Joke Collection Website - Public benefit messages - Brief notice of flood control and flood fighting

Brief notice of flood control and flood fighting

Flood control briefing (7 selected articles)

In today's social life, we use notices more and more, and various types of notices have different writing methods. Do you know how to write a formal notice? The following is a short notice (7 selected articles) about flood control that I collected for you for your reference, hoping to help friends in need.

Brief notice on flood control and flood fighting 1 Urban Housing and Construction Bureaus, Development Zone Construction and Development Bureaus, and property companies: According to the flood control requirements of the Municipal Flood Control Office, the Municipal Real Estate Bureau will organize relevant units to inspect the flood control work of the city's property service communities in view of the recent heavy rain intensity and concentrated rainfall. The relevant requirements are hereby notified as follows:

First, check the content. First, check the overall arrangement of flood control work in the property service community and the formulation and improvement of flood control emergency plan; The second is to check the implementation of flood control materials, communication equipment, equipment and vehicles; The third is to check the smooth drainage system of underground garage and basement and the integrity and maintenance of drainage facilities and equipment; The fourth is to check the inspection system of underground garages and basements in flood season, the reporting system of major events and the arrangement of 24-hour duty system.

Second, check the time. 20xx July 13 to 14.

Third, check the organization. Led by Wu Jun, Tao Tinghui, Shang Maosong, Chen Xinsheng, Kong Qingyong and Li of the Municipal Real Estate Bureau, it is divided into seven inspection teams. The members are composed of seven comrades including the Municipal Real Estate Bureau, Lu, Liu, Fu Zhihai, Zhou, Yang and Cheng Chunchun, and the staff of the Housing and Construction Bureaus of various urban areas and development zones.

Fourth, job requirements. For the problems found in the inspection and the potential safety hazards, the relevant units should be ordered to rectify immediately. If the rectification is not effective, it will be notified to the whole city. At the same time, each inspection team sorted out the inspection situation and formed written materials for future reference.

Notifier:

Xx、xx、XX、XX

Brief notice on flood control and flood fighting 2. Housing and Construction Bureau and property service enterprises in all districts:

As the flood season is approaching, in order to do a good job in flood control in urban residential areas and ensure the safety of people's lives and property, relevant matters are hereby notified as follows in combination with the characteristics of the industry:

First, clear responsibilities, do a good job of implementation

The property management departments of all districts are responsible for the flood control work of residential quarters within their respective administrative areas, set up leading groups for flood control work, formulate emergency plans for flood control and drainage, equip them with necessary emergency facilities and equipment, set up emergency teams, and supervise and inspect the flood control work of property enterprises within their respective jurisdictions.

All property enterprises should formulate emergency plans for flood control and drainage, establish duty system in flood season, and equip them with a certain number of drainage pumps and emergency power equipment. Take the project office as the unit, establish a rescue and drainage reserve team of not less than 5 people, and reserve sandbags, wood, rain boots, flashlights and other necessary materials.

The communication equipment of the main person in charge of each enterprise and the person in charge of the project department shall be kept open for 24 hours. In case of sudden danger or accident in residential areas, it should be reported in time, and the main person in charge should rush to the scene to organize and direct rescue without delay.

The second is a comprehensive inspection to eliminate hidden dangers.

All property companies should combine the characteristics of this community to carry out dragnet investigation and rectify hidden dangers in time. Conduct a comprehensive and careful inspection of flood control and drainage facilities, dangerous buildings, dangerous walls, external wall hanging objects, basements, underground garages, equipment and facilities, rainwater pipes, open ditches and culverts, etc., clean up pipes, nets, pools and wells in time, and eliminate hidden dangers in time. Especially for elevators, pumps, monitoring and other important equipment, prepare for flood control. If the facilities and equipment are damaged due to poor flood control, the enterprise shall be responsible for maintenance.

Third, strengthen supervision, and the responsibility lies with people.

The competent departments of all districts should strengthen the inspection and guidance of flood control work in the property service areas under their jurisdiction, and urge the property service enterprises to make timely rectification for the problems and potential safety hazards found.

I hereby inform you.

Notifier:

Xx、xx、XX、XX

Brief notice on flood control and flood fighting 3 Dear xx owner:

Hello!

The city has entered a period of concentrated rain, and property management companies have carefully organized and implemented various flood prevention preparations. In order to ensure the safe passage of residential areas in flood season, residents are specially reminded to pay attention to the following points:

1. Please check and clean the silt and sundries in your balcony, terrace, sunken garden floor, floor drain and drainage pipes, and keep the drainage unblocked to avoid blocking the floor drain and rainwater backflow.

