Joke Collection Website - Public benefit messages - Material Purchase Agreement
Material Purchase Agreement
Material Procurement Agreement
Material Procurement Agreement, the agreement is a very important thing. After all, when signing the agreement, everyone mainly wants to protect their own interests. If the agreement is not If you are qualified, you will lose the legal benefits and your own interests will not be protected. Therefore, you should pay attention to the legality of the agreement when signing the contract. Take a look at the Material Purchase Agreement. Material Purchase Agreement 1
Party A (demanding party): ________
Legal representative: ________
Party A’s company address: ________
Party A’s construction address: ________
Party B (supplier): ________
Legal representative: ________
Party B’s company address: ________
According to the "People's Republic of China** *The Contract Law of the People's Republic of China and other relevant laws and regulations, following the principles of equality, voluntariness, fairness and good faith, both parties reached an agreement on the purchase of construction materials and entered into this contract.
1. Product name, specifications, unit price, quantity and others
Serial number
Product or
Name of raw materials
Specifications and models
Unit
Unit price
(piece/yuan)
Demand
Remarks
Total amount: (in RMB capital letters)
The template is received according to the sample, and the entire board is used naturally and normally (Note: refer to the template usage instructions provided, the product qualification rate is 95) If there is a quality problem, such as a large area of ??glue peeling off, replacement is guaranteed, and one piece will be replaced.
2. The products or raw materials supplied by Party B must meet:
1. Meet the corresponding quality inspection and acceptance standards of xx province;
2. In accordance with Party A’s needs Specifications, brands, trademarks (origins of origin) and quantities shall be supplied in a timely manner;
3. Have product qualification certificates or related documents.
3. Delivery time and transportation
1. Party A shall inform Party B of the supply plan two days in advance. After Party B obtains the plan, Party B shall supply the goods within two days of Party A’s plan.
2. Party B is responsible for loading and transporting the goods and transporting them to the designated location: Party A is responsible for unloading the goods at the construction site. After the goods arrive at the designated location, Party A promptly sends a consignee to inspect the quantity of the goods and sign the delivery note for confirmation, which serves as the final basis for settlement between the two parties. (Settlement is based on the actual delivery quantity.)
IV. Payment method and time
Payment method and payment agreement: Within 7 working days one month after the goods arrive at the construction site Pay off this payment.
5. Party A’s liability for breach of contract
1. If Party A returns the goods midway, Party A shall pay Party B liquidated damages for the returned part of the payment 1.
2. If Party A makes late payment, Party A shall pay Party B the liquidated damages for overdue payment in accordance with the provisions of the People's Bank of China on deferred payment.
3. If Party A violates the provisions of the contract and refuses to accept the goods, it shall bear the resulting losses and fines imposed by the transportation department.
4. If Party A incorrectly fills in the delivery address or recipient, and raises a wrong objection to Party B, Party A shall be responsible for the losses suffered by Party B.
6. Party B’s liability for breach of contract
1. If Party B is unable to deliver the goods, it shall pay Party A a penalty of 2% of the payment for the part that cannot be delivered.
2. If the variety, specifications, and quality of the products delivered by Party B do not meet the regulations, if Party A agrees to use them, the price shall be determined based on the quality; if Party A cannot use them, the price shall be determined based on the specific conditions of the product. Party B is responsible for the replacement and the actual cost of return.
3. If Party B delivers goods overdue, Party B shall pay Party A the liquidated damages for overdue delivery according to the provisions of the People's Bank of China on deferred payment, based on the overdue delivery part of the payment, and shall bear Party A's liability for this. Damage expenses suffered.
7. Force Majeure
When either Party A or Party B is unable to perform the contract due to force majeure, it shall promptly notify the other party of the reasons for the inability to perform or the inability to fully perform, in order to alleviate the possible consequences to the other party. The losses caused shall be allowed to be postponed, partially performed or not performed after obtaining certification from relevant agencies, and may be partially or completely exempted from liability for breach of contract depending on the circumstances.
8. Others
Any liquidated damages and various economic losses that should be paid according to the provisions of this contract shall be paid in accordance with the settlement method prescribed by the bank within 10 days after the liability is clarified. Otherwise it will be treated as overdue payment. However, neither party shall withhold the goods or withhold payment for payment on its own initiative.
If a dispute arises under this contract, the parties shall negotiate and resolve it in a timely manner. If the negotiation fails, either party may request the competent authority for mediation or apply for arbitration to an arbitration committee, or may directly file a lawsuit in the People's Court.
