Letter of Guarantee for Safe and Civilized Construction

In life, everyone gradually realizes the importance of the letter of guarantee, which is conducive to the guarantor’s self-examination, self-restraint, and self-supervision. In order to save you the headache of writing a guarantee letter, the following is a safe and civilized construction guarantee letter that I have carefully compiled for reference only. I hope it can help everyone.

Safe and Civilized Construction Guarantee 1

In order to successfully complete the construction tasks of the sixth bid section of the second batch of the 20xx school building safety project (Fengtai No. 8 Middle School), we hereby guarantee the following:

Article 1 The construction site should be fenced neatly, the streets and important parts must be set up according to the requirements of the construction unit, and safety and beauty must be ensured. The content of the construction slogans must be approved by the construction unit; the site layout should be reasonable and tidy, and there should be no weeds. , stagnant water, and odor, the roads within the site must be kept clear; all materials should be stacked neatly, construction waste must be stacked at designated points, and cleared away in a timely manner. It is strictly prohibited to pile materials and waste outside the construction site.

Article 2 The layout and process arrangements of the construction site should take into account noise and lighting control, and strictly follow the relevant regulations of Beijing to avoid disturbing the residents; the construction site must be equipped with special toilets and have dedicated personnel to manage them. It is strictly prohibited to urinate and defecate at will. ; Domestic, production and construction wastewater must not be discharged into the school's sewers if it has not been properly treated; trees and green spaces on the campus must not be destroyed; the earth moving process must be strictly followed and must not be spilled inside or outside the school. At the same time, there should be measures to avoid dust. measure.

Article 3 Non-local construction workers must apply for relevant certificates, and non-construction unit personnel are prohibited from staying overnight at the construction site. It is prohibited to gather people to play cards, drink and cause trouble, and circulate obscene materials at the construction site; construction workers are prohibited from walking around in non-construction areas. Conflicts with students, faculty and staff are strictly prohibited.

Article 4 Construction vehicles should pay attention to campus traffic safety when entering and leaving Fengtai No. 8 Middle School and must drive slowly. Large machinery entering and exiting the site should negotiate with the construction unit in advance to avoid campus traffic peak hours and when road closures are required for construction. , must obtain the consent of the construction unit and set up obvious warning signs at the intersection.

Article 5 The temporary use of electricity at the construction site must comply with the "Technical Specifications for Safety of Temporary Use of Electricity at the Construction Site". Fixed distribution boxes should be equipped with fences and have obvious safety warning signs. Non-professionals are strictly prohibited from connecting and removing wires. , to prevent electric shock accidents, it is strictly prohibited to use electric stoves and other electrical equipment that hinders on-site safety.

Article 6 On-site fire hydrants and other fire-fighting equipment are fully equipped and reasonably located, and there should be obvious warning signs. Misappropriation is strictly prohibited to ensure smooth fire-fighting roads; smoking, highly toxic, flammable and explosive items are strictly prohibited at the construction site And construction fires must be managed by dedicated personnel.

Article 7 On-site construction workers must wear uniforms and badges, and idle personnel are strictly prohibited from entering the construction site; safety helmets must be worn when entering the construction site (red is the owner’s exclusive color), and safety belts must be fastened when working at heights. It is strictly prohibited for workers to work while drunk, to climb scaffolding, and to throw objects downwards when working at heights.

Article 8 The erection of scaffolding, foundation pit support and installation of large machinery such as tower cranes and elevators must have a construction plan approved by the superior safety department, certificates, inspection certificates and safety protection for various construction machinery. The equipment is complete to prevent any construction safety accidents such as falling objects from height and earth collapse.

Article 9 The workers’ canteen must be clean and tidy, free of flies and rats, and the operators must have complete certificates. The relevant regulations on food hygiene and safety must be conscientiously implemented to prevent workers from food poisoning. The dormitories of construction workers must be clean and tidy, and random pulling is strictly prohibited. Wires, heating in winter to prevent workers from gas poisoning.

Article 10 The construction unit should have on-site management personnel specifically responsible for safe and civilized construction, conduct regular inspections, and promptly rectify problems if they are found; they must actively cooperate with other issues raised by the construction unit related to safety and civilized construction. , perform it conscientiously.

If there is any violation of the above terms, our unit is willing to accept any punishment imposed by the Engineering Project Department on the unit and bear all civil or criminal liabilities arising therefrom.

