Joke Collection Website - Public benefit messages - Property pre-holiday safety inspection activity plan

Property pre-holiday safety inspection activity plan

In order to ensure that work or things are carried out in an orderly manner, it is often necessary to prepare a plan in advance. The plan is a written plan arranged in terms of purpose, requirements, methods, methods, progress, etc. How to make a plan? The following is a pre-holiday property safety inspection activity plan I compiled for you. It is for reference only. You are welcome to read it. Property pre-holiday safety inspection activity plan Part 1

In order to ensure that the property company’s Spring Festival safety work is carried out in a solid and orderly manner, so that all owners can spend a safe, stable, peaceful, warm and happy New Year, combined with the actual work , specially formulate a safety work implementation plan.

1. Guiding ideology

Based on the principle of "safety first, prevention first" and in accordance with the safety work plan, we conduct comprehensive and detailed safety inspections on the work of each department to provide the best possible safety for the owners and their families. Create a good Spring Festival safety environment.

2. Activity theme

Check for hidden dangers, strictly manage, prevent accidents, and ensure safety

3. Activity organization

Team leader:

Deputy leader:

Members:

4. Time schedule

January 15-18, 20xx

5. Arrangement of activities

1. Self-examination and self-correction phase (January 15-17)

According to the special inspection requirements, each department carries out self-inspection and self-correction safety During the major inspection activities, we will formulate a work progress schedule for the discovered and existing safety hazards and problems, clarify the person responsible for rectification, and effectively implement the safety work.

2. Joint inspection stage (January 18)

Based on the rectification reports reported by various departments, the property management company adopted random inspections, surprise inspections, etc. on January 18 to carry out inspections on various projects. A joint inspection will be conducted to supervise the inspection, investigation and rectification, focusing on the inspection of hidden dangers in each project.

6. Several requirements

1. Unify our thinking and focus on management. All departments carried out safety inspections in an orderly manner in accordance with the safety work plan, tightening the string of "safety is no small matter" to ensure that there are no mistakes in safety work during the Spring Festival.

2. Do a good job in publicity and create an atmosphere. Property companies can improve the safety awareness of all owners and create a safe atmosphere by issuing safety notices to owners and hanging safety banners.

3. Implement responsibilities and take responsibility at all levels. Do a good job in daily security work, strive to increase the intensity of inspections in each building, report problems in a timely manner, do a good job in security duty, truly take responsibility for the work, and ensure the safety of the community. Property Pre-holiday Safety Inspection Activity Plan Part 2

In order to implement your bureau’s “Notice on Strengthening Fire Safety Management of Residential Areas and Office Buildings” and ensure the normal working order of the Huandao Business Center, all fire safety hazards will be Nip it in the bud. All employees of our company conducted a comprehensive fire safety inspection on the Huandao Business Center office building in accordance with the requirements of the "Notice". The status of this safety inspection is now reported as follows:

1. Read the full text of the "Notice" at the department's regular meeting.

Departments are required to pay more attention to fire safety work from top to bottom, study the "Fire Emergency Plan" formulated by the company, master the use of fire extinguishers and fire hydrants, keep in mind their respective safety responsibilities according to the "Fire Emergency Plan List", and implement Fire safety accountability system. Warm reminders are posted at the elevator entrance, fire safety publicity work is done well for customers, and fire safety work is done together with customers to prevent the occurrence of fire.

2. Fire safety inspection work.

1. Conduct regular fire safety inspections every month with the Government Affairs Bureau and Huandao Police Station on the key fire protection areas of the Huandao Business Center office area, including various equipment rooms, and make corrections to any problems found. rectified in a timely manner.

2. Arrange security guards to patrol every day and remind cleaning staff to pay attention. Once debris is found stacked in the passage, immediately notify the owner to remove it to ensure that the passage is unobstructed.

