Joke Collection Website - Bulletin headlines - Maritime terminology

Maritime terminology

General shipping terms

Reservation number: reservation number

Vessel: Name of vessel

Voyage: voyage

CY deadline: deadline.

Deadline/Time: Deadline.

SI expiration date/time: the date/time of supplementing the bill of lading.

Expiration date: expiration date

Sailing date: sailing date/date when the ship leaves the port.

ETA: ETA and ETD.

ETD (estimated delivery time): sailing date.

ETC (estimated closing time): closing date.

Port of loading (POL): Port of loading.

Port of loading: Port of loading

City of origin: the place of departure

Exit: exit

Final destination: port of destination, final destination

Place of delivery (POD) or receiving city: destination, place of delivery

Port of discharge: port of discharge

Port of discharge: port of discharge

Port of loading: port of discharge

Dry: dry/free of liquid or moisture.

Quantity: quantity

Type of goods: type of goods

Container number: container number.

Container: container

Special cargo container: special cargo container

Number of containers: number of containers.

Container size: container size

Feet measured in cubic meters: cubic feet

Control status: container status

Seal number: seal number

Seal number: seal number

Seal type: seal type

Weight: weight

Gross weight: total weight (usually including container weight and cargo weight)

Net weight: net weight

Actual weight: actual weight, the total weight of vehicles such as trucks and containers after loading.

Full load: a heavy cupboard

Remarks: Remarks

Remarks on the wharf: remarks on the yard/wharf.

Receiving Peace: Receiving Place

Commodity: the name of the commodity

Anticipation: Anticipation

ETD: estimated sailing date

Order number: sales order number/order number

Consignor: Consignor

Container number (#): container number.

Equipment number: container number.

Tail of freezer: freezing parameters

Contact person: contact person, contact information

Contact person: contact person

Planned delivery deadline of FCL: the stipulated delivery time of heavy containers, and the delivery deadline of packaging and FCL.

Expected shipment instruction deadline: the specified document clearance time, and the shipment instruction ends.

Deadline of documents: the customs clearance time of documents (according to the general rules of shipping companies, there may be no additional provisions).

Like the above are specified)

Nature of goods: type of goods

Booking party:

Full return location:

Full return:

Embarrassed:

Bulk:

Service contract number: service contract number.

W equipment size/type:

SI CUT: stop the bill of lading to supplement the materials or stop the customs.

BKG staff: BKG is the abbreviation of booking, that is, booking staff.

Area BKG#: reserved area,

Sales representative: sales representative

Bill of lading number: bill of lading number, bill of lading scheme.

Estimated sailing date:

Empty Pick-up Area: Empty Container Location

Empty delivery date: the time to empty the cabinet and the validity period of the cabinet.

Front carrier: preload

Estimated arrival date: EIS arrival time

CY CUT: the time of customs clearance (it is not clear whether it is the time when the terminal cuts off the heavy container or the time when the customs releases the bill)

CY open: the opening time of the whole cabinet.

Port of delivery: Port of delivery

Receiving period: receiving period

Delivery deadline: the delivery deadline.

Ocean route type: sea route type, mostly refers to Indian Ocean route type.

Eq type/q' ty: the number of containers, and type eq is the abbreviation of equipment.

Address: address

Special cargo information: special cargo information

Please refer to the attachment, if any: if yes, please refer to the attachment/if yes, please refer to the attachment.

Shipper-owned container: Shipper-owned container.

Danger: danger or dangerous goods/danger signs.

Internal: central, internal

Published: published, published

MT means ton, which is called metric tone in English.

Customer: customer

FCL full container load: full container.

FCL: FCL of fcl.

LCL less than container loading: LCL, LCL goods

Carrier: carrier

Truck driver: trailer company/transportation company

Tractor number: license plate number

Warehouse: the location of the counter

Pick-up location: the location of the counter.

Packing: loading place

Terminal: counter return position

Return location: delivery location.

Full Container Address: Returns the container location.

Revision: revision, correction and modification.

Size/Type: Cabinet size/type

Port of discharge: port of discharge

Goal: goal

Special type: special cabinet type

Sales Order Number: Order Number

Shipping order number: consignment note number

Temperature: temperature

Vent: ventilation

Humidity: humidity

PTI: detection

Generator set: generator

Description: loading instructions

Special requirements: special requirements

GWT: (Gross weight of goods) Weight limit/container, usually the total weight of container and goods.

SOC: the owner's container

Feeder ship/barge: Barge sailing

Weight: weight

Gross weight: gross weight

Net weight: net weight

MAX: the maximum and maximum value.

MIN (minimum value): the smallest, minimum value.

M or MED (medium): medium or intermediate.

P/L (packing list): packing list, list.

The container door of the shipping company is expressed in English:

1 .gross weight 7 1.650 lbs. 32,500 kilograms

Gross weight/means that the total weight of containers and loadable goods is 7 1650 pounds or 32,500 kilograms.

2. Payload 60,850 lbs. 27,600 kilograms

Payload/indicates the maximum cargo weight allowed in the container, 27,600 kg.

But it doesn't mean that the goods in transit can be so heavy.

3. Tare weight 10800 lb 4900 kg

Deducting the weight of the fuselage/indicating that the weight of the cabinet is 4900kg.

4.cubic 3,040 cubic feet 86.0 cubic feet m

Cubic/indicates the available internal volume of the container, that is, the maximum volume that can be loaded is 3040 cubic feet or 6 cubic meters.

5. The maximum gross weight is 30.480 kg 67.200 lb.

Gross weight/means the total weight is 30,480 kg, which is the sum of the weight of the cabinet and the weight of the loadable goods.

6. Tare weight is 4.850kg10.690lb.

Deducting the weight of the fuselage/indicating that the weight of the cabinet is 4850kg.

7. The maximum gross weight is 25.630 56.5 10/0 lb.

Payload/ means that the maximum cargo weight allowed in a container is 25,630 kg, but it doesn't mean that the cargo in transit can be loaded that heavy.

8 cubic meters 86.0 cubic meters 3040 cubic feet

Cubic/indicates the available internal volume of the container, that is, the maximum volume that can be loaded is 86 cubic meters.

9.MGW。 32,500 kg71.650 lb

Gross weight/means the total weight is 32,500 kg, which is the sum of the weight of the cabinet and the weight of the loadable goods.

10. Net weight 28600kg 63.050lb.

Net weight/payload/indicates that the maximum cargo weight allowed in a container is 28,600 kg, but this does not mean that the cargo in transit can be loaded that heavy.