Joke Collection Website - News headlines - Thunderstorm property emergency plan

Thunderstorm property emergency plan

Thunderstorm Property Emergency Plan 1

1. Purpose

1. Clarify the preventive measures and emergency procedures during heavy storms, and adopt active and effective prevention measures measures to minimize losses.

2. Scope of application

1. Prevention of emergencies such as strong winds and heavy rains in the property management area.

3. Responsibilities

(1) The customer service center is responsible for the issuance of early warning notices for strong winds and heavy rains, arrangements for preventive work, and the handling of emergency incidents during strong winds and heavy rains.

(2) The Engineering Maintenance Department is responsible for the inspection and prevention of the building body, public facilities, and mechanical and electrical equipment before warnings of strong winds, heavy rains, etc.

(3) The order maintenance department is responsible for the implementation of prevention work and preparation for emergency incident handling.

IV. Implementation Procedures

(1) Early Warning Prevention

1. After receiving the gale or heavy rain warning issued by the relevant departments, the management office will issue a notice on the notice board Issue written notices to remind owners (tenants) to take preventive measures before strong winds and heavy rains. If necessary, use fire broadcasts to issue notices.

(2) Prevention preparations

1. The order maintenance department will arrange personnel to increase the number of patrols and focus on checking the following items.

1.1 Check and ensure that exterior wall windows are closed.

1.2 Whether the hanging objects on the rooftop are in danger of being blown down by the wind.

1.3 Whether the sky-mounted billboard is solid.

1.4 Whether the billboard on the exterior wall is solid.

1.5 Prepare emergency supplies and tools such as sandbags, wooden boards, and ropes.

2. The Engineering Maintenance Department will arrange for dedicated personnel to conduct a comprehensive inspection of the building body, public facilities, mechanical and electrical equipment, and computer room, focusing on the following items.

2.1 Whether the doors and windows of the equipment room are closed (the focus is on the generator room, elevator room, air conditioning room, water pump room, power distribution room and other equipment rooms).

2.2 Whether the drainage outlets on the ceiling, balcony, podium, rainwater wells, and sewage wells are smooth.

2.3 Ensure that the generator is in normal standby status, has sufficient fuel, and conducts a trial run test.

2.4 Check whether the basement sewage pump is working normally.

2.5 Prepare emergency supplies and appliances such as submersible pumps and temporary wiring boards.

(3) When strong winds and heavy rains come

1. When heavy rains come, ensure that floor drains and ditches are drained smoothly. When the wind force increases, use sandbags to block the positive impact of the wind on the community. Residential glass doors and other doors and windows.

2. During strong winds, if the wind pressure is too high and affects the normal operation of the elevator, the operation of the elevator can be suspended.

3. During strong winds, inspections should be strengthened. There may be falling objects from high altitudes, and some affected areas can be temporarily closed. The closure can only be lifted after the danger is eliminated.

4. Situation tracking

4.1 When the relevant departments issue strong wind and heavy rain warnings, the management office will arrange for dedicated personnel to watch (listen to) the latest news on stations and heavy rains issued by the meteorological department.

4.2 The management office will promptly arrange corresponding personnel on standby based on the latest information released.

5. Control of employees during strong winds and heavy rains

5.1 All order maintenance personnel are not allowed to take leave and go out, and are on standby.

5.2 All employees in the management office are not allowed to turn off communication tools and are on call at any time.

5.3 When the meteorological department hoists a black rainstorm warning or a red gale signal, the supervisor of the management office, the supervisor of the engineering maintenance department, and the supervisor of order maintenance should be on site and be on duty 24 hours a day. The central control duty room will activate the fire broadcast announcement. notice.

5.4 When the wind reaches level 6 or above, maintenance personnel should promptly remove the door guard bar to prevent it from being blown by the wind and injuring people and vehicles.

(4) Treatment after strong winds and heavy rains

The management office arranged for personnel to clean up the scene, proactively visited the affected owners, and assisted the affected owners to restore normal office order in the shortest possible time.