Reinspect fire extinguishers, fire hydrants, fire pumps and other fire protection facilities in the building. Ensure that fire extinguishers and fire hydrants are in good condition and effective, and that evacuation signs and emergency lighting facilities are operating normally.

Our company will take this fire safety inspection as a starting point, continue to do a good job in fire safety management, and strive to create a safe and peaceful working and living environment for the owners. Property Pre-holiday Safety Inspection Activity Plan Part 3

In order to ensure the smooth progress of safe production during the service process of the project, ensure that no safety accidents occur during the property management service period, and ensure the safety and health of the employees of the property management office, and the smooth To achieve the purpose of safe production, improve the standardized management of safe production in the property management office, and implement "safety first, prevention first", the following safety production inspection system is specially formulated.

1. The purpose of production safety inspection

Establish a full-time production safety management organization and a production safety guarantee system that are suitable for the service scale, and equip them with corresponding management capabilities and a sufficient number of full-time safety personnel Production management personnel also establish and improve the safety production management responsibility system, formulate and determine safety production assessment indicators, and improve various safety production rules and regulations, reward and punishment methods, and operating procedures.

2. Contents of production safety inspection

1. Check administrative measures. The content mainly includes: checking leadership, checking system, checking hidden dangers, checking organization, checking education and training, and checking accident handling.

2. Check the safety facilities. The content mainly includes: checking the use of safety facilities, mechanical equipment, and labor protection supplies.

3. For hidden dangers discovered during the inspection, a hidden danger rectification notice will be issued, rectification will be made within a time limit, and rectification measures and results will be written in writing and reported to the property management office within the time limit. Relevant penalties will be imposed on departments that ignore the existence of hidden dangers and fail to rectify the discovered hidden dangers.

4. The production safety leading group of the Property Management Office and relevant departments will conduct an on-site review of the rectification results of hidden dangers. If it is found that rectifications have not been made on time or are not thorough, and hidden dangers still exist, the relevant responsible persons will be punished. Until the unsafe factors are completely eliminated.

5. Each department manager formulates and improves the safety production management system of the department, allocates part-time safety management personnel in accordance with relevant regulations, implements safety production management responsibilities, organizes supervision and inspection of the implementation of safety management work, and conscientiously implements Good inspection records.

3. Methods of production safety inspections

1. Regular production safety inspections

The general manager of the property management office is responsible for leading the production safety leading group to organize relevant departments , organize a comprehensive safety production inspection every quarter.

2. Regular and holiday safety production inspections

Regular inspections include inspections organized by each department, departmental safety officers conducting tours of safety production, and safety production inspections before holidays.

3. Professional production safety inspection

Professional production safety inspection content: including electrical safety, fire safety, and the safety of various mechanical equipment such as lifts and cranes, general safety The problem is subject to individual professional inspection. Property Pre-holiday Safety Inspection Activity Plan Part 4

In order to conscientiously implement the safety production policy of "safety first, prevention first", further strengthen safety management, do a good job in safety production, and eliminate various safety accidents, To ensure that the company's safe production and equipment operation are stable throughout the summer, according to the spirit of the "2013 Spring Safety Inspection Plan" issued by the company, the property management company has carried out spring safety inspection activities within the department from March 5. The main tasks will now be The work report is as follows:

1. Rectification of problems found in the 20xx spring safety inspection

In the 2013 spring safety inspection, our department *** found 45 problems , of which 39 were reported to the company and 6 were reviewed; for the 45 identified problems, we actively organized personnel to carry out rectifications. As of April 10, 41 rectifications had been completed, 2 of which were included in the department's May plan. Implementation, 1 item has been canceled, 1 item is being rectified (pending the arrival of spare parts from the Engineering Department), and the other 1 item has been postponed due to the recent sporadic projects of the Engineering Department.

2. Unified deployment and highlighted key points

According to the planning requirements of the company’s spring safety inspection work, the Property Management Department carefully deployed and unified arrangements for the spring safety production management work, and established An inspection team with the department manager as the team leader and the team foreman as the deputy team leader.

According to the actual situation of the property management department, we formulated a decomposition plan and organized learning, and actively participated in the company's spring safety examination. 100% of employees participated in the examination, the pass rate was 100%, and all employees passed the company's examination. According to the company's spring inspection planning plan, the departments were decomposed and the main contents of the safety inspection were formulated as follows:

(1) Check the thinking;

(2) Check the management and system;

(3) Check for “anti-accidents” and “anti-violations”;

(4) Check for equipment defects and hidden dangers;

(5) Check for equipment Implementation of summer measures;

(6) Check the implementation of flood prevention work;

(7) Check the development status of star-rated teams, etc.

3. Self-inspection and rectification situation

According to the requirements of the company’s spring safety inspection plan, the property management department determined the inspection focus based on its own characteristics, including the Qixing water station equipment, Food hygiene, greening maintenance, typhoon and flood prevention, fire prevention, implementation of various rules and regulations, employee heatstroke prevention and cooling, safety equipment, etc. are classified and sub-inspected. During the inspection process, the focus is on spring fire prevention, peak summer and typhoon and flood prevention. measure.

1. Implementation of the production safety responsibility system and implementation of the safety management system

(1) According to the actual situation of the department, the persons responsible for safety at all levels and teams are clarified, and they are encouraged to increase their supervision. Strengthen the inspection of the "three violations" in the cleaning of the administrative building, the production of Qixing Water Station, and the greening maintenance work.

(2) Each team and department manager has improved their understanding of production safety, is responsible for the work under their jurisdiction, and ensures the completion of the safety production indicators of the department throughout the year. Each team holds a safety activity study session every week. The department regularly checks the safety activity records of each team and guides employees to improve safety awareness and prevent the occurrence of various accidents.

(3) For newly hired temporary workers in greening, the department strictly implements the three-level safety training system. While strengthening the operational skills training for new employees, the greening team also focuses on the hazard sources and prevention on the job. measures for training.

(4) Actively rectify various irregularities found in accordance with relevant rules, regulations and management standards. By drawing inferences from one example, we will carefully identify deficiencies in our work and formulate relevant rectification measures to improve them. . At the same time, opinions, suggestions and existing problems from each team were also fully collected, and the departments actively coordinated to solve them.

2. Implementation of equipment hidden danger management and equipment safety summer measures

(1) Timely discovery and elimination of defects is the first guarantee for safe operation of equipment. In order to manage hidden dangers, the greening team inspects all greening machinery to check whether the rotating parts of the equipment are reliable and firm, whether the belts are aged, whether the safety operating procedures are complete, and whether the inspection records are complete. At the same time, lawn mowers, lawn mower trucks, and sprayers are inspected. , hedge trimmers, gasoline engine water pumps and other equipment are delivered to designated locations for professional and comprehensive maintenance; Qixing Water Station conducts inspections on production safety and food hygiene, inspects pure water production and filling equipment one by one, strengthens hygiene management in the production workshop, and clarifies the division of labor , detailed records. The disorderly stacking of spare parts in the warehouse was rectified, large storage boxes were purchased to hold bottle caps, all items were classified and arranged, and shelf signs were improved to improve the previous messy storage, ensure that the account cards were consistent, and improve the water station environmental quality.

(2) Based on their own conditions, each team team worked with the engineering management department to formulate practical rectification measures for the equipment during the summer, and carried out seasonal inspection and maintenance of the equipment in advance. At the same time, in response to possible situations that may occur in the summer, Discuss accident anticipation and safety learning. Together with the Engineering Management Department, we inspected and rectified the air-conditioning equipment, exhaust fans, and lighting systems in the area under our jurisdiction, strengthened the investigation and treatment of hidden dangers in water supply and drainage pipelines, and eliminated the risks of leakage and leakage.

