Management measures for safe and civilized construction of decoration engineering?

The management method of safe and civilized construction of decoration engineering is very important. The formulation of the method is based on the actual situation and combined with professional knowledge, and every detail is the key. Zhong Da Consulting will introduce you to the management methods of safe and civilized construction of decoration engineering.

1.

Standardize the requirements of on-site safe and civilized construction and define the technical standards of on-site safe and civilized construction.

2. Scope of application and compilation basis

Applicable to the safety and civilized construction management within the decoration construction scope of the general subcontractors of the company.

This manual is compiled according to the Administrative Measures for Interior Decoration of Residential Buildings and the Administrative Measures for Fire Protection of Building Decoration in Chongqing.

3. Civilized construction management

3. 1 construction site image

3. At the entrance of1.1,the bulletin board of the construction site and the bulletin board of the workstation shall be set up. The bulletin board should be rectangular, with the recommended size of 900mm× 1200mm, supported by steel pipes and angle steel, or embedded in the wall.

3. 1.2 Material identification plates shall be hung in all kinds of material storage yards, and eye-catching safety warning signs shall be set at dangerous parts on site. The recommended size of safety warning signs and material identification plates is 400 mm×150 mm. The plates shall be hung firmly, in the same direction and with the same height.

3. 1.3 nameplate material: the panel is PVC, and the frame is aluminum alloy or stainless steel.

3. 1.4 window stickers (if the property permits) should be clean, wrinkle-free, straight, and stick outward on the window.

3.2 Construction personnel image

3.2. 1 The managers and operators on the construction site shall wear uniform work cards (work card contents: photo, name, position, type of work, unit and serial number).

3.2.2 All personnel on the construction site must wear safety helmets conforming to national standards. Managers' helmets are red, special operators' helmets are blue, and other construction workers' helmets are yellow. It is forbidden to wear a helmet that does not meet the national standards and has no factory certificate or inspection certificate.

3.2.3 Gambling, fighting and drinking are strictly prohibited in the construction site, and smoking is prohibited in the construction area.

3.2.4 Politely receive outsiders (including the owner himself), and minimize dust and noisy construction when customers are present.

3.3 Site Material Stacking

3.3. 1 Material yard layout requirements

The stacking of materials and the placement of mechanical equipment on the construction site shall conform to the position determined in the site layout; Materials shall be stacked neatly and placed in an orderly manner, and there shall be shaped signs (the size of the signs is 300mm×200mm, and the contents of the signs include: product name, specification, model, inspection status, place of origin, etc. );

3.3.2 Specification for Arrangement and Stacking of Hydropower Materials

1) When hydropower materials enter the site, they should be classified and neatly stacked. Water pipes and conduits are stacked side by side, fittings of water pipes and conduits are stacked in another corner, and wires are stacked separately, so as not to hinder the construction.

2) The decoration garbage should be cleaned up in time, put into garbage bags and sent to the garbage dump before coming off work every day (if there is no garbage removal point, the garbage bags should be neatly stacked along the living room wall and must be removed after completion).

3) The installation of water and electricity pipelines shall be carried out after the construction of line troughs and pipe troughs is in place and all sanitation is cleaned. Every workplace must be cleaned after work. There must be no messy materials piled up and no uncleaned garbage.

4) After the installation of the previous hydropower project is completed, the remaining materials shall be piled up in different categories: the conduits and water pipes shall be bundled separately, one per meter, and uniformly placed indoors; Accessories of wires and conduits shall be classified and bagged. If there is any modification or rework in the middle of the project, materials and garbage should be piled up and removed in time.

5) The lamps, switch panels, cookers, electrical appliances and sanitary wares provided by the Owner shall be well packed and neatly stacked.

6) At the end of the later project, attention must be paid to protection. Materials or tools shall not be placed directly on countertops, finishes and floors. The cut thread head should be removed carefully in time to avoid scratching and damaging the veneer of the bedplate. Clean up carefully after work.

7) The owner's remaining materials, lamps and sanitary ware boxes shall be cleaned, packaged and handed over to the owner in time. Lamps, sanitary ware, electrical appliances and other certificates and quality certificates are stored in a centralized way and handed over to the owner after completion.

3.3.3 Specification for Arrangement and Stacking of Woodworking Materials

1) When carpenters enter the site, they should first plan the construction site and arrange the stacking materials. On the premise of not affecting the construction, they should choose the living room and the room without furniture, and pile them up against the wall as far as possible.

2) Blockboard and multilayer board shall be laid flat on the living room floor against the wall, and the stacking height shall be within1m..

3) Decorative board and plywood are laid flat against the wall in the same room.

4) When stacking the ridge and the Chinese fir file, the ridge should be placed in front of the Chinese fir file, and three bundles should be arranged in a row, and each row should be separated by wooden files to maintain air circulation. (It is recommended to put four pieces of three-meter-long material)

5) In order to prevent the construction site from being narrow and the lines from being piled up in disorder, 3-4 wooden tripods can be installed on the wall about 1.7 meters from the ground, and the wooden lines can be placed on the wooden frame.

6) During the construction process, except the garbage should be cleaned up in time, the remaining materials should be stacked neatly in time after taking materials (large materials and wood blocks should be put back in their original places, and small materials should be stacked next to similar materials).

7) Construction tools should be arranged once a day. Larger tools should be neatly stacked in the appropriate position, and small tools should be put into the toolbox in time.

8) After the carpentry prophase project is completed, tie the skirting line, skirting line and decorative board into the protected countertop in the kitchen, clean up the dust in all the sites and furniture cabinets, pile up the remaining materials neatly, and arrange transportation in time.

3.3.4 Specification for arrangement and stacking of masonry materials

1) The bricklayer must first plan the construction operation site and the stacking site of various materials. On the premise of meeting the normal bearing capacity of the building and facilitating the construction operation, try to choose multiple stacking sites and nearby stacking sites. The basic principles are as follows:

2) Cement and sand aggregate should be stacked in a single row, with the long side of the bag facing the load-bearing wall. Cement stacking height shall not exceed 5 bags, and each stacking shall not exceed 20 bags. The stacking height of sand aggregate shall not exceed 7 bags, and each stacking shall not exceed 30 bags (Note: all bags shall be securely fastened. )

3) Brick blocks and other materials shall be stacked in a single row by the load-bearing wall in the form of brick piles, and the height shall not exceed1m..

4) Ceramic tiles and floor tiles shall be classified according to models and stacked in a reasonable and orderly manner according to load-bearing walls, and the height shall not exceed1m.. Large polished tiles are placed vertically outward against the load-bearing wall, with the length not exceeding 1m, and stacked in parallel in turn.

5) All cement and ceramic floor tiles should be far away from the stagnant water area to avoid water loss.

6) All material packaging bags should be neatly stacked when the balcony wall is opened, cartons should be opened and laid flat, and garbage such as cement bags and foam should be cleaned up in time.

7) After paving, the redundant materials, wall tiles and floor tiles shall be packed or bundled in time and handed over to the construction party or the owner, and the redundant sand and gravel shall be cleared away in time.

3.3.5 Specification for Arrangement and Stacking of Paint Materials

1) When the painter enters the site for construction, the materials should be stacked first, and rooms with little or no indoor furniture should be stacked in the middle.

2) Stack 10 bags of old powder as the standard, and the upper and lower corners of each bag are aligned. The stacking height of glue and latex paint is 2 barrels, and that of polyester paint is 4 barrels, which are arranged in turn.