Thunderstorm Property Emergency Plan 2

1. Division of responsibilities of each position

l. The Security Department shall conscientiously carry out information transmission, resource allocation and related logistics support during storm emergencies.

2. The engineering maintenance department is responsible for faults and emergency treatment of mechanical and electrical equipment such as water supply and drainage, power supply, air conditioning, and elevators.

3. The public security and fire protection department of the property service company is responsible for emergency response to "three preventions", safety and security, voluntary firefighting, etc., and is also responsible for disaster relief.

4. The cleaning and greening department is responsible for greening, environmental disaster protection and post-disaster recovery work.

2. Typhoon, flood prevention and emergency response

1. After the property service company receives the typhoon or rainstorm warning signal, it should immediately mobilize urgently, and all departments are in a state of emergency. At the same time, A temporary three-prevention command center is established with the manager of the command group as the general commander and the heads of each department as members. Relevant personnel should implement a 24-hour duty system to make preparations for flood prevention and disaster relief.

2. Before the arrival of typhoon or heavy rain, various wind and water-proof measures should be taken, such as: emergency wind-proof and water-proof work, closing the doors and windows of the apartment, checking and cleaning the flood drainage equipment , facilities, advertising signs, flower pots, etc.

(1) Check all doors and windows, especially double glass doors, to see if they are adequately protected and stable.

(2) Secure all easily loose objects, especially those located on rooftops and balconies. Objects that are easier to blow over, such as flower pots, should be moved indoors or tied tightly.

(3) Check all water channels, manholes, storm drains, etc., and remove garbage, sediment and debris that may cause siltation.

(4) Ensure that all emergency equipment can be used at any time, such as sandbags, raincoats, helmets, water boots, ropes, backup lighting, square wood (used to fix glass doors), etc.

(5) Check whether the drainage pump system is normal and smooth.

(6) Check whether the power generation system and its oil supply device are normal, and test-develop the generator set according to regulations.

(7) Turn off the neon light power.

(8) Whether the intelligent system equipment is operating normally.

(9) After the inspection is completed, any problems found should be solved in a timely manner. If there are any problems that cannot be solved, they should be reported to the leader immediately.

3. When typhoons or heavy rains occur, the security guards on duty will strengthen inspections of key areas and parts for wind protection and waterproofing, check the conditions of doors and windows, and rush to the scene as quickly as possible if there is a sign of broken window glass. And temporarily blocked with boards. Maintenance personnel from the Engineering Department are on standby, and management and service personnel at all levels remain at their posts. If there are complaints about equipment failure or potential accidents are discovered, emergency measures should be taken to resolve them in a timely manner.

4. Staff at all levels assist maintenance technicians in flood drainage and discharge of accumulated water.

5. Prevent criminal cases from occurring during natural disasters such as typhoons and floods.

3. Post-disaster treatment

After typhoons and thunderstorms, the Engineering Department organizes maintenance personnel to inspect the equipment and facilities under its jurisdiction, discover damage and repair it in time. The cleaning department inspects the condition of damaged trees and restores them, striving to minimize the impact of the disaster. The property manager shall promptly report the disaster and loss situation to the general manager of the company. Thunderstorm Property Emergency Plan 3

1. Attach great importance to thinking.

All sectors and departments in the city must fully understand the current severe situation faced by the city’s flood control, overcome the paralysis of taking chances, and regard flood control as a major event to maintain social stability and promote economic development. The safety of people's lives comes first. The main leaders of each sector must personally take the lead, make careful arrangements, go deep into the front line, do a good job in the inspection and implementation of flood prevention, effectively strengthen the organizational leadership of flood prevention, improve the organizational structure, clarify the division of responsibilities, and be based on preventing major floods, rescuing major dangers, and rescuing. For major disasters, we need to deepen and improve our understanding, redeploy and launch our work, and strengthen and implement our measures.