9. This contract is made in two copies, one for the supplier and one for the buyer. This contract will take effect after being signed or sealed by both parties. This contract will be terminated after the payment is settled.
Demander (official seal) Supplier (official seal)
Legal representative Legal representative
Or its authorized agent: ____ Or its authorized agent: ____
____year____month____day____year____month____day Material Purchase Agreement 2
Contract number:
Purchaser: __________ (hereinafter referred to as Party A)
Supplier: __________ (hereinafter referred to as Party B)
Signing date: __________ Signing place: __________
In order to enhance the sense of responsibility of Party A and Party B, strengthen economic accounting, improve economic efficiency, and ensure that both parties achieve their respective economic goals, this contract is entered into after full consultation between Party A and Party B for the convenience of *** obey.
The first item is the name, brand, specification, quantity, unit price and delivery time
Name, trademark, specification, model, manufacturer, unit of measurement, quantity, unit price, amount, delivery time and quantity
Total RMB amount (in capital letters): ____________
Article 2 The quality standards of products shall be implemented in accordance with the following item (______):
(1) In accordance with national standards;
/p>
(4) If there is no above-mentioned standard, or if the above-mentioned standard exists but the buyer has special requirements, the technical conditions, samples or supplementary technical requirements agreed upon by Party A and Party B in the contract shall be followed.
Product standard name and number
Article 3 product packaging standards and supply and recycling of packaging materials:
Article 4 product delivery unit, Delivery method, transportation method, arrival location
1. Product delivery unit: ____________.
2. The delivery method shall be carried out according to the following item (______):
(1) Delivery by Party B
(2) Transportation by Party B
p>(3) Party A will pick up and transport the goods by itself.
3. Transportation method: ____________.
4. Arrival location and receiving unit (or recipient).
5. The on-site unloading is the responsibility of the operator.
6. Regulations and calculation methods for the positive and negative balance, reasonable weight difference, and natural decrease (increase) in transit of product delivery quantity:
Article 5 Delivery (delivery) of products ) Delivery period:
Article 6 Product price and payment settlement
1. The price of the product is agreed upon by both parties as ______ yuan/. During the contract period, if the market price of the transaction product changes significantly, and the amplitude exceeds ±10, the two parties will negotiate to adjust the price appropriately.
2. Settlement of product payment:
Article 7 Acceptance method:
(1. Acceptance time; 2. Acceptance means; 3. Acceptance standards; 4. Who is responsible for acceptance and testing; 5. Disputes occur during acceptance, etc.)
Article 8 Time and method for raising objections to products
1. During the acceptance inspection, if it is found that the variety, model, specification, design, color and quality of the product do not meet the requirements, it should be kept properly and a written objection should be submitted to Party B within days. Party A has the right to refuse to pay the payment for the part that does not meet the provisions of the contract.
2. If Party A fails to submit a written objection within the prescribed time limit (in an emergency, if Party A notifies the party by phone first and promises to submit a written objection within a specific time, it shall be deemed to have raised a written objection), it shall be deemed that the objection has been raised. The delivered products comply with the contract provisions.
3. Party A shall not raise any objection if the quality of the product deteriorates due to improper use, storage, or maintenance.
4. After receiving Party A’s written objection, Party B shall be responsible for handling it within ten days (unless otherwise stipulated or the parties agree otherwise). Otherwise, it will be deemed as acquiescence to the objection raised by Party A and Handle comments.
Article 9 Party B’s liability for breach of contract
1. If Party B is unable to deliver the goods, it shall reimburse Party A for the part of the payment that cannot be delivered (the range for general products is 1- 5. The liquidated damages for special products range from 10 to 30).
2. If the variety, model, specification, design, color, and quality of the products delivered by Party B do not comply with the provisions of the contract, if Party A agrees to use it, the price shall be based on the quality; if Party A cannot use it, the price shall be based on the product. In specific circumstances, Party B shall be responsible for replacement or repair, and shall bear the actual costs of repair, exchange or return. If Party B cannot repair or replace the product, it will be treated as non-delivery.
3. If Party B must repair or repackage the product because its packaging does not comply with the contract, Party B shall be responsible for the repair or repackaging and bear the cost. If Party A does not require repair or repackaging but requires compensation for losses, Party B shall reimburse Party A for the lower value of the unqualified packaging than the qualified packaging. If the goods are damaged or lost due to non-compliance with packaging regulations, Party B shall be responsible for compensation.