3. Safety equipment verification

In April, the two safety belts used by the greening class were verified one by one, and one safety belt that failed to pass the verification was inspected. scrapped.

4. The progress of the spring safety inspection

According to the time schedule of the "20xx Spring Safety Inspection Plan" issued by the company on February 27, the department organized foremen and Each team and group was required to make full use of the meeting before and after the class to thoroughly study the requirements of the plan, and seriously carry out different forms of self-examination and rectification.

Through department self-examination and review, *** discovered 45 problems, 41 of which have all been rectified and closed.

Through the spring safety inspection, the safety awareness of all employees has been further increased and the foundation of safety management has been consolidated. But at the same time, some shortcomings in management have been exposed. We will continue to improve in future work, improve the level of safety management, and better provide safety guarantee for the company's development and logistics services. Pre-holiday property safety inspection activity plan Part 5

Recently, many fires occurred in various places have sounded the alarm for everyone. The construction site itself is a frequent location for fires, especially due to the climate environment in the north. Therefore, we should be more vigilant and enhance fire safety awareness. This fire safety self-inspection and self-inspection activity is in accordance with the spirit of the relevant meetings and documents of the Taonan City Fire Department. At the same time, in order to prevent and reduce the occurrence of fires and try to avoid the loss of people's lives, property and materials, the work is carried out seriously from top to bottom. The self-inspection and self-evaluation of the work status are now as follows:

1. Fire safety management work:

1. Establish and improve the organizational structure. Person responsible for fire safety: XXX Fire safety manager: XXX

2. The safety responsibility system has been implemented. The fire safety responsibilities of each position were formulated, the division of labor among the fire safety team members at the construction site was clarified, and fire drill plans were made.

3. A safety management system has been formulated for workers’ living areas and office areas for project managers, eliminating some hidden dangers in the process of using electricity in daily life.

2. Carry out various on-site inspections carefully

In accordance with the spirit of the county fire department, our project department carried out daily small inspections, weekly inspections, and monthly inspections on fire safety work Summarize the method and conduct a comprehensive safety inspection of various facilities on the construction site. At the same time, we analyzed the inspection results and asked fellow investigators to hold a serious meeting to summarize. Be truly aware of the situation, eliminate blind spots, and eliminate all hidden dangers. The specific inspection information includes the following major items:

1. Whether the fire escapes, safety exits, etc. at the construction site are in compliance with the regulations;

2. Fire hydrants, fire water pipes and other fire-fighting facilities Whether the installation, operation and configuration of fire-extinguishing equipment comply with regulations;

3. Whether the electrical wiring laying and operation of electrical equipment at the construction site comply with regulations;

4. Interior decoration at the construction site Whether the fire resistance of the decoration materials complies with the site entry regulations;

5. Whether there are fire safety hazards in the working conditions of workers at the construction site

3. Fire safety publicity and education work:

1. Our project department has included fire safety as required information in the third-level safety education for workers, and carries out safety education activities every month to enhance workers’ fire safety knowledge through safety education.

2. Our project department also registered key fire protection areas at the construction site and set up obvious signs to remind workers to pay attention to fire safety at any time.

3. A "fire drill" activity was carried out, during which the construction workers understood how to rescue themselves in the event of a fire.

After this month of hard work, the fire safety work of our project department has achieved initial results. After several inspections by the fire department, we also found several hidden dangers. Our project department made rectifications in a timely manner and obtained Fire Department Approval.

Of course, in the future work, we will continue to work hard to strengthen publicity efforts and improve workers’ fire awareness; regularly and irregularly carry out fire prevention duty safety inspections to permanently eliminate the occurrence of fires on the construction site . Property Pre-holiday Safety Inspection Activity Plan Part 6

1) Fire inspection includes inspection of fire equipment, equipment, decoration, passages, flammable and explosive items and changes in house use, including electricity and gas use Safety and hot work inspections.

