Emergency plan for typhoon disaster

Emergency plan for typhoon disaster (select 6 articles)

In our daily life, it is inevitable that some accidents will happen. In order to prevent things from getting worse, it is often necessary to prepare emergency plans in advance. So, do you understand the emergency plan? The following is my emergency plan for typhoon disaster (selected 6 articles), welcome to read and collect.

Emergency Plan for Typhoon Disaster 1 Doing a good job in typhoon prevention in construction sites is of great significance to social stability and economic development. In order to carry out windproof work in an orderly manner, ensure timely, efficient and orderly emergency treatment on the construction site, minimize accidents, ensure personal and property safety, and maintain social stability, this emergency treatment work plan is formulated according to the Law of People's Republic of China (PRC) on Work Safety, the Provisions of the State Council on the Investigation of Administrative Responsibility for Extraordinary Safety Accidents (the State Council Order No.302) and the actual situation of our construction site.

First, the basic principles of emergency treatment

(1) This plan is the basic procedure and organizational principle for emergency treatment when typhoon affects our site.

(2) This plan is applicable to the emergency treatment of the construction site.

(3) This plan implements the principles of unified command, individual responsibility, close cooperation, prevention first, saving lives, quick response, territorial protection and ensuring safety in the implementation of emergency response.

Second, the organization and command institutions and main responsibilities

Set up on-site wind prevention work command group.

Team leader: Zhang Shuquan

Members: heads of construction teams.

Main responsibilities:

(a) responsible for the formulation and revision of the project wind emergency treatment implementation plan;

(2) Before the typhoon comes, be responsible for notifying the person in charge of the construction site to do a good job of wind prevention, checking the reinforcement of safety facilities on the construction site, and evacuating and transferring the accommodation personnel of temporary work sheds;

(three) arrange personnel on duty, patrol the construction site, in case of casualties, immediately organize rescue and rehabilitation work; Keep close contact with relevant government departments, report the emergency treatment at the scene of the accident at any time or request the necessary rescue forces to reinforce;

(four) after the typhoon, responsible for convening the relevant departments to investigate and analyze the causes of casualties and summarize the emergency handling of accidents.

Third, the implementation of the plan

(a) when the typhoon is developing and is expected to affect our region, the Meteorological Observatory will release typhoon news:

1, issue a notice of wind prevention work, and all teams should pay attention to the weather forecast and pay close attention to the typhoon trend.

2, notify the site teams, ask them to pay attention to the preparation of typhoon prevention.

(two) the typhoon approaching our city will affect our region within 48 hours, and the Meteorological Observatory will issue a typhoon warning:

1, each team shall arrange the construction reasonably and stop the working procedures that must be continuously constructed;

2, do a good job of safety inspection before the typhoon, the inspection content includes whether tic-tac-toe frame is firm, whether the facilities such as grille are firm, including whether the temporary work shed is safe, measures should be taken to strengthen and eliminate potential safety hazards.

3. Strengthen the inspection of the construction site, issue a rectification notice to the problems and hidden dangers found in the inspection, and order the construction team to rectify immediately.

(3) When a typhoon may strike our region within 24 hours, causing serious impact on our region, the Meteorological Observatory will issue an emergency warning for typhoon:

1. The personnel of the construction site wind prevention work command team are in place, and personnel are arranged to be on duty to inspect the construction site.

2. Stop construction at the construction site and evacuate the construction personnel to safety.

3, further check the implementation of various defensive measures, and in a state of war, the implementation of the construction site rescue team in place, and in a state of war.

(4) When the typhoon has landed and weakened to a low pressure, it will no longer have an impact on our city. After the typhoon warning issued by the Meteorological Observatory is lifted, all construction teams should check the damage. Strengthen the safety of on-site equipment and facilities in time and summarize the typhoon prevention work.

Emergency Plan for Typhoon Disasters 2 In order to effectively prevent and control the geological disasters of unstable slopes of dangerous rocks in xx Town and unstable slopes of dangerous rocks in Mid-levels, minimize accidents and avoid personal safety and property losses of the people, the following emergency rescue plans are formulated in combination with the actual situation of our town.

I. Main points of disaster situation

(A) xx unstable slope of dangerous rock mass

The unstable slope of xx dangerous rock mass is located behind Longshan Temple in Liyang Town. There are several prominent dangerous rocks on the top of the mountain, which affect the safety of people and property in Longshan Temple. In case of heavy rainfall for a long time, landslides may occur. In case of heavy rainfall for a long time, notify the personnel in Longshan Temple to evacuate in time.

