Joke Collection Website - Public benefit messages - Summary of typhoon safety work

Summary of typhoon safety work

Sample essay on typhoon safety work summary (general 6 articles)

Inadvertently, a period of work has come to an end. Looking back on the period of time that we have gone through, we can see the achievements we have made. It’s not easy, so write a summary of your work, learn lessons, and guide future work. How to write a work summary to maximize its effect? The following is a sample summary of typhoon safety work that I collected and compiled (generally 6 articles). It is for reference only. Let’s take a look.

Summary of typhoon prevention safety work 1

Based on the relevant information and trends of Typhoon "Nida", our bureau has been paying close attention to the progress of the typhoon, and has taken effective measures in accordance with the requirements of the typhoon prevention plan. Measures should be taken to vigorously carry out typhoon defense operations to ensure the safety of people's lives and property.

On August 1, in order to ensure the implementation of typhoon prevention work, Director Zhang Fuzhen presided over a special meeting on preventing geological disasters caused by Typhoon Nida, the fourth typhoon in 20xx. All departments, land reserve centers, and 25 people attended the meeting, including the main persons in charge of the sub-district office and the land and resources office, the director of the village committee of the village where the high-risk geological disaster hazards are located, experts from the geological team, staff from the construction and supervision units of geological disaster control projects, and leaders of various stone quarries. The meeting made specific arrangements for the goals, tasks, requirements, and division of responsibilities of each unit and department for typhoon prevention work.

After the meeting, the main leaders of our bureau led the team. Our bureau’s Geology and Mineral Section, staff from various geological institutes, and the Daya Bay Geological Team formed four inspection teams to inspect the geological disaster hazard points within the jurisdiction of the three sub-district offices. , quarry factory for on-site inspection.

In order to ensure that the people understand the importance of typhoon prevention, our bureau sent more than 300 disaster prevention text messages. Our bureau arranged for each land office to lead the directors of each village committee to distribute text messages to residents near potential disaster points. More than 300 copies of warm reminders for typhoon prevention were issued.

From the evening of August 1 to 9 a.m. the next day, 77 emergency response teams and 77 experts from the geological team led by the main leaders of our bureau were dispatched to the Land and Resources Bureau, Hesheng Coastal City and Three land and resources institutes and four emergency command points were on emergency duty; Deputy Director Zhang Dingqiang led the staff of the Geology and Mineral Section to continue on emergency duty from the morning of August 2 to August 4.

From August 2nd to August 4th, Deputy Director Zhang Dingqiang led experts from the Geological and Mineral Section and the Daya Bay Geological Team to conduct a re-inspection of the geological hazard hazard points in the jurisdiction. After inspection, the hazard hazard points in various places were stable and had not occurred. As a result of the new geological disaster, there were no property losses or casualties among the residents around the geological disaster hazard points in the region and the two stone quarries. As of August 5, our bureau has not received any reports on geological hazards or disasters. Typhoon prevention safety work summary 2

It made landfall again in Xuwen at 21:15, with central wind strength of level 12 at the time of landing. Affected by its surroundings, our district received widespread heavy to heavy rains in most parts of the district, with local heavy rains, with an average rainfall of about 86.3 millimeters. This typhoon caused serious losses to various industries in our region, especially agricultural production. The direct economic losses in the region reached more than 24.05 million yuan, and there were no casualties.

We now report on our region’s typhoon prevention and disaster relief and resumption of production work as follows

1. Basic disaster situation

According to preliminary statistics, the region’s disaster-stricken population is 30,000 people, the affected area of ??crops is 178,000 acres (including 143,100 acres of grain crops, 16,000 acres of peanuts, and 18,900 acres of vegetables), 44,500 acres of fruit trees (including 3,000 acres of bananas, 21,800 acres of lychees, 14,500 acres of longans, and other fruits 0.52 million acres), with a direct economic loss of 20 million yuan; 1 sluice and 3 irrigation facilities were damaged, with a loss of 2.75 million yuan for water conservancy facilities; a loss of 563,100 yuan for market properties; a loss of 489,000 yuan for primary and secondary school buildings; livestock, industry, and transportation , communications, power supply and other industries suffered a total loss of 248,000 yuan.

The entire district has safely evacuated 5,280 people from dangerous areas, including 1,830 people from five-guaranteed households, 50 people from areas prone to geological disasters, and 3,400 people from other low-lying areas, construction sites, and dangerous houses. .