2. Please check and strengthen the decoration of balcony and terrace, outdoor air conditioning, etc. Please put all kinds of falling objects such as flower pots indoors to avoid injury accidents caused by falling objects.

3. For long-term unoccupied or vacant houses, please take the time to check the drainage system of the house.

Please close the doors and windows before going out. (For example: balcony, balcony doors and windows; Casement window; Skylights, etc. )

Thank you for your support and cooperation in the work of the property management company!

Notifier:

Xx、xx、XX、XX

Brief notice on flood control and flood fighting 4. County Housing Authority, Shanxian Property Office and property service enterprises:

In order to do a good job in flood control in residential areas, improve the ability of flood control and disaster relief, and create a safe living environment for residents in residential areas, according to the spirit of the Notice on Preparing for Flood Control in 20xx by the Flood Control and Drought Relief Headquarters of xx Municipal People's Government, relevant matters are hereby notified as follows:

The first is to further enhance the understanding of the importance of flood control work.

The flood control work in residential areas is related to the safety of people's lives and property, the overall situation of the construction and stable development of safe residential areas, and it is of great responsibility. In recent years, extreme weather events have occurred frequently, and the suddenness and unpredictability of rainstorm and flood disasters have become prominent. Therefore, in the spirit of being highly responsible for the safety of people's lives and property, all departments at all levels must further improve their understanding of the importance of flood control work in residential areas, unify their thinking, clarify their tasks, strengthen leadership, improve their organization and improve their measures, effectively enhance the predictability, pertinence and effectiveness of flood control work, base themselves on preventing major floods, seizing major risks and saving major disasters, carefully organize and make careful arrangements to ensure that heavy rainfall will not hurt people and residents' property will be less lost, and do a good job in all aspects.

Two, focus, seriously organize flood control inspection.

All property management departments should pay close attention to the flood control work of residential quarters under their jurisdiction to conduct a comprehensive inspection, and ensure that every quarter and every link is checked again. In particular, it is necessary to strengthen the inspection and implementation of flood control responsibility system, emergency rescue plan, rescue team and rescue materials of residential property enterprises. For the existing problems, it is necessary to designate a special person to be responsible for rectification within a time limit, leaving no dead ends and hidden dangers. The realty service enterprises should closely combine the actual situation of residential quarters, concentrate on the time before the flood season, and organize the dredging of drainage ditches and sewage pipes with serious siltation, especially for septic tanks and sedimentation tanks that have not been cleaned all the year round, strictly fulfill the cleaning responsibility, and resolutely put an end to the occurrence of sewage overflow. In addition, it is necessary to strengthen the management of traffic roads in residential areas, especially in the main flood season, to properly arrange parking positions, to prevent the occupation of drainage manhole covers from affecting poor drainage, and to improve the ability of flood control and waterlogging elimination.

The third is to strengthen organizational leadership to ensure that flood control work in residential areas is in place.

① Strengthen leadership. In order to do a good job in flood control in residential quarters, the municipal property department has set up a leading group for flood control in residential quarters, and the property management departments and property service enterprises in counties and districts should also set up corresponding organizations and leading bodies to ensure that their understanding, responsibilities, organization and work are in place.

(2) Clear responsibilities. All property service enterprises should establish various flood control responsibility systems with the manager responsibility system as the core, implement grading, subcontracting, job creation, technical responsibility, flood control duty system and emergency handling mechanisms such as liaison, convening and mobilization, ensure that each link and project has a clear responsible person and responsibility target, and ensure the manpower demand for flood control and emergency rescue.

(3) Strengthen supervision. All property management departments should establish an evaluation system for the implementation of flood control responsibility system, strengthen inspection and supervision, promptly urge rectification, and ensure the implementation of flood control and disaster reduction work.

Notifier:

Xx、xx、XX、XX

Brief notice on flood control and flood fighting 5. Each construction project department:

According to the latest weather forecast issued by the Inner Mongolia Meteorological Bureau, our city will face heavy rain and heavy rain, which will easily lead to natural disasters. In order to ensure the absolute safety of personnel and property of my project management department, ensure the safe and smooth progress of the project, make the project pass the flood season smoothly and minimize the impact of the rainy season on the construction. According to the requirements of superiors, the project manager department is required to make specific arrangements for flood control and fighting in rainy season:

First, the project department is required to set up a leading group for flood control, which is responsible for organizing comprehensive flood control work. The office of the leading group for flood control and flood fighting command is located in the security department of the project department, and the security officer of the security department is responsible for collecting the daily weather forecast information and informing the members of the flood control team of the weather forecast. When the higher authorities release flood warning information, coordinate the relevant departments and units to do a good job in flood warning and response, and implement the relevant flood control emergency measures of the higher authorities.