2. Ensure normal social order.

The water conservancy department must try its best to reduce the water level of inland rivers and reduce flooded areas as much as possible. All sectors and relevant departments must immediately carry out comprehensive and in-depth flood control safety inspections.

First, we must conduct a comprehensive inspection and maintenance of the city's existing drainage facilities, conduct a comprehensive inspection of the rivers, drainage pipe networks, culverts, rainwater wells, and drainage pump stations in the city, and clean them as soon as possible. Siltation, dredging and maintenance work to ensure smooth drainage. Special personnel should be assigned to road sections, areas and key road sections prone to water accumulation, and forces should be organized to patrol the roads. If water blockage or water logging is found, measures should be taken promptly to ensure that the water is discharged in a timely manner and the roads are kept smooth.

The second is to check the safety status, reinforcement measures and emergency evacuation plan implementation of dilapidated houses and public places. For houses with potential safety hazards, people must be evacuated in a timely manner and rectified within a time limit.

The third is to strengthen special inspections of construction sites under construction, strengthen guidance and supervision of flood prevention work at construction sites, and focus on inspecting the implementation of flood prevention measures in key parts and facilities such as foundation pits, slopes, tower cranes, and scaffolding. .

The fourth is to inspect flood prevention and rescue measures for water supply, roads, bridges and other infrastructure, and implement emergency measures for water supply, public transportation, and gas supply safety to ensure that the daily life of urban and rural residents during the flood season is not affected. The fourth is to strengthen the guarantee work for the high school entrance examination. The education department and local governments must make every effort to strengthen emergency protection during the high school entrance examination to ensure the safety and smoothness of the city's high school entrance examination.

The fifth is to strengthen guidance and services for agricultural production, try to reduce the extent of agricultural disasters as much as possible, and ensure timely settlement of agricultural insurance claims while ensuring the smooth progress of summer planting.

3. Master the flood and rain conditions.

The municipal meteorological department should strengthen the rain forecast and alarm mechanism, and the municipal flood control headquarters should be on the front line to command, keep abreast of flood conditions, water conditions and dangers, and deal with possible problems in a timely manner. For major Dangerous situations must be reported in a timely manner to ensure timely, smooth and accurate communication of flood and rain conditions. Thunderstorm Property Emergency Plan 4

In order to better implement the flood prevention policy of “safety first, always be prepared, focus on prevention, and make every effort to rescue”, ensure the safety of colleagues, and strengthen the awareness of life first, To achieve early deployment and early prevention, and effectively carry out safety work in the building during the flood season, this plan is specially formulated based on the actual situation of our school.

1. Preparations for safely crossing the flood

Put prevention first and establish prevention and control awareness. We must put the safety of colleagues' lives first, overcome paralysis and luck, establish the idea of ????"rather trusting what we have than trusting what we don't have" and the viewpoint of "everything will be established if it is given, and it will be destroyed if it is not given", and strengthen the building of a good building The sense of urgency and responsibility in flood prevention work must be closely focused on this year's flood season, and in accordance with the flood prevention plan, we must do a good job in flood prevention and disaster relief at all stages and links before, during, and after the flood. We must carry out in-depth investigation, effective rectification, careful deployment, and strict prevention to ensure that all flood prevention measures in the building are implemented.

It is necessary to establish a responsibility system for safe flood crossing inspections, clarify responsibilities and tasks, and conduct safety inspections before the flood season arrives. Organize efforts and designate a dedicated person to conduct a comprehensive and detailed inspection of the school building walls, drainage ditches, back hills, including the surrounding environment. The inspection situation must be recorded in detail, especially the existing hidden dangers, and the existing hidden dangers must be registered and summarized to submit the building research and improvement plan. Building leaders must carefully analyze and understand the main safety hazards currently existing in the building. They must propose rectification plans and preventive measures for the identified safety hazards one by one, and designate specific responsible persons for implementation. Develop practical plans. It is necessary to formulate a targeted emergency response plan for the flood season based on the actual situation of the building, especially the existing hidden dangers, to ensure the practicality of the plan.