2. Wind prevention and disaster relief operations

Provincial and municipal party committees and governments at all levels attach great importance to the prevention of typhoon "Nasat". Secretary of the Municipal Party Committee Deng Haiguang and Mayor Liang Yimin Relevant work meetings were held in person to make arrangements, and important instructions were given on our district's typhoon prevention and disaster relief and production resumption. Two leaders, Xiao Ye, member of the Standing Committee of the Municipal Party Committee and deputy mayor Huang Xinqiang, also personally visited our district to inspect and guide the wind prevention work. Our district attaches great importance to wind prevention work, conscientiously implements the spirit of instructions from the National Defense Headquarters and superior party committees, governments and other leaders, and quickly forwards superior documents to towns (streets, development pilot zones) and relevant units for conscientious implementation. Our district has successively held three emergency meetings on defense against typhoon "Nasat" and one emergency meeting on disaster relief and production resumption in the conference room of the district's three defense headquarters to deploy various specific work on wind prevention and disaster relief and production resumption.

The District Three Prevention Headquarters and various functional departments in the district have established 41 wind prevention working groups, dispatching 205 staff; all towns (streets, development experimental zones) and each village (neighborhood) committee *** 264 wind prevention working groups were established, and 792 personnel were dispatched to conduct inspections of dangerous areas, low-lying locations, construction sites, geological disaster-prone points and dangerous housing households in the region. As our district strengthened its leadership, deployed early, strengthened forecasts and timely uploading and dissemination, and ensured the smooth flow of information, it launched the second-level response of the wind and flood prevention emergency plan, acted quickly, highlighted key points, and implemented various defensive measures one by one. All functional departments and grassroots The unity and close cooperation from top to bottom of the unit, and 2 measures in place, have made remarkable achievements in wind prevention and disaster relief work in our district, and have reduced the losses caused by typhoon disasters to the lowest point.

(1) Raise awareness and strengthen leadership.

According to the forecast of the meteorological department, the strong typhoon "Nasa" has the characteristics of "fast speed, high intensity, wide range and strong destructive power", and will have a serious impact on western Guangdong. In the face of the coming storm, the party committee and government of our district attach great importance to it and regard typhoon prevention as an important task at present. We must strengthen leadership, tighten organization, and conscientiously carry out various preventive work.

On September 26, our district established a leading group for the defense against the strong typhoon "Nasa". The chief leader of the district government serves as the leader, the district leader serves as the deputy leader, and the heads of each functional department Leaders serve as members, specifically leading and organizing and coordinating wind prevention and disaster relief work. Each town (sub-district, development pilot zone) has also established a working leading group accordingly, and is going all out to make various defense preparations in advance. At the same time, all departments at all levels in the district have strengthened the 24-hour duty system and implemented a leadership system. The three prevention departments have closely strengthened communication with the municipal meteorology, hydrology and other departments to keep abreast of the latest storm developments and do a good job in uploading and distributing information. On the evening of the 28th, district party secretary Ding Jinwen, acting district chief Li Henghe and other district leaders gave up their personal rest time and personally sat in the district's three-defense headquarters to uniformly organize and direct typhoon defense work.

(2) Mobilize the entire district to implement responsibilities.

The two principal leaders, Secretary of the District Party Committee Ding Jinwen and Li Heng and Acting District Mayor, attach great importance to the prevention of the strong typhoon "Nasa" and require the party and government leaders of each town (street, development pilot zone) to personally take charge , truly take responsibility for the three prevention work in the jurisdiction, be sure to establish the idea of ??preventing strong winds, preventing major floods, and fighting major disasters, strictly follow the three prevention responsibility system, implement all defense work to the letter, and make all defense preparations Work 3: Be practical, detailed, and good, and try your best to minimize losses. Comrade Li Xiang, deputy head of the district government, has personally participated in national, provincial and municipal video conferences on wind prevention every time, and has held multiple district-wide wind prevention meetings to comprehensively deploy typhoon prevention work and requires departments at all levels to overcome paralysis and clarify responsibilities. , strengthen duty; put people first, highlight key points, and implement measures; pay attention to developments and do a good job in emergency rescue and support.