(2) The unstable slope of Banbianshan dangerous rock mass

The unstable slope of Banbianshan dangerous rock mass is located in the south of Xiaolongshan Mountain in Liyang Town. Banbianshan Mountain is almost vertical, and there are many raised rocks on the surface, which are easy to fall. There are special police schools and houses near the dangerous rock in Huangshan City. Long-term heavy rainfall may lead to landslides. In case of long-term heavy rainfall, notify nearby personnel to evacuate.

Second, the emergency work leading group

Team leader:

Deputy team leader:

Members:

Three. Emergency response and action

(1) Emergency personnel

Tester: xx

Settlement point: xx

Contact: xxx

Transferee: Releasing.

(II) Emergency Team: xxx

(3) Emergency material reserve

The flood control and disaster relief materials in the town mainly include: raincoat/KOOC-0/2 sets, helmet/KOOC-0/2 sets, four folding charging recording and talking microphones, shovel/KOOC-0/0 sets, sacks/KOOC-0/00 pieces, and some sand. The above flood control materials are stored in the instrument room of the town and uniformly deployed by Comrade Lin Tianyou.

(4) Emergency response:

1, the town's leading group for flood control and disaster relief held a meeting to report the disaster situation and disaster relief work in the jurisdiction, analyze and predict the possible greater disasters, and deploy disaster relief work in the jurisdiction. Immediately report the disaster situation and disaster relief work in the jurisdiction to the District People's Government and the District Flood Control and Drought Relief Headquarters, and request the support of the district government.

2. Organize the whole town personnel to inform the residents of flood information in time by telephone, SMS, microphone and other means according to the urgency of the flood season; In case of emergency or interruption of power supply and communication, residents in disaster-prone areas should be informed separately, especially when related disasters may occur at night, and the reliability of information transmission should be ensured, so as not to miss one household or one person.

3, emergency personnel according to their respective responsibilities and tasks, after receiving the disaster weather forecast, should be on standby at any time, not to go out, after receiving the assembly command, should be in 15 minutes to the designated place, according to the command to organize rescue.

4. Publish the disaster situation. The town headquarters office summarizes the disaster situation and reports it to the district flood control and drought relief headquarters.

Fourth, post-disaster relief work.

1. Hold a meeting on self-help in production and life in time, and quickly organize the recovery of production and life.

2, seriously organize the nuclear disaster investigation, focusing on the verification of the collapse of houses caused by the disaster, especially the loss of particularly heavy victims such as all households.

3. According to the disaster situation after the nuclear disaster, formulate a rescue plan for the victims and implement it step by step.

Five, the basic requirements of flood control emergency work and work discipline

1. The Office of the Leading Group for Flood Control and Disaster Relief implements a 24-hour duty system during flood control. Strict work discipline, carefully record the situation on duty and report in time. During the flood control period, if a member of the headquarters needs to leave the local area on business, it must be approved by the main person in charge of the unit and arrange the flood control work within the scope of his duties.

2. The responsible person is fully responsible for flood control and disaster relief, and must ensure that the telephone is open 24 hours a day, arrange the duty in this area, supervise and urge the duty record and duty handover, and report the danger within 30 minutes, and shall not delay the rescue work.

3. Where in the flood season on duty and flood control and disaster relief work, dereliction of duty, irresponsibility, late reporting or personnel are not in place in time, the responsibility of the relevant personnel should be seriously investigated; If serious consequences are caused, the main responsible person shall be investigated for responsibility according to law.

Typhoon disaster emergency plan 3 coastal areas are prone to typhoons. In order to ensure the safety of construction personnel and enterprise property, our construction unit has taken the following typhoon prevention measures at the construction site:

First, early deployment:

1. Deploy typhoon prevention measures immediately after receiving typhoon forecast;

2. Communicate the typhoon prevention notice from the superior to all employees in time, so that employees can understand the direction and arrival time of the typhoon.

Second, the organization inspection:

1, organized by the typhoon prevention team of the project department to conduct a comprehensive inspection of the construction site to ensure foolproof;

2, each team carefully check whether all kinds of building materials piled up firmly, to clean up the slightly chaotic place;

3. The shelf class should comprehensively check the overall performance of the outer frame and the rigid connection between the outer frame and the building, and rectify the places with potential safety hazards immediately.

4. The professional protective team on the construction site will reinforce the protective shed. The concrete reinforcement measures are to set scissors and fix the four corners of the protective shed on the ground with iron wires.

5, tower crane operators to stop all lifting work before the typhoon, the parking position and fixed point of the boom according to the operation procedures of tower crane.

