prevention, lightning protection and flood control, and plan ahead;

3. Check the surrounding environment of the school to prevent the school from accidents due to external reasons. Schools close to hillsides should pay close attention to mountain conditions to prevent landslides and other disasters;

4, check the circuit equipment, to prevent accidents caused by water jet;

5. Units with the flood control task of Jushui River should set up flood control and rescue commandos, implement personnel and responsibilities, and prepare enough sandbags, sand, shovels, raincoats, flashlights and other flood control appliances;

6, check my central school is responsible for flood control of the two gates and river embankment area, make flood control arrangements, prepare personnel and equipment;

7. Each school determines the evacuation route and resettlement site in case of emergency, and organizes teachers and students to carry out self-help, mutual rescue and escape drills.

Third, emergency measures.

1. Pay attention to the weather forecast. In case of bad weather or flood season, the school must arrange 24-hour duty, and all personnel should keep communication open for 24 hours, so as to deploy all kinds of personnel in time in case of emergency;

2. During the rainstorm, the school personnel on duty and security personnel should often patrol all parts of the school. Schools with boarding students should focus on inspecting student dormitories. If any danger is found, report it to the supervisor on duty and the unit leader immediately and start the emergency procedure;

3, strong lightning weather, do a good job of lightning protection for school personnel and electrification and distance education equipment;

4. Once the school building is in danger, quickly organize students to evacuate in an orderly manner and move to a safe area. Teachers should first ensure the personal safety of students;

5. Timely transmit information to relevant departments and personnel through campus radio, telephone, mobile phone and other media and communication tools, inform the situation and get support from all sides;

6. Pay attention to the road conditions of students going to and from school. If the road is damaged or there are potential safety hazards, students cannot go home. Schools should properly arrange students and contact parents in time.

7, according to the unified arrangement of the town government, organize personnel to do a good job of blocking the river bank.

Fourth, the job requirements

1. We should attach great importance to it ideologically, overcome our lax thinking, and be prepared in the spirit of being responsible for the cause of the party and the people.

2, the work should be implemented, a clear division of labor, material reserves in place;

3, organization and coordination, to ensure the smooth implementation of government decrees.

Emergency Plan for Flood Control Safety 5 I. Purpose

In order to protect the life safety of employees, ensure the life and property safety of engineers when the rainy season comes, ensure the normal construction of the construction site, and control the losses to a minimum, according to the spirit of relevant flood control documents of the state, province, city and county, the emergency plan for flood control is formulated.

Second, organization.

Emergency leading group for flood control in rainy season in the fourth bid section of Foxconn employee security room (Phase I) in Hang Jian, Sichuan:

Team leader: Liu Zhi

Deputy Head: Yan Bing

Members: Dong Lei, Yu Heng, Lin,,.

The leading group for flood control and emergency rescue in rainy season in the fourth bid section of Foxconn employee housing (Phase I) in Hang Jian, Sichuan Province is located in the project office.

Contact information of third-party rescue:

Emergency telephone 120, alarm telephone 1 10, and fire alarm telephone 1 19.

Third, the basic principles

The flood control work adheres to the principle of "safety first, constant vigilance, prevention first and all-out rescue", actively formulates and implements flood control plans, strengthens drainage measures, scaffolding reinforcement and electrical equipment management inspection, and strengthens weather forecast collection to nip in the bud.

1) and (Liu Zhi) are responsible for on-site guidance and coordination with various departments.

2), (Dong Lei), (Yu Heng) and (Lin) are responsible for tracking and checking the construction and finished product protection of each operation surface.

3), (Wang Lizhong) is responsible for the safety management of the construction site, to do a good job of safety education in rainy summer construction.

4), (Yan Bing) is responsible for the reasonable stacking of site materials, waterproof and moistureproof, maintenance of various mechanical equipment and preparation of flood control equipment.

5), (Zhang Chengyi) is responsible for the temporary electricity, equipment and tools for insulation inspection, to prevent wire peeling, leakage, etc.

Four, material preparation:

According to the specific situation of the project department, prepare equipment and materials for flood control. Prepare water pump, water pipe, tarpaulin, shovel, etc. Sufficient rain-proof equipment must be prepared and the required equipment must be kept in good condition.

Emergency plan for flood control safety 6 Due to the restriction of land requisition and demolition at present, the project management department of xx section of xx line of China Railway No.9 Bureau Group cannot fully carry out the construction. Now, the emergency plan for flood control of the tunnel project xx 1 under construction by our company is reported to the leaders of the Infrastructure Center. Xx 1 The emergency plan for flood control of tunnel engineering is as follows:

1.

This plan is formulated in order to deal with emergencies caused by special climate and rainstorm and flood this year, make corresponding treatments in an orderly and efficient manner, minimize losses and maintain social stability.

2. Scope of application

This emergency plan is suitable for the xx1tunnel project under construction by the XX line project department. All employees engaged in production of China Railway No.9 Bureau are responsible for the emergency rescue of others, the emergency protection of enterprise property and the safety protection of the existing line of xx Company in the recent special climate, workplace rainstorm and flood. When floods occur in other places, they should undertake the obligation of emergency assistance to people's property.