4. If Party B delivers goods overdue, Party B shall pay Party A the liquidated damages for overdue delivery according to the provisions of the People's Bank of China on deferred payment, based on the overdue delivery part of the payment, and shall bear Party A's liability for this. Damage expenses suffered.
5. For products delivered in advance by Party B, over-delivered products and products whose varieties, models, specifications, colors and quality do not comply with the provisions of the contract, Party A will actually pay for the storage and maintenance during the custody period. Party B shall be responsible for all other expenses and losses not caused by Party A’s poor storage.
6. If the product is shipped to the wrong destination or receiver, Party B shall not only be responsible for delivering it to the destination or receiver specified in the contract, but shall also be responsible for all actual overpayments made by Party A as a result. fees and liquidated damages for late delivery. If Party B unilaterally changes the transportation route and means of transportation without the consent of Party A, it shall bear the resulting increased costs.
7. If Party B delivers the goods in advance, Party A can still pay according to the delivery time stipulated in the contract after receiving the goods; if the contract stipulates that the goods will be picked up by itself, Party A may refuse to pick up the goods.
If Party B overdues the delivery, Party B shall negotiate with Party A before shipment. If Party A still needs it, Party B shall make up the amount and bear the responsibility for overdue delivery; if Party A no longer needs it, it shall notify Party B after receiving the notice. Notify Party B within fifteen days and go through the contract termination procedures. If there is no reply within the time limit, it will be deemed that the shipment has been agreed.
Article 10 Party A’s liability for breach of contract
1. If Party A fails to pick up the products on the date notified by the supplier or the date specified in the contract, the People’s Bank of China shall refer to Regarding the provisions on deferred payment, the total value of the payment for the overdue delivery shall be calculated as liquidated damages for overdue delivery to Party B, and Party B shall be responsible for the actual storage and maintenance costs paid by Party B.
2. If Party A incorrectly fills in the delivery address or recipient, or raises a wrong objection to Party B, Party A shall be responsible for the losses suffered by Party B.
Article 11 Force Majeure
When either Party A or Party B is unable to perform the contract due to force majeure, it shall promptly notify the other party of the reasons for the inability to perform or the inability to fully perform. After obtaining relevant After the competent authority proves it, it will allow delayed performance, partial performance or non-performance of the contract, and may be partially or completely exempted from liability for breach of contract depending on the circumstances.
Article 12 Others
The liquidated damages, compensation, storage and maintenance fees and various economic losses that should be paid according to the provisions of this contract shall be paid within ten days after the responsibilities are clarified. The payment must be made according to the settlement method prescribed by the bank, otherwise it will be treated as overdue payment. However, neither party shall withhold the goods or withhold payment for payment on its own initiative.
Ways to resolve contract disputes: All disputes arising from or related to the performance of this contract shall be resolved through friendly negotiation between Party A and Party B; if the negotiation cannot be resolved, the dispute shall be submitted to the party with jurisdiction. If a lawsuit is filed in a court of law, the litigation costs and attorney fees of the prevailing party shall be borne by the losing party.
This contract will take effect from the date of year, month and year. During the execution period of the contract, neither Party A nor Party B may change or terminate the contract at will. If there are any matters not covered in the contract, supplementary provisions must be made through mutual negotiation by both parties. The supplementary provisions shall have the same effect as this contract. There are two original copies of this contract, each party A and B will keep one copy; one copy of the contract will be sent to the competent departments, banks (if notarized or authenticated, it should be sent to the notary or authentication agency) and other units of both parties to keep one copy.
Purchasing unit (Party A): ______Suppliering unit: (Party B):______
Legal representative: ____________ Legal representative: ____________
Authorized agent: ____________ Authorized agent: ____________
Address: ____________ Address: ____________
Telephone: ____________ Telephone: ____________
Account opening bank: ____________ Account opening bank: ____________
Account number: ____________ Account number: ____________
Tax number: ____________ Tax number: ____________ Material purchase agreement 3
Party A:
Party B:
After friendly negotiation between Party A and Party B, based on the principle of equality and mutual benefit, in accordance with the "Contract of the People's Republic of China" In accordance with the provisions of the Law and relevant laws and regulations, we have now reached an agreement on the supply of production materials from Party B to Party A. In order to clarify the rights and obligations of both parties, this contract is hereby entered into:
1. Order product name:
2. Quantity of ordered products:
3. Quality standards:
1. Party A authorizes Party B to supply goods that meet national quality standards and Party A’s production requirements. Party B’s goods must comply with the specified standards and accompanying documentation requirements.