At the same time, the district emergency office and the three prevention offices jointly issued a notice requiring all towns (subdistricts, development pilot zones) and relevant departments to actively carry out publicity and defense mobilization work on customs and rain conditions, and quickly mobilize the three districts. The spirit of the prevention meeting was conveyed and implemented to all village (neighborhood) committees, grassroots stations and the masses, creating an atmosphere in the entire district where everyone knows about typhoons and actively participates in fighting typhoons.

(3) Put people first and strengthen supervision.

On the afternoon of the 28th, our district launched a secondary wind prevention emergency response.

Members of the four teams in the district immediately went to their respective towns (streets, development test areas) and villages (residences) according to the division of responsibilities to provide guidance on typhoon prevention.

Our district also dispatched more than 30 professionals from member units of the three-prevention headquarters to form 11 wind prevention working groups and went to various places to supervise and inspect the wind prevention plan measures and responsibility systems of each town (street, development test zone) Implementation and duty compliance, etc., and focus on guiding the transfer of personnel in dangerous areas and the safety of flood control in water conservancy projects. Our district focuses on ensuring the safety of people's lives and property. All localities have sent staff to conduct house-to-house inspections in dangerous areas and households in dilapidated buildings, and have done a good job in relocating people, especially in Gaoshan Huangzhu Village Committee and Zhensheng and Aotou Towns. The people relocation work in low-lying villages such as , development zones and other low-lying villages will ensure that people living in dangerous houses, five-guarantee households and people in dangerous areas such as simple houses in low-lying areas are moved to safe areas.

In the process of defending against typhoon "Nasa", our district promptly allocated a batch of flood control materials such as 50,000 sandbags, 500 wooden piles, 3 assault boats, and 4 equipped transport vehicles. The district canoe team The Ministry of Armed Forces, the Fire Brigade, the Public Security Bureau and other units have assembled a team of 55 people on standby.

(4) Cooperation among departments and implementation of measures.

The whole district quickly carried out wind prevention and wind resistance work in accordance with the requirements and deployment of superiors. According to their respective functions, various departments at the district level organized forces to make preparations for typhoons, and organized technical personnel to guide subordinate units and related industries to prepare for the typhoon. In order to ensure that the water conservancy project can survive the flood safely, the District Water Conservancy Bureau immediately mobilized technical personnel to conduct detailed inspections of river embankments, culverts, etc. in the entire district. In particular, inspections were strengthened in places with dangerous situations, and dangerous situations were reported and dealt with in a timely manner to ensure the safety of water conservancy projects. flood. The District Transportation Branch, Planning and Construction Bureau, Agriculture Bureau, Economic and Information Bureau, Animal Husbandry Bureau, Fruit Bureau, Fisheries Bureau and other units promptly dispatched guidance groups to various places to provide guidance on the protection of agriculture and breeding industries.

The departments of agriculture and animal husbandry provide guidance on harvesting mature crops and fruits in a timely manner, reinforcing tall crops such as bananas and other fruit trees with wooden stakes, and reinforcing livestock sheds. The education department paid close attention to the safety of students and dangerous school buildings, and issued a class suspension notice on the morning of the 29th. The construction department strengthens the investigation of hidden dangers such as outdoor billboards, temporary work sheds, and dangerous buildings, eliminates dangers in a timely manner, and transfers personnel in a timely manner. The civil affairs department cooperates with the local government to evacuate and resettle people living in dangerous houses, elderly people living alone, and five-guarantee households, carefully implement temporary shelters, and actively prepare for the distribution of disaster relief materials.

3. Disaster relief and production resumption work

As early as before the typhoon made landfall at noon on the 29th, our district committee and district government took precautions and issued notices in advance, requiring all towns (streets, streets, Development Experimental Zone) and relevant departments must quickly verify the disaster situation and report it in a timely manner within one hour after the typhoon passes. At the same time, the district issued an "Emergency Notice on Effectively Preventing Heavy Rains, Heavy Rains, and Disaster Resumption of Production after the Typhoon"; requiring all towns (streets) and units to strengthen leadership and continue to do a good job in flood prevention and moisture prevention after the typhoon. We will earnestly carry out post-disaster repair work and eliminate disaster scars, maintain the normal operation and stability of social production and life, and ensure that the people of the whole region celebrate the National Day happily and peacefully. On the afternoon of the 29th, Secretary Ding Jinwen of the District Party Committee personally convened the main leaders of the four teams of the district, each town (sub-district, development pilot zone) and the member units of the district’s three-prevention headquarters to convene a district-wide typhoon defense and disaster relief and resumption of production work meeting, and Adjust the district's National Day holiday arrangements, requiring the district's main wind prevention departments to not take holidays in principle, and all towns (subdistricts, development pilot zones) to not take holidays from October 1st to 4th, and make every effort to do a good job in wind disaster relief and production resumption.