6. After receiving the notice of typhoon prevention, the electrician should immediately check the circuits and wires laid on the construction site, check whether the electric box is solid and reliable, rectify the places with potential safety hazards immediately, and cut off all construction electricity before the arrival of the typhoon. After the typhoon, first of all, we should check the circuits and wires on the construction site and confirm that they are normal before sending electricity.

7. When the typhoon comes, all the doors and windows of the dormitory in the living area are closed to ensure the safety of employees.

Third, leaders attach importance to:

Members of the leading group organized by the project department are on duty all night and equipped with necessary communication equipment (such as walkie-talkies) to contact each other in case of emergency.

Fourth, emergency rescue:

1, emergency rescue personnel should be trained and necessary drills, master the methods, skills and precautions of rescue operation, be familiar with the safety production situation of their own units, and master the performance and usage of emergency rescue equipment.

2, equipped with the necessary emergency rescue equipment, equipment.

3. During the typhoon, the rescue team is on standby for 24 hours, and the accident is handled in time.

Verb (abbreviation for verb) starts the plan:

Set up a typhoon emergency team to deal with the problems in typhoon prevention in time and reduce unnecessary losses.

Emergency Plan for Typhoon Disasters 4 In order to do a good job in typhoon prevention at my construction site, reduce disaster losses, and ensure personal and property safety, the emergency response plan of this project department is formulated in accordance with the spirit of the People's Republic of China (PRC) Safety Production Law and relevant documents of the District Construction Bureau, combined with the reality of our company.

First, the basic principles of emergency treatment

(1) This plan is the basic procedure and organizational principle for emergency treatment when the construction site is attacked or affected by a typhoon.

(two) the implementation of emergency treatment follows the principle of unified command, responsibility, prevention first, rescue first, rapid response and safety first.

Second, the organization and the responsibilities of the supervisor

The project department set up a leading group for typhoon prevention on the construction site.

Team leader: Zhu Jiahua, project manager.

Deputy team leader: Dai Jinquan, deputy manager of the project department, and Zhou, technical director.

Members: Zhang Hua, safety office of the project department, Cai Baobin, quality engineer, Zhang Jianhu, builder and other relevant personnel.

Main responsibilities:

(a) responsible for formulating and revising the emergency plan for typhoon prevention in construction projects;

(2) Before the typhoon comes, inform the construction site to do a good job of typhoon prevention, check the reinforcement of safety facilities on the construction site, and evacuate and transfer workers;

(three) arrange personnel on duty, check the construction site, immediately organize rescue and rehabilitation work, maintain close contact with the higher authorities, and report the emergency treatment at the scene of the accident at any time;

(four) after the typhoon, responsible for convening relevant personnel to summarize the emergency handling of the accident.

Third, the implementation of the plan

(1) received the news released by the Meteorological Observatory, which is expected to be affected by the typhoon:

1, the site project management department issued a typhoon prevention notice, and the relevant personnel of the project department paid close attention to the weather news and the typhoon trend;

2, the project intends to inform the relevant personnel and team, require all staff to cooperate closely, do a good job in the preparations for typhoon `.

(two) the typhoon approaching our city will affect our region within 48 hours, and the Meteorological Observatory will issue a typhoon warning:

1, the project department arranges the construction reasonably and stops the process that must be continuously constructed;

2, the project department should cooperate with the branch to do a good job of safety inspection before the typhoon, including whether the construction elevator is firm, scaffolding and other facilities are firm, whether the temporary work shed is safe, etc. And take measures to strengthen and eliminate potential safety hazards.

(three) there may be a typhoon in our area within 24 hours, and when the Meteorological Observatory issues an emergency warning:

1, the typhoon prevention leading group of the project department is in place, and personnel are arranged to be on duty;

2. The construction site stops and the construction personnel are evacuated to safety;

3, the project intends to organize personnel to patrol the scene, cooperate with the company's leading group to further check the implementation of various defensive measures, and ensure that the on-site rescue team is in place and in a state of war;

4. During the typhoon, the safety accidents with casualties on the construction site shall be implemented in accordance with the Company's Emergency Rescue Plan for Major Safety Accidents in Construction Projects.

After the typhoon, when the meteorological station issues a typhoon warning, the project department should check the disaster situation and report it to the branch and the head office. Strengthen the site safety facilities in time and summarize the typhoon prevention work.

Emergency Plan for Typhoon Disaster 5 This plan is formulated in order to implement the spirit of the Notice on Doing a Good Job in Flood Control and Typhoon Prevention issued by the East China Regional Administration of Civil Aviation and the relevant requirements of local governments at all levels, and to prevent the airport from being attacked by typhoons in combination with the Emergency Plan for Flood Control and Typhoon Prevention of Weihai Airport.