Guarantee unit:

Person in charge of the unit (signature):

Date: Safe and civilized construction guarantee 2

Construction project safety and The guarantee of construction quality is inseparable from civilized construction. In order to achieve civilized construction, our company has formulated the following measures in accordance with the relevant regulations of the country and the relevant regulations of Liuzhou, and ensures that construction is carried out according to the formulated measures.

1. Civilized construction management measures

1. Conscientiously implement the spirit of the notice issued by xx No. xx "xx City Construction Project Site Management Regulations" (Trial) and the current "Construction Safety Inspection Standards".

2. The construction site shall be closed with dense mesh. Do a good job in protecting underground pipelines at the construction site, implement civilized construction, and prevent major safety accidents.

3. On-site construction must achieve "two connections, three no's, and four musts". The two connections refer to the smooth lanes and sidewalks at the construction site, and the entrance and exit of the factory area must be kept clear at the construction site. Three no-nos means that there are no accidents that damage underground pipelines at the construction site, the construction site and roads are smooth and there is no accumulation of water, and there is no "yellow, gray, or white dragon" pollution on the construction site. Four musts refer to the strict separation of construction and non-construction areas. Specific measures include hanging signs of construction areas and non-construction areas. The isolation method can be a complete set of isolation fences. Construction workers must hold certificates and receive pre-job education. Construction materials must be stacked neatly. , for measurement and quality assurance, the on-site production and living environment must be clean and civilized and meet sanitary conditions.

4. At the entrance of the construction site, set up a corporate logo gatehouse and hang an eye-catching "one picture, three certificates and five cards" (construction plan, planning, construction, safety license, project overview, list of management personnel and supervision Telephone, fire protection, production safety, civilized construction signs).

5. Various materials are stacked according to specifications, and various mechanical equipment, components, and non-standard products are clearly marked. Sand and gravel are piled up in a timely manner using loaders, steel bars are classified and stacked neatly according to specifications and varieties, various scattered materials are organized and concentrated in a timely manner, temporarily unused equipment, facilities and materials are returned to the warehouse for safekeeping in a timely manner, and turnover materials after construction are cleaned and stacked in a timely manner .

6. Hang mortar and concrete signs at the mixing station, and hang operating procedure signs where there is equipment.

7. Clean up the work site promptly before leaving get off work every day. Vehicles and carriages transporting residual soil and construction waste must be properly sealed to prevent road pollution. The dumping location shall be in accordance with the requirements of the supervision engineer's notice, and dumping and dumping indiscriminately is strictly prohibited.

8. The erection of temporary facilities, mechanical layout, stacking of construction materials, laying of water and electricity lines, etc. must be carried out strictly in accordance with the general layout. Temporary roads and on-site drainage work should be done promptly, and the site should always be kept neat and clean. , not muddy. Temporarily use electrical wires for aisle protection, and it is strictly prohibited to pull or connect objects indiscriminately or hang objects on the wires.

9. Arrange the construction work time reasonably according to the requirements of the schedule and try to avoid night construction. If the process requires continuous construction, with the consent of Party A, try to reduce the noise caused by the construction machinery and proceed in advance. Do a good job in explaining and guiding surrounding residents.

10. It is strictly forbidden to drink, make trouble, make loud noises, fights and other behaviors at the construction site. Once it occurs, it will be punished strictly in accordance with the construction site public security management regulations.

11. Flush toilets should be set up at the construction site, and all construction workers are not allowed to urinate or defecate anywhere.

12. People are often sent to clean and sprinkle water on the pedestrian lanes on the construction site to reduce dust pollution. An appropriate number of garbage bins should be uniformly arranged at the construction site, and garbage should be cleaned up in a timely manner and transported to designated locations for burial or incineration.

2. On-site security measures

1. Improve the organizational structure

Select personnel with good political quality, professional skills, high policy level and strong work ability. Form an on-site security department. There are ministers, deputy ministers, public security, fire protection, and traffic safety professionals who are fully responsible for on-site security work. The project department and subcontracting units of the second-level company have set up corresponding institutions and equipped with security personnel to form a systematic management.

2. Establish and improve various rules and regulations

① Regulations on the handling, use and management of entry and exit documents.

②Admission education system.

③Public security, fire safety, and traffic safety management regulations.

④ Management regulations on the use of fire and electricity such as electric welding at construction sites.