2.
4. Product specifications and prices:
1. __________________________________________________.
2. __________________________________________________.
5. Payment method: Both parties choose the following method to pay for the goods.
(1) Repeat order settlement. After the second batch of goods arrives at the designated location in Party A's factory, Party A will pay Party B the payment for the first batch of goods. From now on, the next payment will be settled by analogy for the next delivery.
(2) Keep the warranty deposit for settlement. After Party B has delivered the previous batch of goods and passed the acceptance inspection, Party B will keep _______ yuan as a quality deposit, and the remaining amount will be paid within the same month after the goods arrive. When the contract period expires and there are no quality problems with the goods, the quality deposit will be fully refunded to Party B.
(3) After the goods are shipped to Party A, they are inspected and passed, and payment is made within days after unloading.
6. Product packaging requirements and specifications: (Packaging costs are included in the price of the goods)______________________________________________________________.
7. Delivery location:. The freight will be borne by Party B. Party B is responsible for all risks such as damage or loss of goods during transportation.
8. Delivery time:
1. Party B will deliver the goods to the contract within ____ working days after receiving Party A’s first batch of fax orders (or phone calls or SMS notifications) Designated location. For repeated orders, the goods will be delivered to the location specified in the contract within ____ working days.
2._______________________________________________.
9. Rights and obligations of both parties:
1. If the market price of the supplied goods changes significantly, the price of the supplied products can be adjusted based on the market price through negotiation between the two parties. Make necessary adjustments. If negotiation fails, the original terms will still apply.
2. If the packaging or product specifications of the goods provided by Party B do not meet the requirements, Party A has the right to reject the goods. If Party A refuses to accept the goods, Party B must provide other goods that meet the requirements in accordance with the provisions of this contract, and Party B will be responsible for all losses caused thereby.
3. Party B must provide Party A with the production enterprise qualification certificate, business license and related procedures. The products it provides must comply with relevant national, industry or enterprise standards, and must be accompanied by production licenses, product certificates, laboratory reports and other procedures.
4. Party A shall conduct quality inspection in a timely manner upon the arrival of the goods delivered by Party B. If quality problems are found, Party B must immediately handle the aftermath on site. If any loss is caused to Party A, Party B shall bear all costs paid by Party A (including but not limited to compensation costs, necessary attorney fees, fines, etc.).
5. If Party A’s production or quality accident is caused by inherent quality problems of Party B’s products, causing losses to Party A, Party B shall compensate Party A for all expenses paid for this (including but not limited to compensation expenses, Necessary attorney fees, fines, etc.), this responsibility is not exempted because Party A has conducted quality monitoring.
6. If Party B fails to deliver the goods within the time specified in Article 6 of this contract, or the delivery is delayed, or the quantity of the goods is inconsistent with the contract, Party B shall compensate Party A for liquidated damages of _________ yuan.
7. Both parties should keep the other party’s business secrets confidential.
10. Supplementary Agreement: ____________________________________.
11. Special statement: _______________________________.
12. The contract is valid from ___ month ___, 2013 to __ month __, 20__.
13. This contract is made in two copies. Party A and Party B each hold one copy. It has the same legal effect and will take effect after being signed and sealed by both parties. When disputes arise between the two parties, they will be resolved through negotiation. If the negotiation fails, either party has the right to file a lawsuit with the People's Court where Party A is located.
14. Place of signing of the contract:
Party A (seal): Party B (seal):
Legal representative: Legal representative:
Authorized agent: Authorized agent:
Telephone: Telephone:
Fax: Fax:
Account opening bank: Account opening bank:
Account number: Account number:
Signature date: __ month __ day, 20 Signing date: __ month __ day, 20__ year
- Related articles
- Share your 7-day travel experience on National Day?
- Children should pay attention to their health when changing seasons (50 sentences)
- A Sichuan woman was killed while running at night, and the murderer was executed. What are the details of the case?
- How to delete Xiaomi mobile phone application and application data?
- It's very brief to pay a New Year call to the boss.
- How to Adjust the Font Size of vivo SMS
- How many days after the delivery?
- Is the letter announcement true?
- Sina Weibo automatically logs in every time. How can I make it not log in automatically?
- Where can I see the SMS intercepted by Apple's mobile phone?