Joke Collection Website - Bulletin headlines - Detailed Rules for the Implementation of Subsidy Management for Small Farmland Water Conservancy and Soil and Water Conservation in Heilongjiang Province (Heicainong Zi [1999] 1No.)

Detailed Rules for the Implementation of Subsidy Management for Small Farmland Water Conservancy and Soil and Water Conservation in Heilongjiang Province (Heicainong Zi [1999] 1No.)

skill

Can refer to it

Seventh small irrigation and water conservancy subsidies scope of use:

(a) the design benefit area 1 10,000 mu of storage, diversion and irrigation works, 30,000 mu to

Flood control, drainage and alkali control projects (including electromechanical lifting projects), with a storage capacity of 6.5438 million cubic meters.

Reservoir, dam, electromechanical well, sprinkler irrigation, drip irrigation, canal seepage control and pipeline water irrigation project

Materials, equipment costs and technical personnel salary subsidies.

(two) the large and medium-sized irrigation and drainage projects organized by the state are below the branch canal (ditch).

Materials, equipment costs and technical personnel salaries of the whole project (including irrigation and drainage ditches and their supporting buildings)

Help!

(three) to solve the problem of drinking water for people and livestock in water-deficient areas, and to prevent fluoride and improve water (the fluorine content of drinking water exceeds the state regulations)

Standard) water engineering materials, equipment costs and technical personnel wages.

(four) the collection of necessary planning and surveying and mapping data for rural water conservancy professional institutions to carry out farmland water conservancy construction.

Give a one-time subsidy to the purchase cost of general instruments and equipment.

Eighth scope of use of subsidies for soil and water conservation:

(1) Tree species, saplings, grass seeds, tools and materials needed for comprehensive control of soil erosion in small watersheds

Material cost and mechanic salary subsidy.

(two) the poor townships and villages with serious soil erosion and unresolved food and clothing problems shall carry out soil and water conservation construction.

Maintaining facilities, strengthening protective measures, and employing more people obviously affect people's income and can be used appropriately.

Work allowance.

Article 9 The scope of use of subsidy funds for small hydropower stations is limited to small hydropower stations below the township level.

Equipment costs can be subsidized as appropriate.