⑤ Regulations on guarding and patrolling of construction sites, reservoir areas and key locations.

⑥ Management regulations on theft prevention of critical and valuable materials and the accounting department.

⑦Regulations on bringing items to the venue.

⑧Strictly control the entry regulations for flammable and explosive items.

⑨ The protection of finished products shall implement the provisions of zoning, classification, fire prevention, theft prevention and vandalism prevention. Implement the regulations for the review and registration of "operation certificates" for electric and gas welders.

⑩ Management regulations for applying for a "fire license".

3. Guard system

① Set up a solid metal fence around the construction site according to standards.

② The construction site and the entrance and exit of the reservoir area will be strictly guarded. The financial room is equipped with anti-theft doors, windows and alarm devices.

③ As the project progresses, guard patrols will adjust sentry positions and care targets to increase guard strength.

④ All employees enter and leave the site with their credentials, and the "access passes" are produced and issued by the general contracting department.

⑤ When each unit enters the site and before the start of the phased project, entrance education is generally carried out to hand over the system, regulations and requirements to the masses. Relevant local departments, Party A’s security and other departments are invited to participate in the education.

⑥ Careful inspections should be carried out during major festivals and major events, and plans and preventive measures should be put forward.

4. Regular inspections and elimination of hidden dangers.

5. Handle fights, thefts, disputes and other public security issues in a timely manner.

① If a case is constituted, report it to the superior business or the local public security and fire department for investigation and handling in a timely manner.

②In the event of a fight or dispute, distinguish primary and secondary responsibilities and handle them separately. The handling must be realistic, fair and reasonable, and a final ruling document must be signed and approved by both parties.

③If general theft occurs, the unit and responsible person will be punished as appropriate.

3. Environmental protection and health management

1. Garbage at the construction site must be cleared away in time, and appropriate amounts of water should be sprinkled to reduce dust during removal.

2. Construction roads should be laid out at the construction site in conjunction with the permanent roads in the design. The road base course should be implemented in accordance with the design requirements. Reef residue, fine stone asphalt or concrete can be used as the surface layer to reduce road dust. At the same time, it should be maintained at all times. Repair pavement damaged by construction to prevent floating soil.

3. Fine-grained bulk materials that are easy to fly should be stored in the warehouse as much as possible. If they are stored in the open air, they should be tightly covered. During transportation and unloading, prevent them from being scattered and flying to reduce dust.

4. Transport vehicles must not overload. The maximum amount of engineering earth they carry must not exceed 50 cm above the upper edge of the vehicle trough, and the edge must not be 10 cm lower than the upper edge of the vehicle trough. Construction debris or other bulk materials must not be loaded. Exceed the upper edge of the groove.

5. Special personnel should be assigned to manage vehicle and material transportation at the construction site to prevent earthwork from being scattered. Before the transport vehicle leaves the site, the earthwork must be patted down, and the vehicle troughs and wheels must be washed clean to prevent soil from being brought onto the road and left behind.

6. A watering and dust reduction system should be formulated at the construction site, equipped with watering equipment, and designated personnel responsible for sprinkling water and dust on site and cleaning up floating soil in a timely manner.

7. The mixing equipment at the construction site must be equipped with a closed enclosure and a spray dust removal device.

IV. Measures to prevent water pollution at construction sites

1. Where mixing operations are carried out at the construction site, sedimentation tanks must be set up at the front desk of the mixer and the cleaning area of ??the transport vehicle. The discharged wastewater must be discharged into the sedimentation tank and undergo secondary sedimentation before it can be discharged into municipal sewage pipelines or recycled for sprinkling and dust reduction. Untreated slurry water is strictly prohibited from being discharged directly into the factory drainage facilities and rivers.

2. It is prohibited to use toxic and hazardous waste as earthwork backfill to avoid contaminating groundwater and the environment.

5. Environmental sanitation management measures at the construction site

The environmental sanitation management work at the construction site involves a wide range of areas. If it is not done well, it will have a great impact. It must be strictly in accordance with the company's relevant environmental sanitation policies. Management regulations are implemented. We must gradually achieve scientific and standardized management. No epidemic or other economic losses may be caused due to poor management.

1. The construction site must be neat and clean, without stagnant water, and vehicles entering and exiting the site must not scatter or entrain sediment.

2. If notifiable infectious diseases and food poisoning occur at the construction site, they must be reported to the health and epidemic prevention and administrative departments in a timely manner, and measures must be taken to prevent the spread of infectious diseases.