2) The person responsible for fire protection of each project is also the fire inspector. At the same time, the work of the person responsible for fire protection must be inspected by relevant departments and company leaders at any time.

3) For inspection items, see "Fire Protection System Inspection Items".

4) The project leader arranges for the security team or electromechanical team to inspect the fire extinguishers every quarter and replace or replenish them according to the prescribed time. Expired storage is not allowed.

5) Conduct inspections in accordance with the provisions of the "Fire Protection System Inspection Items". Detailed records must be made during the inspection. Those that do not meet the requirements should be rectified as soon as possible.

6) The electricity, equipment and wiring of public places within the property area (property area) should be inspected once a month and detailed records should be kept. Where there are hidden dangers, repairs must be made promptly or relevant departments must be notified to deal with them.

7) Once discovered, any behavior of privately taking over the lines will be stopped, and a violation rectification notice will be issued to rectify within a time limit. Those who refuse to rectify will be enforced and punished in accordance with relevant regulations.

8) Strictly implement the decoration approval system. All fire work must be approved by the fire protection agency and the property management company before construction. The property management company should do a good job in registration and supervision of the entire process.

9) Actively cooperate with relevant gas supply, power supply, and fire-fighting agencies to conduct fire inspections.

10) Personnel on duty should inspect the public access passages every day, clear blocked items, and flammable and explosive items in a timely manner to keep the passages smooth. The number of inspections should be increased in key fire prevention areas such as restaurants, karaoke OKs, restaurants, shopping malls, and basements. If the original use of the house is changed, the owner shall be ordered to restore the original approved use.

11) Order maintenance personnel should prevent people from carrying flammable and explosive items into the property area in accordance with regulations. Property Pre-holiday Safety Inspection Activity Plan Part 7

In order to facilitate safety management work, combined with the actual situation of this project position. Achieve checks at all levels, the first level of work; at the construction site, decoration personnel enter and exit the construction site with the construction pass. Visitors must obtain approval from hospital personnel and make relevant registration before entering. Check the items going out. Large items must go to the management office to issue a release slip before they can be taken out.

In order to further standardize the work of the Safety Management Department, gradually move toward standardization, institutionalization, and formalization, improve the department's combat effectiveness, and ensure the completion of hospital property safety management work, this plan is specially formulated. The specific matters are as follows:

The current safety management department has the following problems:

1. The department system is not perfect and cannot achieve the role of using the system to manage people;

2. The team members are mentally unstable, have insufficient personnel, have dawdling thoughts, do not understand the company, have many communication problems, and have few equipment for amateur cultural activities;

3. Public security management is chaotic; < /p>

4. The number of vehicles has increased, and there is a serious phenomenon of random parking of cars;

5. The fire protection system is not functioning properly;

6. The quality of department personnel varies. Not uniform, service quality needs to be improved.

1. A century-old system and a century-old brand;

First of all, we must establish and improve departmental rules and regulations and fully implement institutionalized management. The Security Management Department is a military-style management team. Chemical management must be guaranteed by strict discipline. Based on the current situation of our department and the actual situation of the company, we formulated the "Internal Security Reward and Punishment System", "Basic Knowledge of Fire Safety", "Procedures for Handling Various Sudden Emergency Events" and "Work Responsibilities of Each Department Position" in accordance with the Iso quality standards of the property safety management work procedures. ”, “Job Work Process”, “Job Service Civilized Terms” and other systems. Pay close attention to discipline and style, strengthen execution, and enhance team members' service awareness. Team members who violate company regulations and fail to meet job requirements will be punished in accordance with regulations; team members who are proactive, act in the interests of the company, work seriously and responsibly, and have a good service attitude will be rewarded according to the prescribed standards. Make rewards and punishments clear and improve team members' work enthusiasm.

