The supervision committee will issue the commencement order in a few days.

The supervisor shall issue a commencement order to the contractor 7 days before the commencement date.

The commencement order is a written document issued by the supervisor to allow commencement, and the date of issuance of the commencement order is the actual commencement date of the project. The commencement order is the starting point for calculating the construction period. At the same time, the contractor also needs to have a clear start date, so as to get the required commitments (such as ordering, renting machinery, providing labor, etc.). ) get it from subcontractors, suppliers and other interested parties in advance, and get the advance payment paid by the owner.

The supervision engineer should choose the right time to issue the commencement order according to the preparation of the contractor and the owner for the commencement of the project. In order to check the preparations of both parties, the supervision engineer shall attend the first site meeting hosted by the owner. The owner shall do a good job in land acquisition and demolition according to the contract, and provide construction land in time. For the owner, when the supervision engineer issues the notice of commencement, it is necessary to hand over the required sites and passages to the contractor in accordance with the requirements of the construction sequence stipulated in the contract.

Construction sequence after the supervisor issues the commencement order.

1, according to the construction sequence agreed in the contract, such as key projects, difficult projects, projects that control the construction period and projects that have great influence on the follow-up, it is determined to start first.

2, according to the requirements of design drawings or design data to determine the construction sequence.

3, according to the requirements of construction technology, construction specifications and operating procedures to determine the construction sequence.

4. Determine the construction sequence according to the requirements of the overall construction organization and management of the construction project.

5, combined with the actual situation of construction machinery and construction site to determine the construction sequence.

6, according to the local resources and outsourcing resources to determine the construction sequence.

7. According to the geological, hydrological and local climate changes of the construction project, the construction sequence is determined according to the degree of influence on the construction project.