Summary of engineering project construction

Summary refers to the written material summarizing the experience or situation in a certain stage of work, study or thought, through which we can comprehensively and systematically understand the previous study and work, so we should make a good review and write a good summary. So what should be included in the summary? The following is a summary of the project construction that I have compiled for you, for reference only. You are welcome to read it.

Summary of Project Construction 1 Time flies. Half a year has passed in a blink of an eye, and I am filled with emotion. I want to make a summary of project management for half a year to repay my work, ideological changes and opinions. Solid engineering construction theory and technical management knowledge and rich on-site construction experience are the basis for doing a good job in engineering project management; This needs to be accumulated and summarized in the usual work, so that practice and theory can be better precipitated on their own abilities and better managed and coordinated.

I. Technical management:

1. External coordination: For an engineering project, external coordination is very helpful for the smooth development of the project. My main job is to cooperate with various professional companies (tap water, heating, gas) to complete the supporting design of the pipe network of the project under the guidance of the competent leader. The supporting design of professional pipe network is proceeding as scheduled. At present, the design of water supply and drainage pipe network has been completed, and the design of gas and heating pipe network is under way. In the course of work, we can actively cooperate with various professional designers to complete various tasks from the company's interests and perspectives.

2. Be able to do a good job of drawing review patiently and carefully, cooperate with the competent leaders and relevant design units to implement the location and direction of water supply and drainage, heating, gas and other pipe networks in the community, find unreasonable schemes and designs as much as possible, put forward their own schemes and ideas, actively communicate with designers, and improve the design of schemes and construction drawings.

Second, the quality objectives

1. Through the management and promotion of the pre-planning work of the project, the whole company has clearly realized that the pre-planning work of project implementation is an important prerequisite for project management. In view of this, this year, when the company set the quality target at the beginning of the year, it took the coverage rate of the pre-project planning as an important work goal.

2. Actively promote new technologies, and the company will carry out excellence work from top to bottom in a planned way. On the basis of seven municipal-level and two provincial-level quality projects obtained last year, this year, we also obtained two ministerial-level quality projects of 220KV power distribution equipment and silicon rectification project and electrolytic flue gas purification and recovery system project in an aluminum plant, and three municipal-level quality projects of a parking lot and a power plant, exceeding the excellence plan formulated at the beginning of this year.

3. By implementing the supplementary management measures for measuring instruments of a company, all the projects and equipment companies that manage measuring instruments are urged to operate the measuring instrument management system in strict accordance with the Control Procedure for Monitoring and Measuring Devices, which overcomes the shortcomings of unclear responsibilities and chaotic management of the units and users of measuring instruments, and makes the qualified rate of measuring instruments reach the requirements of 100% formulated at the beginning of the year.

4. In strict accordance with the requirements of the quality internal audit plan, all the projects under construction of the company's organs and permanent institutions were routinely audited. The problems found in the internal audit were reported, and the nonconformities of 5 1 found in the audit were urged to rectify.

Third, establish a project accounting system.

To control the project cost, people, materials, machinery and management are the main expenses that constitute the cost; Calculate the labor cost strictly according to the workload, optimize the labor force, reduce rework and put an end to the abuse of labor force. Strictly follow the time limit for a project, it is forbidden to stop work without reason, and the employment should be timely and quantitative (quantitative); Before the materials are extracted and used, the main person in charge of the construction should be familiar with the construction drawings, know fairly well the amount of materials, extract materials on time and according to the quantity, try to control the amount of materials as much as possible, and construct strictly according to the drawings. Civil engineering foreman uses more materials than materials, which should be reflected in writing in the form of consultation.

In the half-year work summary of project management, through adhering to and perfecting these two cost management measures for many years, we have not lost money in the project construction task and made some work for the enterprise to create benefits. In the next six months, I will continue to struggle.