2. Ideological and political work

As the number of open departments in the hospital continues to increase, the work responsibilities of the departments have increased. Coupled with the inconvenience of accommodation and boring spare time life, team members are not satisfied with the salary. Various problems such as low welfare and lack of benefits have caused personal emotions and a weak sense of responsibility among some team members. In response to these problems, we must mobilize the backbone of the department to carry out various ideological work with the theme of dedication, excellence, and dedication. We must first adopt persuasive education to change the ideological attitude of the team members and strengthen their sense of responsibility. If a small number of team members do not We must take timely measures to change. Report to the company and terminate incompetent team members.

Since the safety management department has a large number of personnel and a high turnover of personnel, it is necessary to organize regular department meetings and other activities in a timely manner to communicate with each team member, convey the company's policies, instill the company's corporate culture, and service concepts to guide team members to establish a good life. outlook, values, worldview, and a correct attitude towards work. Where conditions permit, dormitories will be equipped with televisions and other cultural and entertainment equipment to enhance the team members' sense of belonging and maintain the stability of existing personnel.

3. Public security management

Resolutely implement the policy of "prevention first, combining prevention with control". In order to facilitate safety management work, combined with the actual situation of the project position. Achieve checks at all levels, the first level of work; at the construction site, decoration personnel enter and exit the construction site with the construction pass. Visitors must obtain approval from hospital personnel and make relevant registration before entering. Check the items going out. Large items must go to the management office to issue a release slip before they can be taken out. For the second level of work, the monitoring center will monitor the open areas. The team members are also required to "perform civilized duties and treat others politely" to establish a good job image, practice etiquette and courtesy, and proactively provide high-quality services to the hospital, patients and their families. Decoration management: As the number of units being renovated increases in the area, the number of illegal decorations also increases. According to the actual situation, department personnel are dispatched to cooperate with the engineering department to strengthen the management of decoration construction personnel, promptly discover safety hazards, standardize the behavior of construction personnel, promptly stop violations, and take corresponding measures to maintain orderly construction. In addition, the idle personnel in the area were promptly cleaned up, and effective prevention and control effects were achieved. Prevent the occurrence of various accidents. Patrol work: Arrange special personnel to conduct strict inspections of public places, floors and other locations in the area every day. Team members follow the patrol methods prescribed by the department and sign in at each check-in point on time. Carefully inspect the property supporting facilities, equipment and various equipment in the area. Timely discover safety hazards, stop violations, and ensure normal order in public areas. It ensures the personal and property safety of the hospital, patients and their families in the area.

4. Vehicle Management

As the number of areas open to the project increases, it brings severe challenges to our vehicle management work. According to the actual situation, we must first standardize the vehicle entry and exit management operating procedures, guide vehicles into the garage and park in designated locations according to regulations, so as to avoid random parking of vehicles in the area. In addition, the inspection of vehicles should be strengthened to promptly discover unsafe factors and eliminate hidden dangers in a timely manner.

5. Fire management

Resolutely implement the policy of "prevention first, combining prevention and fire" and strictly implement fire protection laws and regulations. For the fire protection facilities, equipment, various fire protection equipment and monitoring systems in the area, conduct regular fire inspections, and cooperate with the fire protection maintenance unit to conduct comprehensive debugging of the fire protection system to ensure the normal operation of the fire protection system and to maintain emergency response at any time. In addition, The department must form a strong volunteer firefighting team and be ready for battle at all times.

6. Training Management

Training is an important task. We must always persist in constantly improving the professional quality of employees and integrate theory with practice: "Military Training" "Individual Soldier Queue Actions", "Position Operating Procedures", "Emergency Handling Procedures", "Basic Knowledge of Property Management" and "Basic Firefighting Knowledge" require all team members to maintain a steady attitude, use them flexibly and properly when handling various incidents. deal with. Improve team members' ability to handle emergencies. Treat the hospital, patients and their families with a working attitude that cares about the hospital and the patients' needs, and thinks about the hospital and the patients' needs, so as to shape the image externally and strengthen the quality internally, and truly improve the service quality of department personnel and achieve good results. Training effect