This plan is used in conjunction with Weihai Airport Emergency Plan for Flood Control and Typhoon Prevention.

I. Working principles

In accordance with the principles of "prevention" before the arrival of a typhoon, "avoidance" when the typhoon arrives, and "rescue" after the arrival of a typhoon, the emergency response work for preventing the frontal attack of a typhoon will be carried out in an orderly manner.

Second, organization.

The emergency response of Weihai Airport against typhoon frontal attack is carried out under the unified leadership of Weihai Airport's flood control and typhoon rescue headquarters.

Third, the responsibilities of various departments.

After receiving the typhoon warning notice, under the unified leadership of Weihai Airport's flood prevention and typhoon rescue headquarters, all departments should act quickly and do a good job in the preparation and implementation of various "prevention", "avoidance" and "rescue" according to their respective responsibilities. The responsibilities of each department are as follows:

1. Airport Office: After receiving the warning notice of typhoon attack, inform the company leaders and airport departments in time. After asking the company leaders for approval, start the plan, arrange personnel to be on duty, and assume the responsibilities of Weihai Airport Flood Control and Typhoon Prevention emergency headquarters Office.

2. On-site command center: After receiving the typhoon attack warning and the notice of the start-up plan, coordinate the airport construction management office, the maintenance office and the security inspection station to bind, reinforce or dismantle the parked aircraft and apron facilities and equipment in time, and report the relevant information to the emergency headquarters office of Weihai Airport Flood Control Station in time.

3. Air traffic control center: after receiving the warning notice of typhoon attack, do a good job of liaison between the scheduled flights and the transfer of existing flights; Wind prevention, drainage and reinforcement of navigation station; Do a good job in emergency communication support; According to the requirements of the bureau, the contents of the "Airport Air Traffic Control Plan" to prevent typhoon frontal attacks were implemented.

4. Maintenance Department: After receiving the warning notice of typhoon attack, according to the requirements of the emergency plan for wind damage of the maintenance department, the parked aircraft will be parked and the special vehicles will be put into storage. For special vehicles that cannot be stored in the warehouse, they should be parked far away from the parked aircraft, and brakes should be set and wheel blocks should be added. The equipment and facilities on the apron should also be put into storage with windproof measures and anti-collision cones, and the traction rods and working ladders should be put into storage or fastened to prevent other facilities from being damaged by wind. This planning scheme is an emergency plan for preventing typhoon frontal attack at the airport. Strengthen the personnel on duty and keep the communication open.

5. Airport Construction Management Office: After receiving the warning notice of typhoon attack, strengthen the protection of power supply system, make preparations for emergency repair of power supply, and ensure normal power supply. Windproof measures should be taken for the equipment and facilities on the tarmac. After the gale, check the airport roads and lighting facilities immediately to prepare for the opening of the airport.

6. Security checkpoint: After receiving the warning notice of typhoon attack, reinforce and bind the covered bridge to prevent accidents.

7. Freight Center: After receiving the warning notice of typhoon attack, take windproof measures for freight equipment and facilities outside the freight warehouse, and transfer the freight equipment and facilities on the tarmac to the freight warehouse.

8. Airport Public Security Bureau: After receiving the warning notice of typhoon attack, all fire-fighting vehicles and air defense guard vehicles should be put into storage or parked downwind, and equipped with brakes and wheel blocks. All police officers are on standby, ready to be dispatched by Weihai Airport Flood Control and Typhoon Rescue Headquarters to participate in the rescue work.

9. Other departments: According to the duty requirements of Weihai Airport Emergency Plan for Flood Control and Typhoon Prevention, they are on standby at any time to maintain smooth communication.

Fourth, the job requirements

1, responsibilities in place, clear division of labor. According to the Emergency Plan for Flood Control and Typhoon Prevention in Weihai Airport and the Emergency Plan for Typhoon Frontal Attack in Weihai Airport, all airport departments can formulate implementation rules, clarify the responsible person and the specific responsible person, and decompose the typhoon prevention tasks determined in the plan to the specific responsible person, forming a horizontal and vertical work network and a flexible and efficient contact and response mechanism.

2, fully prepared, effective measures. All departments should organize experienced and capable personnel to deal with emergencies according to the typhoon prevention plan. When a strong typhoon attacks or affects the airport head-on, emergency rescue personnel should stand by and gather at the specified time to prepare for the war, as well as emergency materials, equipment, transportation tools, etc. Should be arranged in the front line in case of emergency call. Report to the Municipal Emergency Office in a timely manner and contact socialized emergency materials, equipment and tools. And make emergency preparations.