Summary of Project Construction 2 Time flies, 20XX years have passed in a blink of an eye, and a brand-new 20XX year has come. Come to the company for one year and feel the warmth of the company, the care of the leaders and the friendship between colleagues. To sum up:

First, the ideological aspect.

In the past, I was impetuous, didn't pay attention to learning, and had little knowledge. After coming to the company, I felt the development of the company, and the company has always emphasized strengthening learning. To this end, I spend half an hour browsing the atlas manual every day, and the effect is obviously improved. Labels that were previously unknown can now be understood. When communicating with Party A's supervisor, respect them, but when it harms the company's interests, stand up and say' no' in time and report to the company's leaders in time. We should strengthen our study and arm our minds with knowledge. Respect the decisions made by company leaders.

Second, the work.

In just one year, many projects were involved. In XXX project: the column section is enlarged, and the bottom of the beam is bonded with steel. XX project: add beams and expand the cross section of beams. XXXX Project: Dismantle the fence and reinforce the new fence. XXXX Project: Demolition of the roof, foundation and columns with enlarged cross section, columns covered with steel, and new columns covered with steel bars. XXX project: sticking carbon fiber cloth on beam and slab. XXXX Project: Ramp demolition and reconstruction, air shaft opening reinforcement.

In the above-mentioned construction process, we should strictly follow the rules and regulations formulated by the company to demand ourselves and the team. There are also some minor problems in the construction process. It is also a lesson for me to ask the team to rework after discovering it in time. In the process of construction, it is also constantly learning and making progress. In the process of construction, the list of materials related to steel bar blanking should be strictly reviewed, and it is strictly forbidden to waste materials. Communicate with the company leaders in time when you encounter unclear problems, and don't do stupid things. We must strictly control the quality.

Third, the requirements for your future:

In 20XX, we should be strict with ourselves, strengthen our study and strive to improve our knowledge. In the process of construction, strictly control the quality and prohibit wasting materials.

Project construction overview 3 xx project is located in xx District, xx City, with a total construction area of xx square meters, with xx floors above ground and xx floors underground. The structural form of this project is frame-shear wall-core tube structure. The actual commencement time is xx years, xx months and xx days, and the planned completion time is xx years, xx months and xx days. Faced with the unfavorable conditions of tight construction period, small construction site and great financial pressure, our project department carried forward the spirit of Tiejun, which is good at fighting hard, and successfully completed the construction task by using scientific management and advanced technology.

First, safety in production, an eternal theme

Safety in production, people-oriented, human life is the most precious. Safe work is closely related to the life of employees and the happiness of every family. Pay more attention to Mount Tai, take "people-oriented, strengthen management" as the foundation, and always put safety work first. Carry out modern safety management in an all-round way and implement JGJ59-99 standard. Pay attention to ideological unity (unity of goals) and implement it from responsibility (organizational measures, safety technical measures and labor protection measures).

According to the requirements of relevant laws, regulations and specifications, and in combination with the actual project, the "Management Team for Safe Production and Civilized Construction" was established, and a perfect safety guarantee system was established, with unified leadership, division of responsibilities and clear responsibilities, so that the objectives, measures, inspection, rectification, summary and evaluation of safety management were closely linked, and the standardized and orderly development of safe and civilized construction was promoted.

1. Carry out publicity and education on safety production and training on safety production knowledge with "safety production and prevention first". All employees will participate in the comprehensive assessment, and the comprehensive assessment pass rate is 100%.

2. Establish a set of strict safety technical standards and requirements, a set of scientific accident (hidden danger) investigation and handling procedures, a set of perfect rules and regulations, labor discipline and strict reward and punishment regulations.

3. Formulate scientific and targeted safety organization, technology and labor protection measures, standardize site management and operation behavior, improve protective facilities and implement construction process control. For example, the safety management of aerial work, lifting operation and "four ports and five sides" has reached the goal of full staff, comprehensiveness, whole process and all-weather.