According to the rescue requirements of possible dangers, prepare rescue supplies and equipment in advance for emergency use. Strengthen inspection and supervision of key parts during the flood season. Sufficient emergency repair forces must be available during the flood season to effectively prevent emergencies during the flood season.

2. Emergency response to survive the flood safely

1. After the building receives an announcement from the superior government to make emergency flood prevention preparations, or according to the typhoon emergency warning that a disaster is imminent, the typhoon prevention leader The team will issue an emergency notice for typhoon prevention, activate the building's emergency plan for disaster prevention and relief, arrange disaster prevention work, and enter a state of emergency to carry out various emergency work.

2. Each school should organize and implement an emergency response plan based on the actual situation of disaster prevention and relief in the school, carry out disaster prevention and relief work in the school in accordance with the settings of the disaster prevention and relief agency, and assist each working group in carrying out rescue and rescue operations. action.

3. Highlight the key points and complete the rectification within a time limit

1. The geological conditions around the building, especially the mountain behind the building, may collapse. Protection work should be carried out as soon as possible, and a safe and sound Improve the inspection and monitoring system, and designate responsible persons to observe and monitor regularly or irregularly. If new changes or dangers are found in the geology, the transfer should be organized and the classes should be suspended. At the same time, the reports should be reported level by level in a timely manner, and relevant measures should be taken to eliminate risks. .

2. The building encounters dangers such as flooding or rising water levels. It is necessary to strengthen the education of students' risk avoidance knowledge and self-protection. They should not wade through streams, streams, or rivers, let alone risk crossing streams; they should memorize building emergency signals, emergency diversion routes and locations; they should organize carefully Colleagues learned about disaster prevention and relief during flood season and improved their self-protection capabilities.

3. Dangerous buildings are prone to collapse in the event of a strong typhoon. People must be evacuated. Those that can be demolished should be demolished in time. Those that cannot be demolished temporarily should be closed. Warning lines should be drawn, danger warning signs should be marked, and monitoring should be strengthened. .

4. Building drainage facilities should be inspected and cleaned regularly to ensure smooth flow. Especially in low-lying buildings, buildings should pay close attention to climate change and do a good job in flood prevention and self-protection in the event of disastrous weather.

5. The standardized setting of power lines on campus, such as aging, excessive collapse, low setting, etc., must be rectified, and the layout and safety settings must be standardized.

4. Prevent accidents and ensure a safe flood season

Strengthen organizational leadership. The building should set up a building safety working group during the flood season, with the principal as the team leader, responsible for the investigation and analysis of hidden dangers, and arranging corrective measures. , designate the project leader, follow up and supervise the rectification and completion within a time limit; organize the revision and drill of the plan, and provide ideas for emergency response. In the event of disastrous weather, the main leaders must be at their posts and command from the front to strictly prevent various accidents, especially to prevent responsible accidents. The Central Building will organize supervision on the implementation of the building's flood control responsibility system. If responsibilities are not fulfilled and responsible accidents occur during the flood season, the building leaders and relevant responsible persons will be resolutely held accountable in accordance with the relevant provisions of the administrative liability investigation system for safety accidents. Thunderstorm Property Emergency Plan 5

Floods are more powerful than tigers. Prevent disasters before they occur and ensure safety. In order to welcome sudden floods in summer and ensure the safety of life and property of campus, teachers and students, this plan is specially formulated.

1. Guiding ideology

Guided by the principle of cherishing life and safety first, fully implement the requirements of the Daiyue District Work Conference, strictly grasp the weather and climate changes during the flood season, and start on time This plan ensures little or no loss when a major disaster strikes, and provides strong protection for the life and property safety of teachers, students and the school.

2. Flood prevention measures

1. Pay close attention to weather and climate changes, keep abreast of weather forecasts, reasonably arrange the work and study life of teachers and students, and be ready to respond to emergencies at any time Prepare.

2. In case of heavy rain, the school should send special personnel to guide students to and from school to prevent students from walking on their own. They must contact their parents before withdrawing. (Each class teacher)

3. When a flood occurs, this plan should be activated immediately and the rescue commando team should be directed to enter a combat rescue state. (All male teachers)

4. If a flood occurs during class, the command team should, under the command of a unified order, reasonably guide students to move to safe areas and do reasonable work to prevent risks.

5. After a disaster occurs, all teachers should focus on student safety and immediately enter the situation to ensure road traffic, communications, alarm, rescue, and maintenance.

3. Flood Control Leading Group

Team Leader: Shi Yong

Team Members: Shi Jinjun, Yang Ruming, Wu Jianling, Li Hong

Flood Control Leadership Responsibilities of the team:

Responsible for inspecting and supervising the flood prevention work of each school; researching and formulating flood prevention plans according to the flood situation; directing the flood control and anti-flood rescue team to carry out rescue operations; responsible for reporting the flood situation and handling situation to superiors; coordinating and cooperating with relevant departments Do a good job in rescue work; do a good job in dealing with the aftermath.

The leadership group has an office responsible for handling daily work. The office is located in the General Affairs Office.

4. Responsibilities of each functional group

Command team: Shi Yong

Responsibility: Arrive as soon as possible in the event of regional excessive flood disasters At the scene, under the unified arrangement of the Flood Control Headquarters of the Education Bureau, a flood prevention and relief work plan was launched.

Correspondence Team: Zhang Zhen

Responsibilities: Coordinate non-disaster-stricken schools to rescue disaster-stricken schools, organize relevant personnel to maintain school order, strengthen security, and protect the safety of teachers and students and the integrity of educational assets. suffer losses.

Diversion team: Shi Jinjun

Responsibilities: Make flood prevention preparations in advance, postpone or advance the school time according to the flood situation, and organize students to take refuge in safe places (second to fourth floors) Classroom), teachers or parents can be organized to escort students home if necessary.

Rescue Team: Li Hong

Responsibilities: Responsible for the rescue and emergency medical care of injured and injured patients, and sending them to the hospital for first aid.

Equipment support team: Zhang Yongjun

Responsibilities: Coordinate the medical team, prepare medical equipment and drugs, and participate in rescue at any time.

Drainage team: Zhang Bo

Responsibilities: Actively participate in and organize teachers to carry out drainage work, and make good use of equipment and tools to drain water in a timely manner.

Liaison Group: Wang Fengqin

Responsibilities: Once a flood occurs, the school must immediately report the flood situation to the relevant departments and take the initiative to take effective and effective measures.

5. Materials and work security

1. The school should prepare sufficient shovels, woven bags, lighting tools, portable microphones, etc. and store them temporarily for call at any time.

2. Comprehensively inspect dangerous houses, dangerous toilets, and dangerous walls, conduct self-inspection and rectification first, and accept inspections from superiors at any time to nip hidden dangers in the bud and ensure the safety of buildings during flood season.

3. During the flood season, schools must strictly implement the 24-hour duty system during the flood season and establish a flood and disaster reporting system and recording system. The communication telephone numbers of all leaders of the Education Bureau and the main leaders of the schools directly under them should be kept in normal condition at all times. To ensure smooth flow of flood conditions. Thunderstorm Property Emergency Plan 6

In order to conscientiously implement the policy of "prevention first, prevention is more important than robbery" in flood prevention work, and ensure the safety of people's lives and property and central facilities, we must do a good job in all aspects To prepare for floods and ensure normal living and working order, this plan is formulated.

1. Organizational Leadership

In order to effectively strengthen the organizational leadership of flood prevention work, it was decided to establish a team with Director Jia Zhiyan as the team leader and Deputy Directors Chen Zuxin and Liang Jing as deputy team leaders. The flood prevention work leading group, composed of heads of various departments and employment centers (list attached), is responsible for the organizational leadership and work coordination of flood prevention work.

2. Plan preparation

(1) Flood prevention period

The flood prevention period is from May 1st to October 1st every year.

