Joke Collection Website - Bulletin headlines - Summary of safety inspection activities

Summary of safety inspection activities

Summary is a written material to review and analyze the performance of study, work and life in a certain period of time, which can make us think. Let's write a summary for ourselves. What kind of summary should you have seen? The following are four summaries of the safety inspection activities carefully arranged by me, which are for reference only. Let's take a look. Summary of safety inspection activities 1

In order to quickly implement the spirit of "3.15" railway video teleconference and "3.15" overall production video teleconference, and earnestly implement the requirements of ministries and bureaus, according to the requirements of document No.71, problems were carefully found and rectified from six aspects: traffic safety, passenger safety, freight safety, logistics and non-transportation safety, labor discipline and cadre style, and information safety. The work has been well completed and achieved good results, which are summarized as follows:

1. Strengthen leadership and set up an organization:

In order to make the safety inspection activities be solidly promoted and achieve practical results, the station has set up a safety inspection leading group with the stationmaster, the general branch secretary as the team leader, the deputy stationmaster as the deputy team leader, and the stationmaster on duty and the passenger and cargo responsible person as the team members, so that everything is managed and asked, giving full play to it.

second, define the activities:

first, seriously study the spirit of the "3.15" railway video conference and the "3.15" global production video conference, carefully understand and implement it.

second, it is in accordance with the requirements of No.127 "Notice of taiyuan railway administration and China * * * taiyuan railway administration Committee on Carrying out Safety Inspection Work" of Taitie Safety Supervision Bureau.

thirdly, according to the contents determined in the * * * Notice of Shuozhou Locomotive Depot Committee

on carrying out safety inspection "of Shuozhou Locomotive Depot No.71".

third, make plans and make solid progress:

first, widely publicize and launch. In order to carry out this safety inspection activity well, make the safety inspection deeply rooted in people's hearts, and make it clear to everyone, we have intensified publicity and education by all means of publicity. The station has held many team meetings, station affairs meetings and staff meetings to explain the purpose and significance of the safety inspection activity to employees, and extracted and printed the contents and requirements of the safety inspection activity and typical safety cases, with one copy for each person. At the same time, the use of publicity columns at the station and the replacement of slogans really make employees pay attention to the safety inspection activities.

2. On the basis of publicity, the station has formulated specific measures in accordance with the general requirements of the Railway Bureau and the railway section on carrying out safety inspection activities, combined with the actual situation. At the same time, the off-duty workers are organized to conduct self-examination and reflection every day by using the time of shift handover.

3, comprehensive card control, a pack to the end. In the safety inspection activities, the system of station leaders' teams and teams is implemented, with the stationmaster guaranteeing the freight team and the driving team A, the general branch secretary guaranteeing the driving team B and the shunting team A, the deputy stationmaster guaranteeing the driving team C and the shunting team B, and the driving team D and the shunting team C.. The leaders of the baobao station are fully responsible for the safety inspection activities of the teams and groups, and take part in the reflection meeting of the teams and groups and are responsible for the rectification of the problems found. At the same time, it is mainly responsible for the card control of key personnel and key operations of the team.

4. Set up an account, assign special personnel to be responsible for it, and fill it in carefully. The deputy stationmaster is responsible for filling in the relevant information and account of the safety inspection, and reporting the weekly report and summary on time, so that the documents are complete and the registration is standardized, so as to achieve the standardization and unification of the information account.

5, check and change, and constantly rectify. Track and analyze the problems found out and make thorough rectification. Especially for the problems found by the superior leaders in the inspection work of our station, we formulated measures and rectified them one by one to ensure the safety and order of the station.

fourth, the activity was solid and the effect was obvious.

Through in-depth safety inspection activities, we have achieved good results, which are embodied in the following aspects:

1. The awareness of safety production of cadres and workers in the whole station has been obviously enhanced, the idea of safety first has been deeply rooted in the hearts of the people, and the consciousness of implementing operating standards has been generally improved.

2. The management consciousness and responsibility consciousness of station managers have been obviously improved, the execution has been obviously strengthened, and the field operations have been effectively controlled.

3. The management of the self-management equipment in the station has been strengthened, and the quality of the equipment has been obviously improved.