4. Seriously implement the safety production inspection system, implement self-inspection, mutual inspection, full-time inspection and comprehensive inspection, timely implement rectification based on the principle of "three determinations", and lock in the "zero occurrence" of accidents.

5, according to the relevant standards, regular inspection of large and special machinery and equipment, correct maintenance, make its safety and technical condition is always in good condition, better service production; Strengthen the professional quality training of special operations personnel, and achieve the qualification rate of certificates 100%.

6. Strengthen the office safety information management, and complete a set of safety management software according to the specification requirements. The information in the office is comprehensive, specific and traceable.

At the same time, organize project managers to learn from their brother units with an open mind to make up for their own shortcomings, and specially invite relevant management experts for on-site guidance to strengthen management awareness and improve management level.

Through careful planning and solid implementation, on-site safety management always runs along the healthy track of safety, stability and development.

The second is product quality, the lifeblood of survival.

In line with the guiding ideology of "every project and every service will satisfy customers", we will strictly control the quality, and use scientific methods to supervise, inspect and control the products in the whole production process of building products, so as to make the engineering quality reach the standard.

1, establish and improve the quality assurance system.

A quality assurance leading group composed of project manager, chief technical engineer, data, quality, materials, equipment, testing, measurement and other related departments was established to supervise, inspect and control the project quality in detail, thus achieving process quality.

2, the preparation of construction organization design and dynamic implementation.

Key points: conform to the requirements of construction drawings and construction contracts, and the preparation of general schedule plan conforms to the requirements of contract time limit. There are corresponding guarantee measures: the general layout meets the needs of production and life, meets the needs of machinery, materials and process operation, and has clear construction and quality assurance measures for key parts and processes; There are corresponding measures for seasonal construction, which can be adjusted and improved according to the current situation in actual construction.

3. Improve process control and improve product quality.

Pay attention to pre-control and in-process supervision from five aspects: "man, machine, material, law and environment" to nip quality accidents in the bud. Human control: fully mobilize people's enthusiasm and give play to the leading role of "human factors first" to improve managers' management level and technical theory level. Quality inspection and acceptance ability, professional quality of various operators, and quality control of materials and components; Master material information, optimize suppliers, reasonably organize the supply and use of materials, strengthen the inspection and acceptance of materials, attach importance to the use certification of materials, and prevent misuse and use of unqualified materials. The witness system of material sampling was implemented. Quality control of construction machinery: reasonably select mechanical performance parameters and operation requirements according to the specific conditions of the job site; Method control: Combined with the construction organization design, the key points are technical scheme, technological process, organizational measures and detection means. Control of environmental factors: When making the control plan, comprehensively consider and analyze the engineering technical environment, engineering management environment and labor environment, so as to make the feasibility of the measure plan within the actual control range.

Through actual management and effective control, the project has not had any quality accident from beginning to end, the product has reached the predetermined goal, and all the supervision and acceptance have passed at one time, and the first pass rate of the project is 100%.

Third, the premise of fast and efficient.

In line with the guiding ideology of "every project and every service will satisfy customers", we will strictly control the quality, and use scientific methods to supervise, inspect and control the products in the whole process of building products production, so as to make the project quality up to standard. While ensuring safety and high quality, whether an enterprise can achieve good social and economic benefits is the key. On the premise of adjusting the factors of good people, we will work hard in the construction process. According to the construction organization design and scheme, the assembly line implements the division of labor and responsibility.

(1) Every working procedure is carried out with personnel, positioning, timing and quality assurance, and the next working procedure is the information that the user guides the operation and successfully completes the task.

(2) The reinforcement sub-project plays a decisive role in the quality and progress of the whole project, and the weather influence is the leading factor in the reinforcement project. Therefore, reasonable control of room temperature is a key point. In view of this problem, we re-compiled the reinforcement construction operation plan, established the key and difficult points, set up a special management team, and implemented special control, which ensured the normal operation and effective utilization of the reinforcement operation, greatly improved the operation efficiency and saved valuable construction time.

(3) Implement the reward and punishment measures of the team's division of labor responsibility system, reward the diligent and punish the lazy, reward the excellent and punish the poor, implement warm management under the ruthless system constraints, and mobilize all positive factors, so that all employees can realize that after completing a common goal, they will also get the rich rewards they deserve, so as to complete their respective tasks wholeheartedly.

Four, the management in the industry, the key to improve the level of on-site management.

While actively building on-site hardware, we pay special attention to indoor management, set up indoor management institutions, establish various management accounts with safety, quality, progress and technology as the only content, compile plane and elevation control charts of various indicators, record the objectives, measures, inspection and rectification in detail, and summarize and evaluate them, so as to provide a complete basis for realizing on-site dynamic analysis and better serve on-site management.

All the work of this project has been finished. Based on the tenet of customer first and lifelong responsibility, we strive to do a good job of return visit service to satisfy users and reassure owners.

Summary of Project Construction Since the Level-4 communication and thinning project settled in our school, with the support and help of leaders at all levels, all the work of the Level-4 communication and thinning project has been carried out in an orderly manner, solid and effective. Now, we will report the use of the equipment of the curriculum reform project in our school in education and teaching to the superior leaders as follows:

I. Basic information of the school

Longan No.1 Middle School was founded in 1946. The school has 12 classes, with more than 79 faculty members and more than 534 students. The school has an electronic lesson preparation room, 12 computers equipped with Lenovo I3 processor, and 12 integrated classrooms. Teachers and students of the school can access the server through the local area network to prepare lessons collectively, or they can directly access the Internet to search for the resources they want and obtain valuable educational information to guide the usual education and teaching. In the process of implementing the Party's educational policy and implementing quality education in an all-round way, the school adheres to scientific management and runs the school according to law. For some time, the school has created norms, engaged in scientific research, run characteristics, focused on development needs, focused on quality education, and took modern information technology education as a breakthrough, winning one honor after another for the school.

The second is to standardize management and improve the system.

1. Strengthen leadership and clarify responsibilities.

The school has set up a class reform project leading group with principal Wang Shanglin as the team leader, vice president Shi Tonghuan as the deputy team leader, director of the guidance office, director of the teaching and research group Nong Tiangui, and computer teacher (technical administrator) as members, to clarify the work responsibilities of the leading group members and ensure the normal and orderly development of the integrated machine resource application. Sound organization, perfect system, clear division of labor, implementation of responsibilities and good management.

2. Strengthen the management of standardized files.

(1) Strengthen the management of equipment and resources, and implement the responsibilities of management teachers.

Our school has a teacher's collective lesson preparation room with corresponding administrators. Every day, the educational resources of teachers' collective lesson preparation are sorted and shared to the server, and the computer problems in the process of lesson preparation can be solved in time. At the same time, records of reception, use and maintenance have been established, and the dust prevention, theft prevention, fire prevention, moisture prevention and lightning protection of the equipment have been done well, and no safety accident has ever occurred. According to the actual work, the management teachers sort out the resources and establish a detailed resource catalogue, which is convenient for teachers to browse and find resources.

(2) Strengthen the application management of all-in-one resources and implement the main responsibility.

The school has established and improved the effective mechanism of curriculum reform project, and constantly improved the enthusiasm of school teachers to apply all-in-one equipment. The school spends 65,438+00% of its budget on small-class projects, encourages teachers' interest in application in various forms and methods, and establishes a long-term mechanism to gradually form an atmosphere of "teaching with CD-ROM is normal, but not used to it". The school organized teachers to carry out the teaching and research work of one machine, and achieved gratifying results, which played a very obvious role in deepening the education and teaching reform of our school, reducing the burden of students' schoolwork and improving the quality of education.

(3) Strengthen the construction of integrated resource database to meet the needs of classroom teaching.

