Joke Collection Website - Mood Talk - Who can tell me more about coefficient bidding and list bidding?

Who can tell me more about coefficient bidding and list bidding?

There are many problems.

So, start answering.

Let me take Fujian Province as an example for your reference.

1, the bidding process of this project mainly includes:

0 days after the owner confirms the bidding documents and announcement.

B, including the following contents for 20 days

Announcement release

Tender documents for sale (at least 5 working days)

Issue a clarification document (it must be 15 days before the deadline for bidding, and no ambiguity is allowed in one day).

Deadline for bidding

Bid opening and evaluation

C, calibration (depending on the will of the tenderer, the winning bidder will be determined on the same day)

D, the bidding results publicity (Fujian province bidding regulations new provisions. It used to be 3 working days) 10 days.

E, 65438+ 0 days after issuing the bid-winning notice.

Total above: 32 days

When communicating with the owner, you must go through the formalities before: a, project approval; B, construction drawing review qualified; C, bill of quantities (also can be completed by the bidding agency); D, proof of funds in place (Fujian characteristics, in fact, is the bank statement); There are also planning permits, fire audit reports and other dispensable items. In addition, to enter the tangible market of construction, the owner needs to pay the transaction service fee to the trading center, and the local property Committee has the specified value.

2. About the bid evaluation method:

A. The lowest price method after evaluation: the bidding documents with the highest control price of A and the lowest control price of B, and the total bid price not higher than the highest control price and not lower than the lowest control price, shall be evaluated according to the total bid price from low to high, and the first successful bidder shall be qualified and lowest.

For details, please refer to Minjian [2005] No.69 Notice on Printing and Distributing the Provisions on the Method of Winning the Bid with the Lowest Bid Price after Evaluation for the Construction of Housing Construction and Municipal Infrastructure Projects in Fujian Province (Trial).

B. Comprehensive bid evaluation method: usually divided into three scores: comprehensive strength, construction organization design and bid quotation. The quotation has the greatest weight, for example, the above scores are 5 points, 10 points and 85 points respectively. Fujian Province advocates that comprehensive strength and construction organization design are qualified conditions, and only the quotation is considered when calculating the score.

There are many formulas, all of which can reflect fairness. Provide a common formula for calculating quotation: score =85-| All qualified bidding quotations-bid evaluation benchmark price |/bid evaluation benchmark price × 100×Q, where: 85 is the highest quotation score; Bid evaluation benchmark price = control price ×C+ average price of all qualified bids × 1-C(C is a number between 0- 1); Q is the discount factor, usually between 0 and 6 (there is no hard and fast rule, which means the score to be deducted for every deviation from the benchmark price 1%. )

3. Follow-up work after determining the candidate winning the bid and issuing the bid-winning announcement:

A, send the bid-winning notice (issued by the trading center, mainly to let the winning bidder pay the transaction service fee to the trading center at the same time of obtaining the bid-winning notice, and the local property management committees have specified values);

B, the project is generally traded in the building tangible market (construction engineering trading center), and the trading center needs to keep copies of materials (copies of all forms and statements during the bid evaluation+copies of the bid documents of the winning bidder, and the original shall be kept by itself);

C. Party A also needs copies of the above materials;

D submit the bidding process report to the bidding office (construction bureau) within 15 days, and attach a copy of the above materials;

The main archival materials are:

Engineering construction report form

have a project registered and authorized

Examination and approval of construction drawings

agency contract

Transaction registration form

announcement of tender

entry form

Bidding documents and bill of quantities (including electronic documents)

Answer minutes

Supplementary notice

Bid opening and evaluation scheme

Singing record

List of bid evaluation experts

Pre-tender estimate and control price information (including electronic documents)

Bid evaluation data

Bid evaluation resolution

bid notice

Bidding documents (including electronic documents)

Tender notice

Report on the bidding process

4. Determine the price of bidding documents and supporting documents: you can set a price that is not too outrageous, usually hundreds to thousands. Local material committees have general regulations, such as cost price, not profit-making and so on.

5. The charging standard of bidding agency fee: stipulated in documentNo.. The State Planning Commission has calculated the price [2002] 1980, and the standards are as follows: project: less than 0 million 1.00%.

1-50,000 0.70%

500-100,000 0.55%

1000-50 million 0.35%

5000-1100,000 0.20%

10000- 1000000 0.05%

/kloc-more than 0/00000 million 0.0 1%

If the bid is 7 million, the service fee is:100 *1%+(500-100) * 0.7%+(700-500) * 0.55% = 49,000.

The state stipulates that the floating range of the above standards shall not exceed 20%.

Finally finished answering.