In order to better carry out disaster relief and production resumption work, on the afternoon of September 30, our district immediately organized an emergency meeting on disaster relief and production resumption work at the three prevention headquarters. Li Heng, deputy secretary of the district committee and acting district director He personally presided over the work and requested that the disaster relief and production resumption work be taken as an important current task. He asked all levels and departments in the region to take active actions to mobilize the whole people and quickly set off a climax of the disaster relief and production resumption work.

Deputy District Chief Li Xiang, the leader in charge of the district government, made a comprehensive deployment of the disaster relief and production resumption work in our district, requiring all towns (subdistricts, development pilot zones) and relevant departments to immediately invest in disaster relief and production resumption work in order to take the initiative and go all out. Measures are in place to recover disaster losses.

After the meeting, the towns (subdistricts, development pilot zones) and relevant departments in our district quickly launched disaster relief and restoration work. Road clearance, traffic restoration, power maintenance, domestic water supply and other tasks have been basically completed. Since the disaster losses in our district are mainly crops, in response to the serious agricultural disasters in the district, the "Guiding Opinions on Agricultural Disaster Relief and Resumption of Production in Maonan District" have been formulated for disaster relief and resumption of production of various crops in the district. Five specific measures were formulated and distributed to all towns and agricultural stations. The District Agricultural Bureau also promptly mobilized agricultural science and technology personnel to form an agricultural disaster relief and production resumption guidance working group, which went to grassroots rural areas to provide specific guidance to farmers on crop protection, seedling protection, drainage, fertilization, pest control and other tasks, so as to restore agricultural production.

The animal husbandry department quickly carried out sanitation and disinfection and harmless treatment of livestock and poultry carcasses to prevent the spread of animal epidemics; the District Water Affairs Bureau organized a working group to go to the disaster area to investigate the damage to water conservancy projects and formulate a repair plan for water-damaged projects. ; District aquatic products, forestry, fruit, market, education and other departments are also stepping up various disaster relief and restoration work. At present, all disaster relief and production resumption work of all levels and departments in our district are being carried out non-stop and in an orderly manner, and we strive to complete it successfully during the National Day. Summary of typhoon safety work 3

1. Fully prepare for disasters

First, strengthen organizational leadership and ensure that personnel are on duty. The Mid-Autumn Festival holiday has been cancelled, a duty schedule has been formulated, and a duty system for the main leaders in charge has been implemented. 24-hour duty is implemented and all personnel are on duty. Ensure that all the management personnel of the 66 disaster evacuation points in the district are on duty, and ensure that all members of the emergency rescue and disaster relief team are on duty. They are divided into two groups, with 5 people in each group. Director Zhang Zaigeng and researcher Zhang Min serve as the team leaders. Good disaster relief preparation. The second is to activate emergency plans and make mobilization arrangements.

Quickly initiate emergency response, issue disaster prevention and reduction notices to the streets in a timely manner, mobilize and deploy the streets to prepare for the opening and reception of disaster evacuation points, and prepare for disaster verification and disaster reporting. On the eve of the typhoon landing at 22:00 on the 14th, researcher Zhang Min personally led a team to inspect disaster-prone communities (village-to-residence communities, landslide-prone areas) and communities with a large number of relocated people, and guided the prevention work. The third is to prepare for disaster relief and ensure adequate supplies. Check the material situation in the disaster relief warehouse, prepare food and drinking water at the disaster evacuation points in advance, and notify the agreed reserve merchants and disaster relief warehouses to prepare for material supply at any time. Each disaster evacuation point ensures that the affected people have food, clothing, and food. Provide a place to live and have clean water to drink, ensuring the basic life of the disaster-stricken people.

Second, fully invest in emergency rescue and disaster relief

First, report the disaster situation in a timely and accurate manner. Strictly implement the "Statistical System for Natural Disasters of the Ministry of Civil Affairs", assign a designated person to be responsible for reporting disaster information, and report disaster and relief work within the specified time. A zero-reporting system is implemented, the channels for reporting disaster information in streets and communities are smooth, and disaster information is sent in a timely and accurate manner. A total of 103,630 people were affected in the district, and 105 houses were damaged. The second is to relocate people promptly and safely. Always putting the safety of people's lives first, the district urgently relocated 9,229 people, including 3,165 people in centralized resettlement and 6,064 people in dispersed resettlement. The third is to distribute supplies in a timely and sufficient manner. To effectively protect the basic life of the disaster-stricken people, 1,016 pieces of clothing and quilts were distributed to each disaster evacuation site, and other daily necessities were discounted by about 408,500 yuan.

