Joke Collection Website - Bulletin headlines - Treatment of fire pool in the main building of civil air defense project

Treatment of fire pool in the main building of civil air defense project

The steps are as follows:

1. Anti-sump collects waste water from explosion-proof floor drain and civil air defense, while ordinary sump collects waste water from basement at ordinary times.

2. Tight protection, with a height of not less than 1. 15m. ..

3. According to the drawings, what kind of reinforcement atlas should be used for construction? Generally, the slope should be placed outside, 45 degrees or 60 degrees. Please consult the local civil air defense acceptance department for specific standards.