The second is to highlight key points and intensify the elimination of dangerous situations. All construction project departments are required to attach great importance to it, strictly strengthen the prevention work, quickly check the disaster-prone points one by one, find out the situation on the construction site, and concentrate on the work of eliminating dangers. To grasp the key points:

1, the parking position of large mechanical equipment needs to be reinforced;

2, the site drainage system dredge;

3, site materials, temporary electricity should be covered, etc.

Four, strengthen the responsibility, adhere to the duty inspection system. Flood control leaders of each project department.

The team should strictly implement the day and night duty system, and adhere to the 24-hour site inspection duty system in rainy season and flood season. Team members shall stick to their posts, and shall not leave their posts without authorization. They shall be vigilant at any time, observe carefully, especially pay close attention to dangerous areas, and immediately report possible dangers to the project management department. In view of extreme weather changes, do a good job of "before rain, during rain and after rain" inspection. In case of danger, start the emergency plan quickly and organize emergency rescue immediately to prevent the accident from expanding, minimize losses and ensure the personal safety and property safety of personnel.

5. Add flood control facilities and prepare emergency materials for flood control. On the premise of ensuring the smooth progress of flood control, each project department should give priority to prevention, prepare sufficient flood control materials and equipment, ensure the timely supply of flood control materials, and educate all personnel on flood control and flood control safety to make them realize the importance and harm of flood control and flood control.

It is hoped that all construction project departments will take action immediately after receiving this notice, do a good job in flood control and flood fighting and do a good job in implementation.

I hereby inform you.

Notifier:

Xx、xx、XX、XX

Brief Notice on Flood Control and Fighting 6 Companies, Departments and Offices:

The flood season of 20xx has arrived. In order to ensure the safety of the Group's mining enterprises, ground enterprises and other units, through the research of the Group leaders, the following arrangements are made for the Group's 20xx safety flood season:

The first is to set up a leading group for flood control and fighting. The head of each unit is the first responsible person, so we must attach great importance to flood control and flood fighting, and set up a flood control and rescue commando team. There should be a sound organization, clear responsibilities and tasks, and orderly command. The telephone number of personnel on duty in key positions should be kept open for 24 hours, pay attention to the weather forecast, report problems in time and deal with them properly, especially in the case of abnormal weather such as strong wind, heavy rain and high temperature, and do a good job in disaster prevention and relief to ensure the safety of the group.

The second is to formulate emergency plans for flood control and fighting. All units shall, according to the experience of flood control and flood fighting in previous years and combined with the actual production situation this year, formulate the 20xx emergency plan for flood control and flood fighting, and make careful arrangements for all the work in flood season, so as to plan, arrange and prepare early to ensure foolproof.

The third is to implement flood control materials. All units should prepare enough iron wires, woven bags, shovels, wallets, raincoats, rain boots, flashlights and other materials.

Notifier:

Xx、xx、XX、XX

Brief notice on flood control and fighting. Project supervision institutions and business departments:

According to the forecast of Shuozhou Meteorological Observatory, from July 22 to July 26, there will be rain in most areas of our city, and there will be heavy rain in some areas. According to the requirements of the Municipal Construction Bureau, the project supervision institutions and business departments should arrange and urge all construction units to do a good job in flood control at the construction site according to the actual situation at the site. The relevant matters are hereby notified as follows:

First, urge the construction unit to strictly implement the duty system, strengthen emergency preparedness, improve emergency plans, and implement emergency materials and equipment.

Second, the dangerous subdivisional work such as deep foundation pit and high support collision should be checked one by one to ensure that the project does not have any accidents.

The third is whether lightning protection and grounding facilities are in place.

Four, for lifting operations, aerial work, limb operations, earthwork operations and other operations should have sufficient safety facilities before, if there are any safety and quality hazards, immediately stop, stop operations when necessary.

Verb (abbreviation of verb) Check whether the drainage facilities, machines and personnel at the construction site are properly arranged.

For the above points, the supervisors of the project supervision agency will immediately implement them, and ensure the smooth communication for 24 hours to ensure the safety of life and property.

Notifier:

Xx、xx、XX、XX

;