Joke Collection Website - Bulletin headlines - Do I need to apply to the urban management for approval as a doorman?

Do I need to apply to the urban management for approval as a doorman?

Needed.

Door billboards are also called store signs or store signs, and are included in the scope of outdoor advertising management.

Many cities have promulgated relevant regulations, which have clear requirements for the size and material of store signs, and they need to go to the local urban management department to go through the approval procedures in advance.

What are the procedures required for store front approval

Application conditions:

1. The applicant is a commodity operator or service provider who sets up commercial outdoor advertising. ;

2. The installation of outdoor advertising facilities must comply with urban planning and streetscape planning requirements, be coordinated with urban regional functions, meet the requirements for beautifying the city appearance, and must not affect the functions of the building (structure) itself and the adjacent areas. The lighting and safety of buildings (structures) shall not hinder traffic or affect fire escapes, nor damage the appearance of the city. Outdoor advertisements on the top of the same high-rise building must be of the same height from top to bottom, with the front and rear facades flush and connected to each other, and strive to use neon lights and synchronize the overall lighting.

/p>

Second, go to the convenience center in each district to apply for a door opening license with the opinions of the Urban Management Supervision Squadron;

Third, after the convenience center approves the application, take the application to the jurisdiction The Urban Management Supervision Squadron issued the merchant a copy of the urban outdoor door sign installation and facade decoration license and the municipal outdoor advertising facility installation license. With these two certificates, the merchant can carry out advertising installation and decoration, but note that it must be in The construction must be completed within the date specified in the two certificates. If the construction cannot be completed on time within the deadline and an extension is needed, an application should be made to the urban management department again.

4. After the decoration is completed, report it to the urban management and supervision squadron within the jurisdiction. The urban management and supervision squadron will go to the site to inspect the completed outdoor advertising. If it is correct with the applied specifications and styles, it will be replaced with Kunming outdoor advertising facilities. Setup license (original).

In addition, the license for setting up outdoor advertising facilities is reviewed once a year. If you want to continue to use it after the expiration, the merchant should submit an application for setting up the facilities in accordance with the relevant regulations before the expiration and go through the approval procedures again. If the application is not processed after the expiration date, formalities will be considered as illegal settings.

Finally, the materials required to apply for a license to set up outdoor advertising facilities are:

1. State the specific location of the store, the structure (material) of the installation, and the dimensions (length, width, (High) application form for outdoor advertising installation license;

2. A copy of the business license, real estate certificate or house rental contract and legal person ID card; 3. Pictures of the original installation location and the desired Rendering of the installation.

Legal Basis

"Regulations on Urban Management of the People's Republic of China" 11. When setting up outdoor advertisements, placards, galleries, windows, etc. in cities, the content should be healthy and the appearance It is beautiful in appearance and needs to be regularly repaired, repainted or dismantled.

The installation of large-scale outdoor advertisements must obtain the consent of the city appearance and environmental sanitation administrative department of the city people's government, and go through the approval procedures in accordance with relevant regulations.