What are the requirements for the preparation of bidding construction organization design?

What are the requirements for the preparation of bidding construction organization design? The following Zhongda Consulting Tendering Teacher will give you answers for your reference.

1. Legality

The "Bidding Construction Organization Design" is a legally binding "commitment" issued by the bidding unit to the bidding unit. Therefore, the bidding unit is required to stamp the official seal, have the signature of the legal representative, and deliver it in a sealed manner. Pay to the bidding unit or agency.

2. Technical

"Bidding Construction Organization Design" is a technical document that is discussed, written, and reviewed by professional engineers of the bidding company, and finally approved by the chief engineer. Therefore, there should be signatures of the preparer, reviewer, and approver. Otherwise, it can only prove that the company is out of control in terms of construction technology.

3. Targetedness

Each project has its characteristics of use function, structure type, geological conditions, and environmental and social factors. The construction organization design should grasp its characteristics and focus on description to be foreseeable for future construction. Where there are difficulties and it is not easy to guarantee, you should come up with your own solutions to specific problems. This can reflect the level of the enterprise.

4. Correspondence

The bidding documents put forward some specific requirements for the construction unit's bid. You must read the bidding documents carefully and give the other party a satisfactory answer. Never leave the bidding documents and ask three questions and four answers.

5. Dynamic

During the implementation process of "tendering construction organization design", it is a process of continuous modification and improvement based on the actual changing situation. Therefore, in the construction organization design during the bidding and bidding stages, only a general strategy is generally proposed. It will be further refined after winning the bid. Don't rush to solve all future problems at once, this is also impossible.

6. Relevance

Since "tender construction organization design" is the cooperation of various disciplines, it is necessary to handle the procedures and relationships between various disciplines. For example, when installing and dismantling formwork, when designing the plan, not only the installation but also how to dismantle it should be considered.

7. Processability

Construction organization design is a process in which enterprise technicians process all materials through their own mental work. It is not a matter of copying textbooks and specifications. Use empty slogans and guarantees as little as possible, and the key is to propose measures on how to guarantee them. It is clear what standards and specifications should be met, and what methods should be used to approach, meet or even exceed these standards.

8. Be careful not to plagiarize or copy.

Some bidding units do not know how to draft or try to save trouble by making a few copies of the construction organization design of other projects before bidding. The result of copying or plagiarizing can only be contradictions and jokes. Bid evaluators will see through it at a glance, so bidding in this way is worse than not bidding at all.

9. Seriousness

The text should be concise and to the point, the diagrams should be neat, the content should be complete, and the binding should be exquisite. Shows the bidder's respect for the bidder.

For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd