Joke Collection Website - Mood Talk - Six things you must know about bathroom decoration. Maybe you need to rework it. Don't say I didn't warn you.

Six things you must know about bathroom decoration. Maybe you need to rework it. Don't say I didn't warn you.

The decoration of the bathroom is very important. Most of the dissatisfaction after check-in is because the bathroom decoration is not in place, which will lead to rework and maintenance.

When decorating the bathroom, we must think carefully, consider what we should think and what we should not think, and then communicate with the construction master what we can and cannot do.

Next, I will talk about my experience, hoping to help you get rid of the trouble of rework and maintenance after moving in.

"One" check valve

As long as you install Yuba in the bathroom, the check valve must be installed. At this stage, you should also keep an eye on the scene to avoid the master fooling you.

Let the master connect the exhaust pipe of Yuba to the ventilation pipe, and remember to add a check valve in the middle to effectively prevent odor from entering the bathroom.

I didn't know when I first renovated it. There was no check valve in the bathroom. Instead, I directly connected the Yuba exhaust pipe to the Qi Huan pipeline. I guess I fell behind.

"Two" Air-heated Bathmasters

If the position of the wind-hot yuba is pressed incorrectly, the effect is really different. It is necessary to install an air-cooled bath bully next to the shower area, which is more effective.

"three" soundproof cotton

The sewer pipe in the bathroom must be wrapped with sound insulation cotton to avoid being disturbed by the sound of running water. The first time I didn't understand the sound insulation cotton wrapped directly, I found it useless at all.

The second time, I directly wrapped the first layer with shock-absorbing damping sheet, and then wrapped it with soundproof cotton. The sound is really lowered, and I am not afraid of being awakened by the sound of running water at night.

"Four" floor drains

At first, I bought a floor drain with flip core, but I found it still smells. Later, I learned that the shower area should be sealed with deep water, and the floor drain cores used in different areas are different ~

"Five" socket

If you want to install a bathroom cabinet, you must reserve a socket to facilitate the later use of mirror cabinet lights. I didn't think so much at that time, so I didn't keep it. After the bathroom cabinet is installed, the plug can't reach the socket at all, and the lamp becomes a decoration.

"VI" water inlet

The water inlet here refers to the interface where the angle valve and shower are installed. The interface must be sealed with glue first, so that even if there is water leakage later, the water will flow to the outer wall.

If you don't block it with glue, running water will seep into the cement on the wall, and the wall bricks will empty and fall off after a long time.