3. A drinking water heater or electric water heater should be installed at the construction site to ensure the supply of boiling water, and should be managed by dedicated personnel and cleaned regularly to maintain hygiene.

4. Offices, dormitories, kitchens, drinking water stations, smoking rooms, garbage stations, toilets, etc. must have uniformly produced signs.

5. Public buildings on the construction site must be clean, tidy and beautiful.

6. The dormitory must have opening windows to ensure indoor air circulation. In summer, there should be anti-mosquito equipment and electric fans.

7. The identity cards of the construction workers must be hung on the bedside of the dormitory. The upper and lower floors of the bed must be clean and sanitary. Storage rooms (cabinets), tableware, toiletries cabinets, shoe racks, etc. should be installed indoors.

8. Garbage in living areas must be concentrated in designated locations and cleaned up in a timely manner. Closed garbage bins should be used if conditions permit.

9. Scattered kitchens shall not be randomly set up at the construction site. The kitchens shall be designed and managed uniformly by the general contractor. Clean fuel must be used.

10. The kitchen must have a health license. Cooks must undergo a health examination every year. They can only work after holding a health certificate and health knowledge training. Anyone suffering from other diseases that hinder food hygiene , are not allowed to come into contact with the production, sale and food washing of directly imported food.

6. Measures to prevent noise, pollution and nuisance at construction sites

1. The construction site should comply with the noise reduction limits stipulated in the "Noise Limits at the Boundary of Construction Sites" and formulate and reduce noise levels. Noise system.

2. Promote civilized construction, establish and improve a management system to control man-made noise, minimize man-made loud noise, and enhance the awareness of all construction workers to prevent noise and disturb residents.

3. Anyone carrying out noise operations in densely populated areas must strictly control the operation time.

4. Low-noise equipment should be selected and reasonably arranged, and measures such as noise reduction, sound insulation and shock absorption should be taken to minimize equipment noise pollution generated during the construction process.

Guarantor: XXX

Guarantee for safe and civilized construction on XX, XX, XXXX 3

Every project construction unit undertakes various projects of Guangbai Co., Ltd. or When carrying out project construction within the scope of the company, the construction unit and the contracting unit promise to the property management center of Guangbai Co., Ltd. to ensure that they strictly abide by the following regulations:

1. Obey the management department and on-site management personnel management. Before construction, complete the relevant project application, approval and decoration admission procedures, and post the "Construction Permit" in a conspicuous place on the construction site. Construction workers and work management personnel must wear Guangbai's "Temporary Access Badge" when entering the construction site. Violators will have their badges confiscated and asked to leave the construction site. Construction tools and equipment should comply with the safety standards promulgated by relevant national departments and be kept in good condition before entering the site.

2. Pay close attention to fire prevention and electricity safety work.

The construction site must be equipped with fire-fighting equipment in accordance with regulations; before any hot work such as gas, electric welding and heating, go to the property management department to apply for a "fire certificate" according to regulations and be equipped with sufficient fire-fighting equipment and designated supervisors before construction can begin. Violators will be fined 20xx Yuan/time; The connection of electricity and water for construction must be carried out under the guidance of the management personnel of Guangbai Property Department. Wires must not be connected indiscriminately. Violators will be deducted a penalty of 300 Yuan/case; Smoking, burning debris and debris are strictly prohibited at the construction site. If you light a fire and cook cooked food, you will be fined 100 yuan per person. Decoration materials should be selected in accordance with the regulations of the municipal or district fire department. When the materials or finished products enter the site, a copy of the invoice for purchasing flame-retardant materials should be submitted to the safety supervisor for review. Failure to do so will Materials or finished products that meet the requirements are not allowed to enter the site and will bear the responsibility for rework and delay in construction.

3. Before any concealed project is closed during construction, it must be inspected and approved by the management department and management personnel before construction can continue; when the drawings or plans are modified, they must be reported in writing to the property management department and approved. Construction can be started, otherwise the illegal works must be stopped and the illegal parts restored to their original appearance. Therefore, the necessary costs shall be paid by the construction unit.

4. Strictly abide by the relevant national "family planning" management regulations. The construction unit must strengthen the management and education of family planning for employees, not recruit "three noes" personnel and personnel who violate "family planning" regulations to work on site, and bear responsibility for violations of family planning work.