3, strengthen vigilance, timely disposal. The office of the flood control and typhoon rescue headquarters arranges personnel to master and develop flood dynamics, report in time when they encounter over-alert, abnormality or danger, and organize evacuation, emergency repair and reinforcement in time. In case of emergency, while reporting to the superior, we should take the initiative to take emergency measures, seize the favorable opportunity, implement emergency treatment and eliminate hidden dangers.

4, emergency duty, smooth communication. After receiving the warning notice of typhoon attack, the office of flood control and typhoon prevention and rescue headquarters and all departments implement the 24-hour duty system to keep the information flowing. The heads of all departments and the personnel in charge of typhoon prevention in their own departments turn on their mobile phones day and night to track the rain, water, customs, disasters and secondary disasters, hold timely consultations and start relevant emergency procedures according to different situations.

Verb (abbreviation of verb) supplementary clause

1. The Airport Company is responsible for the interpretation and implementation of this scheme. And revised in time according to the actual situation.

2. This scheme shall be implemented as of the date of promulgation.

Emergency Plan for Typhoon Disasters 6 In order to further implement the deployment of higher-level fishery production safety work, strengthen typhoon prevention work, and strive to reduce the losses caused by natural disasters such as typhoons and high tides to fishery production, this work plan is formulated in combination with the actual situation of our town.

Organizational leadership and work responsibility system

Adhere to the policy of putting prevention first, strengthen education and publicity, enhance fishermen's awareness of Taiwan prevention and resistance, promote fishermen to consciously implement Taiwan prevention measures, and ensure the safety of fishermen's lives and property.

The town set up a leading group for fishery typhoon prevention, which is responsible for guiding and coordinating the fishery disaster prevention and relief work in the town.

Under the office, the office is located in Wei Fen Ship Management Station, with Comrade Lin Xiongqiang as the director.

Organize 60 commandos for typhoon prevention and disaster relief, with Comrade Lin Tongfa, Minister of Town People's Armed Forces as the team leader, to deal with dangerous situations and outstanding incidents, set up fishery associations and "1/kloc-0" teams in key aquaculture areas, and improve emergency rescue means and life-saving measures. "Maritime 1 10" personnel are composed of fishery village cadres and Baocun task forces, and the team leaders of each Baocun task force are responsible for leadership. The backbone of each fishery village is responsible for organizing wind-resistant rescue teams. Ensure that measures, work and responsibilities are in place.

Key points and objectives of typhoon prevention work

Fishing ports, diaoyutai and fishing boats in Fox Xia and Macao; Thousand-sided ao fishing rafts, fishing ports and fishing boats; Anhai' ao fishing port and fishing boat; Third Bridge Fishing Boat, Niuchiling Wharf, Jianmin seawall, Huadong Village Yutai, Interoceanic Breakwater, Jikou Breakwater, etc. Are the focus of the work, fishermen's life safety is the first, and strive to "not die, less loss."

Implementation methods and measures

When the meteorological department releases typhoon news, the town government should promptly notify the fishing villages and do a good job in publicity and prevention. Villages should promptly notify ship owners, farmers and fishing boats of typhoon forecast and typhoon news, organize the masses to prepare for evacuation at any time, and strengthen mariculture facilities. Wei Fen border police station, Aodong administrative police station, and ship management station personnel should prepare for the evacuation of fishing rafts and ship personnel, strengthen public security patrols within their respective jurisdictions, and maintain public security and stability within their respective jurisdictions.

When the meteorological department issues a typhoon warning, it is necessary to mobilize the whole town, and the leading group for typhoon prevention in the town will be under unified command, arrange town cadres to stay in villages and stations, organize the masses to reinforce fishing rafts, guide fishermen on fishing rafts to land, urge fishing boats to enter the port, prohibit all fishing boats from going to sea, and take compulsory measures when necessary to ensure that people land and ships enter the port. Each village should go deep into the front line, notify the fishing boats in the village to take shelter from the wind, anchor and cable nearby, do a good job in the evacuation of fishermen, master the movements of fishermen and fishermen, and report to the town government in time. Border posts, police stations and ship management stations should cooperate with the evacuation and resettlement of fishermen, strengthen patrol and duty in the jurisdiction, and ensure the stability and stability of the jurisdiction.

Town and village cadres are on duty 24 hours a day, establish and improve the disaster prevention and relief information network, and report the situation in time. When the typhoon lands, the personnel of towns, village cadres, border posts, police stations and ship management stations should stick to the key fishing ports and seawalls for typhoon prevention for 24 hours to prevent dangerous situations and mobilize all forces to do a good job in wind resistance and emergency rescue.

;