3. Rapidly carry out post-disaster reconstruction

First, formulate and issue work requirements. We quickly formulated a post-disaster reconstruction work plan and issued the "Several Requirements of the Huli District Civil Affairs Bureau on the Post-Disaster Reconstruction Work of Typhoon No. 14 "Meranti" (Xiahu Min [20xx] No. 60) to guide the post-disaster reconstruction work of street communities. The second is to actively coordinate military assistance. Actively contact the troops within the jurisdiction and request troop support. We should do a good job in supporting the officers and soldiers, and promptly go to various streets and communities to check the food and other security conditions, and require the streets to make every effort to ensure that the officers and soldiers are well-fed, well-fed, and well-rested.

*** 20xx army officers and soldiers have been involved in emergency rescue and disaster relief and post-disaster reconstruction, becoming the main force in our region's emergency and disaster relief work and making important contributions to our region's post-disaster reconstruction. (Among them: the city dispatched 1,350 officers and soldiers from the 710th Regiment, 278th Regiment and Fuzhou Detachment of the 93rd Armed Police Division, and 665 officers and soldiers from the coordination force of the District Double Support Office.) Third, the overall cadres and workers participated in the reconstruction.

A 30-person emergency rescue and disaster relief team was established. Director Zhang Zaigeng personally led the team to the streets and communities to participate in the obstacle clearance work. 200 people visited the Changle Community of Heshan Street, the Teacher Training School, and Double Ten Middle schools, Gulong Apartments, Crystal Forest, Chengshangcheng and other communities, schools, and residential areas participated in garbage removal and road clearance. The fourth is to mobilize extensive social participation. More than 100 social workers from Huli District Peishan Social Service Center, Xiahui Elderly Service Center, Hexie Social Workers, Boai Social Workers and other social work organizations spontaneously went to the front line of disaster relief and actively participated in post-disaster reconstruction in 53 stationed service communities in the district. Help with garbage removal, road clearance, comfort for the elderly, temporary traffic direction, etc. At the same time, more than 20,000 registered volunteers in our district were mobilized to participate in disaster relief and post-disaster reconstruction work. Influenced by the volunteers, many residents also voluntarily joined the volunteer team, and "social worker volunteers" became A beautiful scenery among the emergency and disaster relief teams in our district.

4. The next step of work plan

Do a good job for the extremely poor people, subsistence allowance households, low-income families, disabled people, key preferential treatment recipients, revolutionary veterans and hard-hit households and other relevant personnel of rescue. Do a good job in distributing materials donated by Nanping City to our district. Summary of typhoon safety work 4

1. Basic situation of typhoons

The center position of Typhoon No. 10 "Davi" at 11 o'clock on August 2 was 30.4 degrees north latitude and 130.8 degrees east longitude. The maximum wind force near the center is level 12. It is currently continuing to move west-northwest at a speed of about 40 kilometers per hour. It will enter the northeastern part of the East China Sea tonight and may make landfall on the coast from southern Jiangsu to the southern Shandong Peninsula on the night of the 2nd. Affected by the typhoon, our city will experience significant wind and rain, with winds gradually increasing to level 6-7 on land and gust level 8, and level 9-11 at sea. Rainfall will be moderate to heavy, with local heavy rains, posing a major threat to our company. However, under the unified command and deployment of our company, we made the most adequate emergency preparations, ensuring zero casualties and minimizing disaster losses. The work of the welded pipe factory in defending against Typhoon Dawei is summarized as follows:

2. Disaster damage statistics:

1. There were zero casualties;

2 , Project losses.

3. Typhoon defense work

The company leaders attach great importance to the typhoon defense work. The leaders of all departments of the welded pipe factory are all stationed at the base headquarters to make unified deployment and careful arrangements, and hold timely typhoon prevention work During the emergency mobilization meeting, all units responded quickly and cooperated closely, promptly launched the base's "three defenses" emergency plan and emergency work procedures, established a duty inspection system at all levels, strengthened measures, proactively prevented, and carried out various defense work in an orderly and effective manner to ensure Zero casualties and minimized disaster losses.