5. During construction in shopping malls, operations that produce large amounts of dust, loud noise, or produce pungent odors are not allowed during business hours. If the above operations must be carried out due to technical requirements, you must apply to the operation and management department in advance to arrange construction after closing at night.

6. Regularly clean up residual mud, waste materials, garbage, sewage, etc., keep the construction site environment clean, do not urinate or urinate anywhere, and dump sewage, dyes, garbage, and sundries indiscriminately. Violators will be fined 100 yuan per time , and must be responsible for cleaning and repair work. If the sewer is clogged due to the above reasons, we will be responsible for all cleaning costs.

7. Take good care of the public facilities in the building. When transporting materials and removing silt and garbage, public facilities such as freight elevators and stairs must not be damaged. If damaged, compensation will be paid at the price. All decoration waste and construction materials must be placed in a safe place and should not be placed at high places to avoid falling from high places and endangering passers-by.

8. Bear full responsibility for casualties and fire accidents caused by violations of safe operating procedures and tool and equipment accidents.

9. After the construction is completed, all windows, doors, water pipes and temporary power switches must be closed before leaving.

This guarantee will take effect from the implementation of the project and will naturally expire after the project is completed and accepted. If you fail to return this guarantee letter in time, your company's construction project in Guangbai will be suspended immediately.

Project construction unit: (seal) Project contracting department: (seal)

Person in charge: Person in charge:

Year, month, day, year, month, day safety Civilized Construction Guarantee 4

In order to further implement the "Safety Production Law", "Construction Project Safety Production Management Regulations" and other laws, regulations and procedures to ensure the construction and production safety at the project site, I, as the first safety of the project The person responsible shall bear full responsibility for safety work and hereby solemnly guarantee the following:

1. Strictly abide by national laws and regulations, adhere to the safety production policy of "safety first, prevention first, comprehensive management", Effectively implement the safety production responsibility system for personnel at all levels and strive to achieve controllable, under-control and controllable safety production.

2. Establish and improve the production safety assurance system and supervision system, improve the production safety command system, improve the safety management and assessment system, formulate key work requirements and measures to achieve annual safety production goals and track and inspect the implementation .

3. Carefully carry out risk point analysis and pre-control, vigorously carry out standardized operations, scientifically analyze the safety status of the project site, identify weak links and accident hazards, and take effective preventive measures in a timely manner.

4. Ensure the full investment of funds required for safe production, focus on ensuring the extraction and use of funds required for anti-accident measures and safety technical labor protection measures plans ("two measures" plan), and establish safe production The reward fund ensures the withdrawal and use of fees required for safe rewards.

5. In accordance with the "Construction Project Safety Production Management Regulations" and other regulations and the requirements of relevant industry safety standards and specifications, formulate construction plans and preventive measures, implement effective protection of dangerous parts of the construction site, and prevent illegal command and To prevent illegal operations, ensure that all parts and links of the construction site meet safety requirements.

6. Regularly organize and convene regular safety work meetings to analyze the shortcomings and problems existing in safety work, and formulate corresponding rectification measures and management plans; regularly organize internal safety inspections, and conduct inspections on superior units, owners, and Problems discovered during supervision units and internal inspections shall be promptly organized and rectified.

7. Regularly organize employees to participate in safety production education and training, improve the safety awareness of employees, ensure that employees are familiar with the rules and regulations on production safety and safe operating procedures, and master the safe operation skills of their positions.

8. Formulate emergency response plans for safety accidents such as major casualties and equipment damage, establish a systematic, hierarchical, consistent, clear division of labor, and mutually coordinated safety accident emergency response system, and organize its implementation.

9. In the investigation and handling of serious accidents, the principle of "four no-misses" should be strictly implemented.

For serious or typical accidents, we should promptly understand the accident situation, hold a special accident analysis meeting, propose measures to prevent recurrence of accidents, and implement them conscientiously.

10. Strengthen the construction of corporate safety culture, closely focus on the company's safe production situation, carry out ideological and political work, and use various vivid and effective forms to educate employees on safety thinking, professionalism, and compliance with regulations and disciplines, etc. Enable employees to establish a strong "safety first" mentality.