Step 3 organize

The project department of xx bid section of xx line set up a leading group for flood control and emergency rescue, and the office is located in the operation department of xx bid section of xx line of xx company, which is responsible for the flood control work of the whole construction period. Tunnel ZuoYeDui set up a leading group for tunnel flood control and emergency rescue, which is responsible for the concrete implementation of all tunnel flood control work of xx bid section project department of xx line.

Tunnel operation team leading group for flood prevention and emergency rescue

Group length: xx

Deputy team leader: xx, xx

The first group: xx, xx, xx, xx, xx, xx,

Mainly responsible for the construction of subgrade, bridge and culvert, tunnel;

Group 2: xx, xx, xx, xx, xx, xx, xx.

Mainly responsible for tunnel xx1;

4. Emergency plan

4. 1 adhere to the principle of "prevention first": all employees should establish the awareness of safety first and keep high vigilance at all times. After entering the rainy season, special personnel shall record, listen to and watch the weather forecast at all levels every day, especially the disastrous early warning, and take corresponding measures in time.

4.2 In case of sudden rainstorm and flood disaster, immediately start the following functional personnel and put them into disaster treatment.

4.2. 1 The person in charge of each worksite shall report the situation to the superior and local authorities at the first time, and shall be responsible for directing the field personnel to evacuate to highlands, roofs and other places;

4.2.2 The person in charge of site construction (foreman or foreman) is responsible for maintaining order, counting people and preventing chaos.

4.2.3 Logistic personnel shall provide simple medical care, ensure food hygiene on site, and reserve necessary living and medical supplies.

4.2.4 The on-site technical director is responsible for the storage and rescue of technical data, and is responsible for recording and photographing the flood level and other disasters.

4.2.5 The communication liaison (temporarily appointed by the team leader) listens to the instructions of the team leader, reports the situation to the superior emergency center at the first time, and completes the internal and external communication at the scene.

4.2.6 The site electrician should take the safest measures to cut off the main power supply at the first time.

5 On-site disposal countermeasures

5. 1 immediately organize employees to evacuate to safe areas in an orderly manner, count the number of people by department and report the disaster situation to relevant departments immediately.

5.2 On-site personnel should immediately rescue the injured, cut off the power supply, and save the state property to minimize the loss of state property.

5.3 The leading group shall organize personnel to seriously investigate the property losses, put them on record, and write a written report to the construction unit.

6. Emergency preparedness and measures

6. 1 before construction, all employees engaged in production should be trained in flood control methods, so that the employees on duty can be familiar with the emergency plan for flood control, and ensure that every employee can take the most accurate emergency measures in case of flood to reduce losses.

6.2 Organize relevant personnel to conduct drills when necessary, verify the emergency preparedness and the implementation effect of the plan, and improve the self-defense and self-rescue ability in actual combat.

6.3 Clean and dredge the existing ditches, drainage ditches and spillway within the construction scope, without silting, blocking, leaving no construction hidden danger or blocking the river course, so as to ensure sufficient flood discharge capacity.

6.4 In the construction of tunnel engineering, the prevention, interception and drainage facilities at the top of the hole should be done first, so as to enter the tunnel as soon as possible. After entering the tunnel, do a good job of permanent and temporary protection of the side slope. The earthwork excavation of the open-cut tunnel section shall be carried out in strict accordance with the Work Instruction for Open-cut Tunnel Engineering to ensure the safety of entering the tunnel.

6.5 The initiating explosive device warehouse must be equipped with lightning protection and grounding devices according to regulations to avoid the use and transportation of initiating explosive devices in thunderstorm weather.

6.6 Retaining wall protection of spoil ground shall be constructed in advance according to design requirements.

6.7 Temporary works shall be protected against water and drainage. Pay special attention to the waterproof and drainage of temporary houses, gravel yards and cement depots, steel yards and processing yards, air compressor rooms, substations, initiating explosive devices depots and mechanical parking lots to ensure the safety of personnel, machinery and materials in flood season. The temporary construction access road shall be provided with adequate waterproof and drainage facilities to ensure unimpeded access.

6.8 Carefully check and verify the construction materials and equipment stored in low-lying areas, and transfer them to a higher safe location in advance if necessary.

6.9 In rainy season, construction machinery and personnel should strengthen lightning protection, anti-skid and anti-collapse measures to ensure safe and orderly construction.

6. 10 Do a good job of tunnel waterproof and drainage in strict accordance with the Working Instruction for Waterproof and Drainage of Tunnel Engineering.

6. 1 1 Prepare corresponding rescue equipment, equipment and tools according to this emergency plan to ensure the start of this plan.

6. 12 emergency rescue must obey the unified command and arrangement of the project department.

6. 13 The leading group for flood control and emergency rescue of the tunnel operation team conducted a comprehensive special inspection on the flood control work of the tunnel project in this bid section.

;