The main tasks are as follows:

1. Implement on-site typhoon prevention work

After the typhoon yellow warning signal is issued, all units are immediately notified to stop operations at high altitudes and reinforce all Equipment and facilities. Subsequently, the person in charge of each workshop of the headquarters will lead a team to conduct on-site inspection and confirmation.

2. Implement key drainage tasks

According to the weather forecast, heavy rainfall will accompany the typhoon. Therefore, before being officially affected by the typhoon, we must concentrate on temporarily using the outdoor areas. All drainage pipes were dredged to ensure that the base could quickly and effectively discharge floods when it withstood heavy rainfall. This work was completed before the typhoon yellow warning signal was issued.

3. Implement personnel relocation work

Disaster prevention and reduction work must always unswervingly implement the most basic principle of "people-oriented" typhoon defense to ensure zero casualties. The biggest goal to prevent typhoons.

On the evening of August 2, Rizhao issued a typhoon red warning signal. The company leaders immediately issued two emergency typhoon prevention instructions in response to the typhoon red warning signal:

First, stop production and all workshop staff must evacuate to the established resettlement.

Second, all personnel entering the resettlement site must obey the unified arrangements of the workshop and headquarters, and must not cause damage to the equipment and facilities in the resettlement site;

4. Implement emergency response Rescue work

In order to carry out rescue and rescue work quickly and effectively in the event of danger, the headquarters has equipped a sufficient number of sandbags at the gates of each factory and organized a rescue and disaster relief team.

On the morning of August 3, the typhoon warning signal was lifted.

The Mobility Department held a special meeting on the repair work of damaged workshop buildings, windows and other parts, and studied and determined the on-site repair plan.

IV. Work plans and measures for disaster prevention and reduction

1. Establish an on-site typhoon prevention headquarters, with the factory director as the commander, the production section chief as the deputy commander, and others Members are members of the command.

2. Pay close attention to the release of typhoons, and collect and understand sea surface activities and typhoon forecast information in nearby and local areas through various channels such as news, newspapers, and the Internet, so as to achieve early preparation and defense.

3. On-site factories, offices, walls, colored steel tiles and other things that are easily blown by strong winds should be reinforced in time, materials and equipment should be placed securely, and lighting and power cables in the site should be laid and fixed. To firmly prevent the gantry crane from being blown off by typhoons and causing electric leakage and electric shock accidents, the gantry crane should be fixed with steel wire ropes in time.

4. Unified command and hierarchical responsibility. When a typhoon situation occurs, the on-site typhoon prevention headquarters should provide unified command and perform their respective duties to ensure that all typhoon prevention orders are issued smoothly and effectively implemented.

5. Formulate a typhoon emergency plan and formulate targeted response measures based on different characteristics such as the size of the typhoon's wind power, the arrival time of the typhoon's maximum wind power, and the direction of the typhoon.

6. Prepare anti-typhoon rescue materials and equipment, carry out risk removal and reinforcement, and eliminate various safety hazards for on-site personnel and equipment.

7. When a typhoon approaches, report to the local authorities in a timely manner, reinforce the safety of construction equipment, safely transfer dangerous personnel and property, and increase the intensity of safety inspections, especially in areas prone to disasters. Strengthen inspections of dangerous situations. If signs of major dangers are found, report them immediately and organize forces to carry out rescue operations.

8. The material warehouse and open-air warehouse should be inspected in advance. If there are defects, they should be repaired immediately. The materials in the open-air warehouse should be arranged neatly. Wearable objects should be placed in the warehouse for safekeeping. Lighter items should be kept in the warehouse. Press it down with heavy objects or tie it tightly with iron wire. Typhoon Prevention Safety Work Summary 5

This year’s No. 9 strong typhoon “Meihua” successfully passed through the Shanghai area this Sunday (August 7), bringing a certain amount of wind and rain to the Shanghai area. Due to the change in the direction of the typhoon, no losses were caused to the branch factory.

In order to strengthen targeted prevention work, improve the branch factory’s ability to prevent typhoons, further improve the practicality of the branch’s emergency response system, and ensure the safety of branch employees and their lives and property, we are hereby Summary of typhoon work:

1. The branch leaders attached great importance to the typhoon prevention work and achieved good results

The branch emergency leadership team received the company’s instructions on prevention After the notification of the strong typhoon "Plum Blossom", we actively responded. The branch leaders immediately organized personnel to start work, arranged and contacted emergency supplies as soon as possible, and made arrangements for typhoon prevention.