(2) Key parts

The key parts of this bureau’s flood control are the fire escapes on the first floor and backyard of the compound, various drainage ditches (mouths, holes), and building roofs.

(3) Flood prevention measures

1. Conduct a comprehensive inspection of the above key locations one by one in early May;

2. Conduct a comprehensive inspection of existing hidden dangers in mid-May Take remedial measures in a timely manner to ensure that all drainage ditches (mouths and holes) are unobstructed;

3. Maintain relevant facilities before the end of May, and inspect facilities that are prone to cracking, falling, or breaking (breaking). Reinforce or replace;

4. Before the end of May, all related office supplies or items that are in direct contact with the ground such as offices and warehouses on the first floor and are prone to moisture, moisture, and perishability should be paved or disposed of at high temperatures; < /p>

5. Prepare flood prevention equipment. Before the end of May, in addition to the existing flood control equipment and equipment, equip them as soon as possible according to the needs of flood control work;

6. Pay attention to the meteorological information. Starting from May 1st, pay attention to collecting and mastering meteorological information from TV, radio, newspapers and other news media at any time, and take preventive measures in advance in case of possible abnormal weather or heavy rainfall;

7. Strengthen shelter Flood prevention work. During the flood prevention period, flood prevention work at employee residences shall be subject to the unified arrangements and commands of the flood prevention headquarters or property management unit of the street where they are located.

(4) Formation of a flood prevention and rescue team

Flood prevention and rescue team members shall be those who are healthy, young and capable, have a high sense of responsibility and certain experience in flood prevention and rescue among existing employees. In times of danger, the flood prevention and rescue team is specifically responsible for flood prevention and rescue work under the command of the bureau's flood prevention leading group (list attached).

3. Flood prevention duty

Implement a safety duty system during the flood season and set up a flood prevention duty telephone number to ensure that superior information is given to the public and low-level information is reported. Thunderstorm Property Emergency Plan 7

1. Basic situation

Hejiaping Village is located along National Highway 309, 2 kilometers west of Zhiluo Town, with the Qinglan Expressway passing through it. There are 89 households with 379 people in the village, including more than 20 migrant workers and businessmen; there are two natural villages, Hejiaping and Yanjiacun. Six members of the two village committees are at home, and there are 14 party members in the village. There are 4 dilapidated houses in the village, all of which are civil structures and in disrepair. They are often affected by natural disasters such as heavy rains.

After investigation, there are currently 23 houses in danger of disaster in the village, and 10 people live in the dangerous houses, including 10 permanent residents.

2. Follow the principles

(1) People-oriented.

Ensuring the safety of people’s lives is the starting point and final goal of flood prevention and geological disaster prevention and control work. By taking effective measures and implementing various typhoon prevention responsibilities, we can minimize casualties caused by natural disasters.

(2) Take precautions first.

Effectively prevent the occurrence of various natural disasters. For those that cannot be prevented or have already occurred, try to avoid their adverse effects and catastrophic consequences as much as possible.

(3) Respond quickly.

Implement the working mechanism in which the village branch secretary is generally responsible for flood prevention and geological disaster prevention work. After receiving the town flood prevention information, the village's flood prevention plan must be fully launched in a timely manner.

(4) Public participation.

Give full play to political and organizational advantages, focus on group prevention, group control, and group rescue, and conduct extensive analysis, prevention, and reporting of potential hazards in the village before the incident

Police, etc. work; accurately issue early warnings and deal with natural disaster-related work when an incident occurs; organize available forces to carry out reconstruction and aftermath work after the incident.