Guarantee unit (official seal):

Signature of the first safety responsible person:

Signatures of other members of the leadership team:

Guarantee time: Year, month and day

Guarantee and approval unit (official seal):

Signature of the first safety responsible person:

Approval time: Year, month and day Safe and civilized construction guarantee letter 5

Project name: __

General contractor: (hereinafter referred to as Party A)

Construction unit: (hereinafter referred to as Party B)

Project location: _____________

In order to implement safety management measures and ensure the safe and orderly implementation of the project, Party B makes the following commitments during the construction period of the project:

(1) Before starting construction, Party B must Affiliated personnel shall conduct safety education on safety precautions and measures, and no personnel without safety education shall be allowed to enter the workplace.

(2) Educate your own construction personnel to strictly abide by Party A’s safety and security rules and regulations and various construction process specifications, and consciously obey the on-site safety management work of Party A’s project management person in charge and security personnel.

(3) Strictly abide by the safety production rules and regulations, consciously accept the safety supervision, management and guidance of Party A's unit, and do a good job in safe and civilized construction operations.

(4) All construction personnel entering and exiting the site must wear temporary access passes issued by Party A’s security department and accept supervision and inspection by Party A’s management personnel.

(5) Implement the construction time plan. If construction occurs at unplanned times (Party A’s non-normal working hours), you should apply for approval in advance to the person in charge of the project of Party A and then report to Party A’s Security Department for approval. batch filing. Unless approved under special circumstances, all construction workers will leave the site before 19:00 every day.

(6) Do not engage in any form of commercial activities at the construction site.

(7) Consciously protect the property on the construction site as well as fire protection, electrical appliances, networks, public buildings, decoration and other equipment and facilities intact.

(8) With the consent of Party A and laid in accordance with relevant safety regulations, the construction equipment shall be connected to electricity, water and fire, and shall be equipped with leakage protection, fire protection and other safety facilities that must be prevented in accordance with the requirements of the regulations. , Don’t pull wires without permission.

(9) For complex and dangerous engineering projects, separate safety technical measures should be formulated and implemented after being reviewed and qualified by Party A’s unit.

(10) Do not arrange for unlicensed personnel who have not been trained and assessed by relevant departments to engage in special types of work.

(11) When working at heights, safety protection must be provided below or on the working platform, and special personnel must be supervised. Personnel must wear seat belts and safety helmets correctly, and working scaffolds or ladders must be safe and reliable and have anti-tipping measures. (12) Keep the construction site clean, do not pile construction debris everywhere, and properly place flammable materials for construction.

(13) Do not make loud noises, noises, heckles, fights, etc. at the construction site.

(14) Do not smoke, drink alcohol, gamble or engage in uncivilized behavior that affects others at the construction site.

(15) Not staying overnight at the construction site, if there are special circumstances, must be approved by Party A.

(16) If there is a safety accident caused by our fault, we will bear all the consequences.

(17) If the above commitments are violated, we agree to deduct the relevant expenses incurred from the final accounts of the project.

Unit name:

Safe and civilized construction guarantee letter 6 on July 14, In order to carry out civilized construction on site, be civilized and orderly during the construction process, and establish a good image of the Metallurgical Construction Department of the basement and 3~4# building projects in the first phase, we hereby make the following guarantees to the construction company:

1. Ensure compliance with and implementation of the relevant provisions of the "Construction Safety Rating Standards", the "Guangxi Zhuang Autonomous Region Construction Engineering Construction Safety and Civilized Site Selection Law" and the "Guangxi Zhuang Autonomous Region Metallurgical Construction Company Site Civilized Construction Management Law".

2. Ensure that sufficient manpower, financial and material resources are invested in civilized construction work, and meet the requirements of the civilized construction inspection score sheet (and attached table), in which the total score of each project is guaranteed to be more than 40 points .

3. Appoint comrades as the person in charge of civilized construction to ensure that civilized construction meets standards and strive for excellence.

4. The project department shall inspect the civilized construction work on site at least once a week and the engineering company shall conduct inspections at least once a month. During the inspection, the "Construction Project Construction Management Equalization Form" shall be carefully filled out. Each inspection must be recorded, divided equally, and have a person responsible for rectification and time requirements for rectification.

5. Accept inspections from the construction company and relevant superior departments at any time, and make serious and timely rectifications of problems discovered during inspections.

6. Actively do a good job in welcoming the inspection. Our unit must actively and conscientiously make all preparations for the inspection and evaluation of the superior construction administrative department to ensure that the reputation of the construction company is not damaged.