4. The rules and regulations have been revised, and various management assessment systems have been further improved.

5. The employees' awareness of obeying rules and disciplines is improved, and the problems of two violations are reduced, and the nature is obviously reduced. In short, in the safety inspection activities, while we have made achievements, we should also clearly recognize the problems existing in our safety management and take effective measures to nip them in the bud to ensure the safety and stability of the whole station and the stability of the team. Summary of safety inspection activities 2

In order to conscientiously implement the instructions of the whole country, the whole province and the provincial offices on doing a good job in safety production in flood season and further strengthen the safety production work in XXX expressway during flood season, our company is in accordance with the requirements of the Notice of the Expressway Administration Bureau of the Department of Transportation of XX Province on Carrying out the Safety Inspection and Renovation Activities of Expressway during Flood Season in the whole province. Carry out the inspection and rectification activities of safety production in flood season in XX section of XXX Expressway. The activities are summarized as follows:

1. Attach great importance to and strengthen organizational leadership

The leadership team of the company attaches great importance to safety production in flood season, and set up a leading group for flood season with the general manager as the team leader, the chief engineer as the deputy team leader and the heads of various departments as members, so as to improve the 2xx flood season work plan and clarify the responsibilities of all departments.

second, strengthen the duty in flood season, and strengthen the information submission

The company's leading group in flood season formulated the duty system in flood season, and strictly implemented the 24-hour duty system in flood season combining the leadership with the staff. In order to strengthen the information reporting work, a general duty room was set up in the flood season. The general duty room was set up in the monitoring center to be responsible for the flood season information reporting work, and a communication and coordination mechanism was established with the adjacent road units and the monitoring and settlement center to timely release the flood season early warning and road information.

Third, strengthen the investigation and rectification of hidden dangers and strengthen the supervision of road-related construction

In order to strengthen the safety work in flood season, the mechanical and electrical personnel strengthen the inspection of tunnel facilities one day, the Road Safety Department and the Engineering Department strengthen the inspection before rain, patrol in rain and inspection after rain. During the large-scale inspection and rectification activities, the company cooperated with high-speed traffic police and traffic law enforcement to conduct a large-scale inspection and rectification of the entire road surface, roadbed, bridges, bridges and culverts, tunnels and high slopes to ensure the flood season. Establish a hidden danger rectification account for the investigation of safety hazards, and each department shall specify the time and the responsible person to make serious and thorough rectification according to the regulations. In order to strengthen the supervision of road-related (maintenance) construction, ensure the orderly management and control of the construction site, and strictly abide by the operating rules during the construction process, the company convened high-speed traffic police, traffic law enforcement, road safety department and relevant personnel of the maintenance team to hold a special safety meeting, and clearly and strictly implemented road maintenance operations in accordance with the Safety Operating Rules for Highway Maintenance and related requirements.

IV. Establish coordination mechanism and strengthen joint logistics linkage

The company and XX meteorological department establish information sharing and bad weather notification mechanism to obtain bad weather information in time and strengthen road inspection and early warning in advance. Strengthen the joint logistics linkage with traffic law enforcement agencies and public security traffic police departments, establish the sharing and intercommunication mechanism of inspection information in flood season, and timely deal with potential safety hazards in flood season.

5. Improve the geological disaster emergency plan, and establish an emergency team to strengthen emergency treatment

The company refines and improves the emergency plan for geological disasters such as landslides and mudslides in flood season. Established an emergency rescue team with the joint maintenance team of the company's management and protection brigade. In order to train the team's emergency response ability, the company cooperated with the public security traffic police department, traffic law enforcement agencies, public security fire control and local health departments to conduct an emergency drill for landslide geological disasters. Through this drill, the team's emergency response ability was effectively exercised, and the joint logistics linkage between various departments and traffic police, traffic law enforcement, fire control and health departments was strengthened, providing a strong guarantee for flood season safety.

through this major inspection and rectification activity, the company found out its shortcomings, strengthened communication and coordination with local governments, and strengthened the joint logistics linkage between various departments and traffic police and traffic law enforcement, which accumulated valuable experience for the safety production work in the flood season next year. Summary of safety inspection activities 3

According to the spirit of the emergency teleconference of the whole railway on July 24 and the teleconference of taiyuan railway administration on July 25, the lessons of the rear-end collision accident of EMU on "July 23" Yong-Wen line were deeply learned. According to the railway safety supervision [2xx] No.227, Notice of Railway Administration and Party Committee of Railway Administration on Carrying out Safety Inspection Activities to Ensure the Safety and Stability of Transportation, Notice of Taitieren [2xx] No.228 on Doing a Good Job in Guaranteeing Cadres during Safety Inspection, and the spirit of Taijian [2xx] No.14, The work of our supervision station this week is summarized as follows:

1. Strengthen the organization and leadership, and make overall arrangements

After receiving the notice of the activity, our supervision station immediately organized the supervision engineers of various worksites to hold an emergency meeting on production safety on July 28th, which conveyed the requirements of superiors in time, and required all supervision engineers to deeply understand the significance and purpose of the activity and fully realize the importance of the activity. Adhere to the implementation of the system of safety production and various preventive measures, and issue the Notice on Quickly Carrying out Safety Production Inspection Activities. At the same time, specific arrangements and arrangements have been made in terms of the time, requirements, content and form of the activities. Focusing on the inspection focus of the notice of the inspection activities, there are planned arrangements, inspection contents, summary and rectification, and the director and deputy directors patrol to strengthen the implementation of on-site self-inspection, self-correction and rectification, thus laying a solid and meticulous foundation for the activities.