3. Flood Prevention Plan

(1) Responsibilities of the Village Prevention Office:

1. Receive flood prevention information from superiors and communicate it in a timely manner and publish it in the village affairs disclosure column Post announcements;

2. Strengthen publicity and mobilization, and make various preparations for flood control during the flood season;

3. Timely and properly relocate dangerous buildings, geological hazards and other unsafe buildings according to local conditions All persons involved in the factors;

4. Timely report the village’s flood control work and disaster-stricken conditions in the village to the town prevention office;

5. Organize and mobilize the masses to carry out post-disaster self-rescue work.

(2) Division of work of the Village Flood Control Office:

1. After receiving the heavy rain warning information from superiors during the flood season, the Village Flood Prevention Office was quickly put in place, and the branch secretary Shi Huaqin led the branch members to congratulate them. Jiaping distributed heavy rain information and arranged for the transfer of personnel (see the attached table for details); village director Li Yuanbao led the village committee members to Yanjia Village to distribute heavy rain information and arranged for the transfer of personnel (see the attached table for details). After the personnel are resettled, logistics support and health and epidemic prevention work for the resettled personnel shall be done well.

2. After the registered personnel are transferred and resettled, a one-to-one tracking service system will be implemented until the rainstorm warning is lifted. In the event of an emergency and it is difficult to continue the resettlement implementation in the village, you should contact the town flood control headquarters in a timely manner and do your best to implement the transfer and resettlement work.

3. Each group is required to implement a patrol system at intervals to help the village reduce all losses while ensuring their own safety.

4. Emergency Rescue

Establish a village emergency rescue leading group: the leader is Shi Huaqin, the deputy leader is Li Yuanbao, members: Wang Gaicheng, Yang Yubao, Li Yalin, Li Hong, He Yongwen .

Specific division of labor:

1. Emergency rescue team: Persons in charge: Shi Huaqin and Yang Yubao. After being in danger, they quickly organized more than 5 party members at home to rush to the scene of the accident. When the superior rescue personnel did not come, Go to the scene and protect the scene to prevent the situation from expanding further, and try your best to carry out rescue work.

2. Police evacuation team: Persons in charge: Li Yuanbao and Wang Gaicheng. After the incident, more than 5 villager representatives at home were quickly organized to safely evacuate the surrounding people in distress from house to house. It is required to do a good job of persuasion carefully and patiently, and strive to protect the safety of people's lives and property.

3. Logistics support team: Persons in charge: Li Yalin and Li Hong. They are responsible for food supply and resettlement of victims after the disaster, and implement vehicle dispatching and contact with superiors. In addition, we actively used the power of the masses to provide the supplies, tools and other equipment needed by the emergency rescue team as soon as possible. Thunderstorm Property Emergency Plan 8

In order to ensure that when heavy rain and flood disasters occur within the group area, the emergency response work can be carried out in a coordinated, efficient and orderly manner and to ensure the safety of people's lives and property, this plan is specially formulated.

1. Organizational structure

The xx Group’s heavy rain and flood prevention emergency response leadership group was established, with the following members:

Team leader: xxx

Deputy leader: xxx

Member: xxx

The leadership group consists of seven working groups, an office and a supervision group.

Establish a leading group office for heavy rain and flood prevention emergency work.

Set up an inspection team for emergency response work on heavy rain and flood prevention.

2. Division of Responsibility Areas

Comrade XX, the leader of the group’s leadership group, is responsible for the group’s overall flood prevention and prevention of heavy rain and flood disasters; the first working group is responsible for the flood prevention and prevention of xx Agricultural Trading Company Heavy rain and flood disaster work; the second working group is responsible for the flood prevention and heavy rain flood disaster prevention work of the xx agricultural trading company; the third working group is responsible for the flood prevention and heavy rain flood disaster prevention work of the farmer's market, entertainment venues, xx mountain residential area, xx pool residential area; The fourth working group is responsible for flood control and prevention of heavy rain and flood disasters in middle schools, primary schools, and hospitals; the fifth working group is responsible for flood prevention and prevention of heavy rain and flood disasters in industrial and sideline units (including private enterprises); the sixth working group is responsible for...agricultural trade The company's flood prevention and prevention of heavy rain and flood disasters; the seventh working group is responsible for the flood prevention and prevention of heavy rain and flood disasters at the Democratic Agricultural Trading Company and the breeding farm; the heavy rain and flood prevention emergency work supervision team is responsible for supervising the seven working groups and the prevention of each secondary unit Implementation of measures for heavy rain and flood disasters. The Office of the Leading Group for Heavy Rain and Flood Prevention Emergency Response is responsible for coordination among various working groups and submission of materials. Each secondary unit establishes a corresponding leadership group to formulate work plans and clarify responsible areas, responsible personnel and work responsibilities.