2. The members of the branch’s emergency team responded promptly and cooperated well

After receiving the notice from the company, the branch’s emergency team immediately arranged for a dedicated person to contact the company’s emergency management office about the flood control sandbags. And deploy and arrange a list of flood prevention and rescue personnel. The information about the arrival of the typhoon was notified to all employees of the branch as soon as possible. The branch factory arranged for electricians to make rainproof treatment for all electrical cabinets in the workshop, and equipped the power distribution room with a submersible pump for drainage.

In addition, the branch factory arranged for special personnel to place sandbags in the branch warehouse, workshop entrance and other locations, and prepared fire buckets. Before the arrival of the typhoon, the branch leaders once again led members of the branch's emergency team to conduct a detailed inspection of the branch's typhoon prevention preparations to ensure that nothing went wrong.

3. Unify our thinking and respond seriously

Through this typhoon prevention rehearsal, the employees of the branch factory have further improved their ideological understanding, improved the emergency preparedness level of the branch factory, and provided a good foundation for the branch factory. A good foundation has been laid for carrying out similar emergency drills in the future. With response experience, the branch factory will carefully summarize this drill and strive to make future work more comprehensive and solid. Typhoon Prevention Safety Work Summary 6

Typhoon "Likima" is coming fiercely. Since it began to be affected by it on the afternoon of August 9, Jiashan County has experienced heavy rains to heavy rains and strong winds. During this period, we All the staff of the institute took active actions and carefully deployed, and successfully completed the work of flood prevention and typhoon resistance. The work is now summarized as follows:

1. Meeting deployment and emergency implementation

After receiving After the superior department issued a notice on the prevention of Typhoon "Lekima", our institute immediately held an emergency meeting on the fight against Typhoon No. 9 "Lekima". Middle-level and above cadres attended the meeting.

At the meeting, Director Quan Fenggen conveyed the spirit of the anti-Taiwan meeting, informed about the dynamics of Typhoon "Lekima", and asked all members to attach great importance to it and make the anti-Taiwan issue the top priority at present. , and made arrangements for the current anti-Taiwan work. The first is to quickly issue anti-Taiwan notices to enterprises under jurisdiction, requiring them to do a good job in preparing for Taiwan, focusing on enterprises with "two customers and one crisis". The second is to implement the "three prevention" policy, focusing on further strengthening and implementing ideological understanding, personnel in place, material preparation, duty, etc., focusing on emergency vehicle preparation (5 trailers, 1 tractor). The third is to strengthen information dissemination, timely grasp bus routes and bus suspension information, and timely report anti-Taiwan information. The fourth is to comprehensively investigate hidden dangers, and all units should immediately go to the scene to provide guidance and deploy anti-Taiwan work. Fifth, the logistics support work is in place. Starting from today, preparations for duty will be made to ensure that mobile phones are accessible 24 hours a day, and all personnel will stick to their posts and work normally on weekends.

2. Go deep into the enterprise and conduct inspections

On the afternoon of August 9, under the leadership of Director Quan Fenggen, the leaders in charge went deep into the enterprises under their jurisdiction to conduct inspections on "two customers and one customer" "Emergency" enterprises, bus companies, maintenance companies, driving training institutions, and taxi companies are required to carry out inspections, requiring all companies to effectively improve their ideological awareness, do a good job in preparedness before typhoons, and require all companies to stop work if they should. Our office dispatched 46 people to inspect 20 companies. On August 10, except for some dangerous goods vehicles to protect people's livelihood, which will be transported with the permission of superior departments, other "two passengers and one dangerous" vehicles will be parked in safe areas.

3. Strengthen duty and report information

According to the deployment of the superior department, our office has arranged 24-hour duty personnel, requiring all personnel to be on duty, do a good job on duty, and Do a good job in submitting the "three prevention" information work.

IV. Start the emergency plan and transport materials

After receiving the notice from the superior department about supporting Linhai, our unit immediately launched the emergency plan and promptly obtained the emergency plan from Jiaxing Yuanfang Logistics Co., Ltd. Contact us to arrange a truck to transport rescue boats and other rescue equipment to support Linhai disaster relief. ;