Processing contract is one of the most common contracting contracts. So what is a steel structure processing contract? The following is the template of steel structure processing contract that I compiled for you. Thank you for your appreciation.

Fan, steel structure processing contract

Ordering party: (hereinafter referred to as Party A) Undertaking party: (hereinafter referred to as Party B)

In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties reached an agreement on the processing contract and concluded this contract.

I. Processing Scope and Contract Price

1, processing project name:

2. The drawing deepening required for this processing shall be provided by the responsible party.

3. The raw materials required for this processing are provided by the person in charge, including (materials, processing, derusting, painting and transportation).

4. Processing scope: The main structure (except the enclosure structure) specifically includes the following contents:

Second, the production quality requirements

Party B must carry out the deepening in strict accordance with the drawings provided by Party A, the contract requirements signed by Party A and Party B and the Code for Acceptance of Construction Quality of Steel Structure Engineering (GB50205)? 200 1, technical specification for welding of building steel structures JGJ8 1-2002 and related technical specifications and standards for steel structures, processing, manufacturing and acceptance.

Party A will send factory supervisors or inspectors from time to time to inspect the parts and finished products under processing. If it is found that the parts do not meet the above requirements, Party B shall unconditionally rectify them until they are qualified. Party A's inspection does not relieve Party B of its guarantee and related responsibilities for the processing quality of parts.

Party B shall provide quality guarantee, certificate of conformity, third-party inspection report and other relevant handover materials according to Party A's requirements ... Other quality requirements or technical standards: processing according to drawings. Steel: the original flat plate or open plate must be used for steel plate, and strip steel and narrow middle plate are prohibited. Shot blasting rust removal reaches Sa2.5 level, and iron red alkyd antirust paint is applied twice.

Three. Place and date of delivery

1, delivery place:

2. Delivery date:

3. The transportation of parts shall be borne by, and the expenses arising therefrom shall be borne by.

Fourth, the settlement method

1. The unit price of spare parts shall be priced at one time, and the quantity shall be settled according to the detailed drawings provided by Party A. 2. All steel members within the scope of this contract shall be completed with good quality and quantity within the time required by Party A, and correct and complete production materials shall be provided, and settlement shall be made after the installation and acceptance of the main body of the project is completed.

Verb (abbreviation of verb) payment method and settlement

Payment method: pay 30% of the steel structure on site. After the installation is completed, Party A shall pay 85% of the contract price after receiving the invoice of the total project cost from Party B, and 95% of the settlement price after the overall project of the construction unit is accepted. Party A shall pay the remaining 5% quality deposit in one lump sum after confirming that there are no quality problems within one year.

The responsibility of both sides of intransitive verbs

1. Party A's responsibilities:

(1) is responsible for handling the related problems in the construction drawing proposed by Party B, and giving a reply within 3 days after the design institute's reply, so as to reduce all kinds of unnecessary losses caused by drawing errors.

(2) If the owner or civil engineering unit fails to enter the site according to the construction progress plan, it must adjust the delivery plan date in time and notify Party B to adjust the production plan in the form of contact sheet 7 days in advance.

(3) In the process of installation, if manufacturing errors are found, the installation shall be stopped immediately, and Party B shall be informed in writing in time to actively assist Party B to take remedial measures to minimize all kinds of losses, and the expenses arising therefrom shall be borne by Party B. ..

(4) Party B shall designate a special person to be responsible for the delivery. After all parts and accessories are delivered to the construction site, Party A must assign special personnel to check the quantity and appearance quality of the parts and accessories, and sign the quantity and appearance quality and the name of the inspector on the delivery note. Party A shall bear the losses caused by the dereliction of duty of Party A's inspectors. ..

⑤ Be responsible for arranging the factory inspection and acceptance by the owner, designer and supervisor, and bear all expenses arising from the factory inspection and acceptance not attributable to Party B. ..

2. Party B's responsibilities

(1) components and accessories must be made in strict accordance with the installation requirements of the construction site. Before delivery, the quality of various components must be strictly checked, and the delivery list should be filled out in detail according to the requirements of finished component list and planned delivery list provided by deepening design. The delivery note is made in quintuplicate (one for Party A, receipt, settlement office of project operation management center (department), delivery team of finance department and operation department) and delivered to the construction site by the carrier. The carrier is responsible for bringing it back to Party B after it is confirmed by the visa of the receiving personnel of Party A. ② Components and accessories must have obvious numbering marks.