3. Key points and work requirements for early warning and prevention

1. Strengthen safety management of middle and primary schools, comprehensively investigate and eliminate potential safety hazards that heavy rains and floods may bring to schools, especially Implement key monitoring of student apartments, teaching buildings, canteens, and toilets, as well as primary school teaching outlets, deal with hidden dangers in a timely manner, and report to the group's heavy rain and flood emergency response leadership group. When there are potential safety hazards in teaching buildings, school cafeterias, and student apartments, emergency repairs will be organized after classes are suspended.

2. Strengthen the safety monitoring of residents’ houses and villagers’ houses. Each working group implements the leadership responsibility system according to the area of ??responsibility, urges relevant units to clarify work responsibilities, formulate work plans, conduct comprehensive inspections of residents' housing and villagers' housing safety hazards village by village, household by house, and area by area, promptly inform residents or villagers of any discovered situations, and take measures to Corresponding measures will be taken to ensure the safety of residents and villagers. Pay close attention to the housing and auxiliary facilities of "five-guarantee households", "difficult households", "migrant households" and vulnerable groups, and help them eliminate safety hazards.

3. Strengthen corporate security monitoring. Comprehensively investigate potential safety hazards in the company's production areas, living areas and auxiliary work areas, and promptly rectify any problems found. If any unit fails to cooperate, it will be forced to suspend operations for rectification. There is a possibility of landslides on the mountain next to the third production line of xx Decoration Materials Company, and the companies are urged to take corresponding measures. The construction of the project under construction in Zhongke Industry was stopped during heavy rains and floods,...and other companies have varying degrees of safety hazards, and they will be investigated one by one to ensure The life safety of enterprise employees.

4. To ensure that the Shantang Reservoir can safely survive the floods, XX Pond and XX Lake will have people on duty 24 hours a day, and when the water level reaches the warning line, the flood will be released in a timely manner... etc. The Shantang Reservoir of the agricultural trade company will have people on duty every day. Conduct inspections to ensure both water storage and flood discharge.

5. Strengthen safety management in public places. The municipal management office monitors the safety of farmers' markets around the clock and promptly reports any hidden dangers to the group's main leaders and the rainstorm and flood prevention emergency working group.

Internet cafes are closed when heavy rains are concentrated.

6. Strengthen the management of power supply facilities. The power company is fully responsible for the high-voltage lines and the low-voltage lines that have been taken over within the group area. The power-consuming units are responsible for the safety of electricity in the area. Each unit must do a good job in publicizing lightning safety knowledge.

4. Strict work discipline

Members of each working group must go deep into the area of ??responsibility to lead and supervise the relevant units in the area of ??responsibility to implement the work responsibility system. For accidents caused by absence, relevant leaders will be held accountable in accordance with the law.

5. Make arrangements for duty and report the situation of heavy rain and flood disasters in the area as required

1. The group’s emergency duty room for heavy rain and flood prevention is located in the group’s guest house.

2. Each secondary unit will arrange personnel on duty from August 8 to October 11. The specific list of personnel on duty shall be reported to the group for filing. Report the disaster situation to the Group's Heavy Rain and Flood Prevention Emergency Duty Room at 10:30 am and 15:30 pm every day. Major disaster hazards should be reported to the Group's Heavy Rain and Flood Prevention Emergency Duty Room at any time and reported to the Group's main leaders.

3. The group’s emergency duty room for heavy rain and flood prevention and the duty rooms of each secondary unit must keep duty records for future reference. and keep records clean and complete.