Joke Collection Website - Blessing messages - Is the post-qualification review of Guangdong Second Construction Project strict?
Is the post-qualification review of Guangdong Second Construction Project strict?
1. The post-examination review of Guangdong Erjian is whether the candidates meet the registration conditions. All candidates only need to prepare the registration materials in strict accordance with the registration conditions to ensure that they meet the registration conditions, so the post-examination of the qualification of the second-level constructor is not strict. The materials of post-trial audit and pre-trial audit are similar, but the audit time is different.
2. Pre-test review: review the application materials at the time of registration; Review after the exam: generally, review begins about one month after the results are announced. Registration form printed in the registration stage 1 copy; 1 Original and photocopy of relevant certificates (education certificate, ID card, etc.). ), as well as other relevant materials required for qualification examination.
3. Spot check refers to that the competent department of industry (or the directly affiliated institution authorized by the competent department of industry, hereinafter referred to as the verification institution) draws a certain proportion (not less than 10% of the total number of qualified personnel, and the specific proportion and candidates are determined by the verification institution) to review its registration conditions, and make treatment opinions on whether it is qualified, unqualified or fails to complete the audit on time.
4. The examining unit will send a short message of "Material Site Photo Archive". Candidates must bring their original ID card and academic certificate (degree certificate) to the personnel examination institution in the examination area to collect on-site images and wait for SMS notification to inquire about the examination results. The requirements for audit materials vary from place to place. Please refer to the requirements of the local audit notice.
At present, there are the following situations
1. If the certification materials need to be uploaded, the materials should be prepared as soon as possible as required, submitted for confirmation, and waiting for the audit results. If you can't submit the materials required by the exam within the specified time, such as education, major, years, etc. If you don't meet the application conditions and fail the exam, your exam results will be cancelled and you can't get the registration certificate.
2. If the status is Unaudited, you should always log in to the system and pay attention to the audit status at any time.
Congratulations, just waiting for the license. At this time, you can also make the next plan, such as adding items to the second building, taking the first building exam, evaluating professional titles, upgrading academic qualifications, and jumping ship.
- Related articles
- What's the tick-tock number?
- Received a text message from Wanda Finance.
- Fraud message about 139 sending phone bills.
- A word of thanks to the well-wishers_Warm Thanksgiving greetings
- I have never used installment music, but I have received a reminder message from installment music.
- Cancer SMS
- The Redmi phone prompts that there is insufficient storage space and cannot receive text messages.
- I was reported for sending a spam text message by mistake. What should I do?
- How to set up the transfer of landline calls to mobile phones? How to cancel?
- Huawei's mobile phone call records are not displayed.