2. Carry out in-depth self-inspection and rectification, and solidly promote activities with practical actions

Our supervision station has established a special account for safety inspection, found one problem, rectified one, and sold one, and made detailed self-inspection records and problem registration. There are rectification requirements, responsible subjects and those who urge the rectification to be implemented. This week, the director visited the construction site twice and the deputy director visited the construction site four times. Through the process control of the acceptance of each working procedure, the side-by-side inspection of concealed works and the routine inspection, X general problems and X major problems were found on site, and all of them have been rectified according to the specification requirements after being urged by the on-site supervision engineer. In combination with the actual situation, our supervision station conducted a detailed investigation against the documents and summarized the activities of safety inspection. Since the launch of this safety inspection activity, our supervision station has actively responded to the requirements of Taixing Company's safety inspection activity, closely combined with the actual situation of the project construction site, fully implemented the spirit of the safety inspection activity, found a large number of problems in the inspection process, eliminated a large number of quality and safety hazards, greatly improved the quality and safety awareness of all contractors, and improved the safety production system. The loopholes and deficiencies in safety production management have been made up, the common quality and safety problems have been thoroughly rectified, the field management level has been further improved, the safety and quality of the project have been further guaranteed, and a good start has been made.

Third, strengthen process control, implement safety in production

Strengthen process control, identify and eliminate hidden dangers of safety and quality in the bud, and put an end to quality and safety accidents. In future supervision work, we should take this safety inspection as an opportunity to establish a long-term mechanism, put the safety inspection problems into storage in time, and issue them to every supervisor, which will be used as the basis for usual on-site control together with specifications and design documents to avoid the recurrence of similar problems. We should combine the relevant requirements of safety inspection, focus on the basic framework of standardization of management system, personnel allocation, site management and process control, focus on site operation control, focus on standardizing materials entering the site, strictly reviewing personnel, strengthening process inspection, on-site supervision and site management, strictly perform supervision duties, and focus on strengthening supervision of project quality, construction safety and inspection and valuation. Effective monitoring of the whole construction process is strengthened through the effective operation of work processes such as acceptance of incoming materials, acceptance of concealed works, acceptance of inspection lot, witness inspection, parallel inspection, and standing by, and hidden dangers of engineering quality and safety are discovered and eliminated in the bud; And actively carry out institutionalized professional ethics education within the supervision organization, effectively improve the supervision personnel's implementation ability, professional and technical ability, on-site management ability, pioneering and innovative ability and anti-corrosion ability, further improve the level of supervision work and further improve the effectiveness of supervision work. This laid a good foundation for the activity to be carried out in a solid and meticulous manner. Summary of Safety Inspection Activities 4

Winter construction is coming. In order to further strengthen the safety management of winter construction and prevent accidents, according to the spirit of the document Notice on Carrying out Safety Inspection in Winter issued by Ju 'an [2xx] No.94, the leaders of our department attached great importance to it and immediately organized relevant personnel to carry out the safety inspection in winter. Adhere to the principle of "safety first, prevention first, comprehensive treatment", focus on hidden danger management, do a good job in hidden danger investigation, and effectively curb the occurrence of various accidents. Through the development of this activity, the safety production work of Xianju Project Department further consolidated the foundation, improved the safety production awareness of construction personnel, completely eliminated the potential safety hazards existing in the safety production work, and created a good safety production atmosphere. This activity mainly focused on safety technical measures, traffic safety, fire safety and special equipment safety. The activities of the project department are summarized as follows:

1. Strengthen leadership and organize meticulously

The leaders of the project department attached great importance to this activity, made careful arrangements and paid close attention to implementation according to the guiding opinions of the company to carry out the winter safety inspection activities and the requirements of relevant plans, so that the activities were seriously carried out. At the same time, in order to further strengthen the winter production safety inspection, the project department set up a special work leading group for the winter production safety inspection in time, with Zheng Chunlei, the project manager, Zhang Jianwei and Xu Ning, the deputy project managers, and the team members composed of the heads of various departments and the team leaders on the construction site, so as to ensure that the responsibility lies with the people, strengthen their own safety management, and do a good job in the construction site safety, constantly improve the safety awareness of construction personnel and effectively prevent the occurrence of safety accidents.

2. Implement safety work and strengthen inspection and rectification

According to the requirements of company documents and the characteristics of winter construction, the project department should prepare early and start work early and take effective measures. Take "fire prevention, explosion prevention, anti-skid, anti-freezing, anti-collapse, anti-poisoning, anti-falling from high altitude and anti-traffic accidents" as the key points of safety control in winter construction. Focus on safety technical measures, traffic safety, fire safety and special equipment safety, and include random inspection contents. To verify the implementation of the special rectification measures for traffic, fire protection and dangerous chemicals carried out before, review the effect of rectification work, and carry out self-improvement at the same time