Briefly describe your safety construction responsibilities? How to do a good job of self-safety protection in combination with your own safety responsibilities?

Carry out the policies, laws and regulations of the state and higher authorities on the construction industry and the relevant rules and regulations of the company. Familiar with the national "Code for Acceptance of Construction Quality of Building Engineering" and enterprise technical standards. Be responsible for the construction quality of this project, and be responsible for the engineering technical quality and safety work.

Second, be familiar with the construction drawings, understand the general situation of the project, draw the site layout, and make the site layout well. Have a clear understanding and memory of design requirements, quality requirements and specific practices, and carefully organize the team to construct according to the drawings.

3. Be fully responsible for the construction site survey, measurement, construction organization and site traffic safety protection settings of this project, arrange the construction of temporary facilities and other engineering tasks, solve relevant problems in construction in time, and report to the higher authorities to ensure the construction progress.

4. Participate in the blue prints.the design, try to solve difficult problems in the drawings, and be responsible for contacting Party A and the design department when encountering major technical problems and properly solving them. Adhere to the construction according to the drawing, and write a written technical disclosure before the sub-project construction.

Five, participate in team technical disclosure, project quality, safety production disclosure, operation method disclosure. Strictly abide by the construction operation procedures, strictly control the quality, ensure safety, be responsible for the pre-job training of new workers, and educate and urge workers not to operate illegally.

Six, the preparation of unit engineering production plan. Fill in the construction log and concealed engineering acceptance record, cooperate with the quality inspector to sort out technical data and construction quality management, and issue the concrete and mortar mixture ratio of each part on time. Responsible for arranging the test of each sub-item.

Seven, responsible for the implementation of the construction plan, according to the total time limit for a project and the total construction progress plan monthly or ten-day construction plan schedule, and organize the corresponding construction team according to the plan, to ensure the project completed on schedule.

Eight, according to the construction plan, make the daily work arrangement of each construction team, make the dynamic table of labor force in advance, arrange the labor resources reasonably and organize the construction reasonably.

Nine, raw materials, equipment, finished or semi-finished products, safety protection supplies, etc. Do a good job in testing and re-examination. If the quality is inferior or does not meet the construction specifications and design requirements, it has the right to prohibit its use in the project.

Ten, in accordance with the provisions of the safety operation procedures and quality acceptance standards, organize teams to carry out quality and safety self-inspection, mutual inspection and handover inspection system, and strive to improve the technical quality and self-protection ability of workers. Safety protection devices, such as traffic safety facilities and mechanical equipment, set on the construction site can only be carried out after the organization has passed the acceptance.

Eleven, conscientiously do a good job of concealed engineering disciplines, division and unit project completion acceptance visa, collect and save the original technical data, and handle the engineering change manual. Responsible for the final report after the completion of the project. References: