Who should organize and convene expert demonstration meetings for special plans for sub-projects that are more dangerous than a certain scale; who should participate in expert demonstrations
1. The construction unit (general contractor) organizes the plan demonstration meeting; the participants in the demonstration are: members of the expert group, the project leader of the construction unit, the chief management engineer, and the person in charge of safety of the construction unit, Technical person in charge, project person in charge, project technical person in charge, special program preparer, full-time project safety production manager, project technical person in charge of survey and design units.
2. Special plans for sub-projects with greater risks should be organized by the contractor, invite experts, and hold expert demonstration meetings. They should be randomly selected from the relevant professional expert pool. Generally, there should be a lot of to 5 people.
Extended information:
1. The construction plan is an implementation plan specified based on a construction project. These include organizational structure plans (the composition of each functional agency, their respective responsibilities, mutual relationships, etc.), personnel composition plans (project leaders, heads of various agencies, heads of majors, etc.), technical plans (schedule arrangements, key technology plans, etc.) Plans for major construction steps, etc.), safety plans (overall safety requirements, analysis of construction risk factors, safety measures, safety plans for major construction steps, etc.), material supply plans (material supply process, inspection process, temporary (emergency) material procurement process, etc.).
2. In addition, depending on the size of the project, there are on-site security plans, logistics support plans, etc. The construction plan is determined based on the project. Some projects are simple and the construction period is short, so there is no need to formulate complex plans.
Reference material: Baidu Encyclopedia-Proposal
- Related articles
- A man defrauded more than a dozen people of millions of dollars and got pregnant, what do you think?
- Excellent Chinese Composition in Life
- Why did the public health hotline call me?
- How can I know what business I have opened?
- What is a digital information acquisition tool?
- Remember the number when you make a phone call, and it will disappear after the phone call. How should I find it?
- Taiyuan vaccination information bulletin
- There is Unicom Billy Bilica. How to fix the exclusive flow inside?
- Paipai network's mobile phone Paipai network
- I downloaded a client of Tianyi Live with my mobile phone. Do you need money to send text messages?