In the process of implementing the resource database construction, Director Nong Tiangui of the Academic Affairs Office of our school personally took the lead and assigned each teaching and research group their own task of setting up subject resources, which required quality and quantity to be completed. At the same time, the director of agriculture can often check the construction progress of the resource database, praise the well-established teaching and research groups, and supervise the teaching and research groups that are not in place. The all-in-one machine project has been settled in our school for less than two months, and our resource library has many resources for teachers to use.

In order to meet the needs of classroom teaching, the school encourages teachers to make their own courseware. Our school has sent people out to study courseware making many times, and then trained teachers in courseware making after returning to school, so that 80% teachers can make courseware independently according to the teaching content. Teachers have made practical efforts to enrich the school's audio-visual resources and improve their professional quality.

Third, attach great importance to training and promote its use.

1, training work

Members of the audio-visual education group of our school actively participate in the training organized by cities and counties and are very familiar with the class thinning project. They have organized school teachers to carry out integrated machine resource application training for many times. Through learning, teachers have mastered the basic methods of using multimedia resources for teaching. The school has established a campus network, and teachers in our school can browse on any machine through the local area network. After teachers skillfully use all-in-one machines, they have a new understanding of all-in-one machine resources and a higher interest in using them, which greatly promotes the effective integration of all-in-one machine resources and disciplines in our school and improves teachers' ability and efficiency in applying resources.

2. Application work

After several rounds of training, the teachers mastered the operation skills. The school has strengthened the system guarantee and formulated practical safeguard measures, requiring everyone to browse all-in-one resources at least once a day, make full use of all-in-one network to prepare lessons, realize the sharing of high-quality resources, enrich their knowledge accumulation, learn teaching skills, improve teaching quality and promote teachers' professional growth. At the same time, integrated teaching activities are often carried out: every teacher is required to attend classes in multimedia classrooms frequently. In normal teaching and public teaching, teachers are encouraged to download resources from the resource server to make courseware, and the way of teaching presentation is improved, which makes the traditional teaching platform "textbook, whiteboard and teacher" have new connotations, enlivens the classroom atmosphere, increases the teaching intuition, and makes it easy for students to accept and teachers to operate. Teachers are required to actively write audio-visual teaching papers, write experiences and sum up experience; Carry out excellent teaching plans, excellent courses and excellent courseware evaluation activities. The school organizes teachers to watch educational news, teacher training plan and new curriculum teacher training plan. Promote teachers to learn more and use more, and make full use of resources to serve teaching.

In teacher training, collective lesson preparation, teaching seminars and teaching competitions, our school makes full use of all-in-one resources to carry out activities, which makes the originally boring learning and teaching activities lively and interesting, improves efficiency and makes our work experience more interesting than ever. Students enhance their interest in learning by learning information technology, and their enthusiasm and attention in class are constantly improved, which greatly broadens their thinking of solving problems and cultivates their innovative spirit and practical ability. Key teachers take the lead, drive all teachers to participate, broaden their horizons and teaching ideas, and show students pictures that are difficult to observe in life through information technology, so that students can understand the content more vividly and richly, and promote the reform and innovation of classroom teaching.

Fourth, pay attention to practical results and achieve outstanding results.

With the modern integrated machine, our school has made brilliant achievements in education and teaching. In 20XX, many teachers, such as Wei and others, won the first prize in the new curriculum reform practice competition organized by the county education bureau.

Five, set goals, sustainable development

The all-in-one machine, a new thing, is still a brand-new topic for us. How to consolidate and develop this brand-new educational means will be an important task for us for a long time. In the future, the school should establish an assessment system for the use of all-in-one machines, strictly assess and supervise teachers' application of all-in-one machines, closely link it with teachers' year-end assessment, evaluation and selection, strengthen the assessment and incentive mechanism, increase teaching, research, exchange and training activities based on "the application of all-in-one machine resources", implement the requirements of promoting the use of all-in-one machines through training, mobilize the enthusiasm of each teacher, and make the all-in-one machine work develop continuously and steadily, and move towards the goal of teaching modernization.