(3) Loading must be carried out in strict accordance with the loading operation instructions to ensure that the components are safe and firm during transportation and are not damaged. Party B shall be responsible for all kinds of damage caused by improper transportation.

(4) Party B must send people to the construction site for treatment within 24 hours (within 48 hours outside150km) after insisting on written notice of mistakes.

(5) Party B must provide complete production materials with the goods according to Party A's requirements.

(6) Responsible for receiving the relevant personnel of the owner, supervisor and design unit to the factory for inspection and supervision; When the owner, supervisor or design representative comes to the factory to inspect and supervise the production, a written report on the production of engineering parts and accessories must be provided. If the owner, supervisor and design representative come to the factory for re-inspection and acceptance due to the lag of production quality and production progress, all expenses incurred shall be borne by Party B. ..

Seven, drawings to provide time and confidentiality requirements

1. When Party A provides drawings, both parties agree that Party A will provide a set of drawings to Party B before, and the expenses shall be borne by Party A. ..

2. Without Party A's consent, Party B shall not disclose Party A's relevant information to any third party, otherwise Party B will bear relevant legal responsibilities.

Eight. responsibility for breach of contract

1. If Party A fails to provide drawings (including change orders) within the time limit stipulated in the contract, Party B may postpone the delivery date. If Party B violates this contract and fails to deliver qualified cooperative parts and handover materials in time according to the delivery order, Party B will bear all responsibilities and economic losses caused thereby.

2. If Party B fails to deliver the goods on time (not due to Party A's reasons), and after the mismatched goods are delivered to the site, it is found that the components are unqualified, thus delaying the construction period, Party B shall compensate Party A for 3% of the total contract price for each day of delay. . The total accumulated fine shall not exceed 5% of the total contract price.

3. If the serial numbers of the parts delivered by Party B are unclear, edited incorrectly or omitted, and the serial numbers need to be re-checked at the construction site, and Party B fails to re-number them at the construction site within 2 days after receiving the notice of re-numbering, Party B shall compensate Party A for the cost of checking the serial numbers of 30 yuan/parts.

4. If Party A fails to pay the project payment to Party B at the time and amount agreed in the contract, Party A shall pay 3% of the payable amount for each day overdue. Pay late fees to Party B. ..

Nine. argue

1. In case of any dispute over this contract, both parties shall settle it through friendly negotiation. If negotiation fails, bring a lawsuit to the people's court where Party A is located.

This contract is made in sextuplicate, with Party A holding three copies and Party B holding three copies. Attachments to the contract (drawings, technical requirements, list, delivery plan, etc.). ) is also regarded as an integral part of this contract and has the same legal effect as this contract.

3. This contract shall come into effect after being signed and sealed by both parties. After the funds are delivered and settled, the components will automatically become invalid.

Ordering party: (official seal) Contractor: (official seal) Address: Legal representative: Legal representative: entrusted agent: entrusted agent: bank of deposit: bank of deposit: account number:

Article 2 of the model contract for steel structure processing

Party A:

Party B:

According to People's Republic of China (PRC) Contract Law, Construction Law, Regulations on Quality Management of Construction Projects and other relevant laws and regulations, Party A and Party B reach an agreement through consultation.

Rule number one. Project overview

1, project name:

2. Project location:

3, the project cost:

Article 2. Subcontracting content

Party B shall carry out all the work of steel structure fabrication, rock wool board installation, cement board installation, external wall spraying and cast-in-place floor slab and roof slab according to the design drawings provided by Party A. ..

The above work scope includes material supply, transportation, blanking, fabrication, welding, getting on and off, transshipment, painting, hoisting, installation, coordination, acceptance and protection of finished products of the original building. Party B shall be responsible for all labor, materials, machines and tools, construction safety, etc.

Article 3, the construction period

The total duration is. The start date is and the scheduled end date is.

Article 4. terms of payment

1. Within three days after both parties sign the contract, Party A shall pay Party B an advance payment in RMB.

2. Party A shall pay Party B the second payment of RMB (in words: RMB only).

3. Party A shall pay RMB (in words: RMB only) to Party B in three installments.

4. After the completion of the project, after the acceptance by both parties, 1 10,000 yuan will be reserved as the quality guarantee fund, and the rest will be paid within 7 days, and the quality guarantee fund will be paid in one lump sum within 6 months.

Article 5. Responsibility of both parties

Party A's responsibilities

1. Pay the project payment according to this contract and settle it in time.

2, coordinate the project construction process and property and other aspects of the situation.

3. Provide temporary water and electricity access points on site.

4. The drawings provided shall conform to the safety structure.