7. For construction sites located on the main streets and city entrance and exit sections, build a 2.5-meter-high beautiful wall and write the name of the construction site and slogans to establish a good image of the construction company.

8. Accept the supervision and management of relevant departments and law enforcement agencies of the construction company.

9. According to the regulations of the construction company, pay the civilized construction guarantee deposit.

The above guarantee is a commitment to civilized construction at the construction site. During the construction process, if any violation of regulations is violated, the original construction company will be punished in accordance with relevant regulations and bear all financial responsibilities.

The guarantee letter shall be made in triplicate, with one copy each held by the construction technology department, engineering company and project department of the construction company.

Construction unit: (Official seal)

Construction unit manager:

Project leader:

Year, month, day safe and civilized construction guarantee letter 7

1. Actively participate in publicity and education activities on production safety and civilized construction, consciously implement and actively participate in publicity and education activities on production safety and civilized construction, and implement the policy of “safety first, prevention first”.

"Safety first, prevention first" policy.

2. Study seriously and strictly implement the laws, regulations, and systems of safety production. The laws, regulations, systems, and full technical disclosure require everyone to be able to correctly use personal safety full technical disclosure, and require everyone to be able to correctly use personal safety and personal protective equipment

Protective equipment.

3. Comply with the safety production responsibility system, safety operating procedures, safety production management system, comply with the safety production responsibility system, safety operating procedures, and maintain the site. All safety fire protection facilities and safety fire protection signs and signs at the safety maintenance site shall not be dismantled or misappropriated without authorization.

Unauthorized dismantling or misappropriation.

Misappropriation

4. Personnel working in special types of work must hold a certificate to work and abide by the operating regulations of this position. Personnel working in special types of work must hold a certificate to work.

5. Strictly implement fire safety regulations, strictly implement safety fire regulations, strictly implement safe electricity and fire systems, strictly implement safe electricity and fire systems, and strictly implement safe electricity and do not use fire-fighting equipment at will. .

Do not use fire-fighting equipment arbitrarily.

Fire-fighting equipment

6. Colleagues work together, help each other, and supervise each other to achieve "three no injuries." Colleagues should unite and cooperate, help each other, supervise each other, and achieve "(Don't hurt yourself, don't hurt others, and don't be hurt by others).

"Harm" Don't hurt yourself, don't hurt others, and don't be hurt by others. )

7. Comply with rules and disciplines, have the right to stop others from commanding, operating in violation of regulations, refuse to violate rules, comply with rules and disciplines, and have the right to stop others from commanding, operating in violation of regulations, and ordering in accordance with regulations.

Chapter command.

8. Do a good job in sanitation and food hygiene at the construction site, living area, and dormitories, and prevent diseases and food poisoning at the construction site, living areas, and dormitories.

Illness and food poisoning.

9. Report any potential safety hazards in a timely manner. In case of danger, you can evacuate the scene or take decisive and effective measures.

Effective measures.

10. Be realistic and put forward reasonable suggestions that are conducive to safe and civilized construction.

The above ten items are guaranteed to be complied with and implemented

Unit: Date: Safety and Civilized Construction Guarantee 8

1. Actively participate in publicity and education activities on safe production and civilized construction, and consciously Implement the policy of "safety first, prevention first".

2. Study carefully and strictly implement the laws, regulations, systems and safety technical briefings on production safety, requiring everyone to be able to use personal safety protective equipment correctly.

3. Comply with the safety production responsibility system, safety operating procedures, and safety production management systems, obey safety instructions, and maintain all safety fire-fighting facilities and safety signs and signs on site. No unauthorized modification or misappropriation is allowed.

4. Personnel working in special types of work must hold a certificate to work and abide by the operating specifications of this position.

5. Strictly implement fire safety regulations, strictly implement safe electricity and fire systems, and do not use fire-fighting equipment at will.

6. Colleagues should unite and cooperate, help each other, supervise each other, and achieve "three no harms" (do not harm yourself, do not harm others, and do not be harmed by others).

7. Observe rules and disciplines and have the right to stop others from giving orders, operating in violation of regulations, and refusing orders that violate regulations.

8. Maintain good hygiene and food hygiene at the construction site, living areas, and dormitories to prevent diseases and food poisoning.

9. Report potential safety hazards in a timely manner and evacuate the scene or take decisive and effective measures in case of danger.

10. Be realistic and put forward reasonable suggestions that are conducive to safe and civilized construction.