Joke Collection Website - Public benefit messages - Drawing pinyin
Drawing pinyin
Drawings are graphic representations of engineering objects needed for construction, including dimensions, directions and technical parameters. It contains two meanings, which are included in the contract as the work of drawing; Supplementary and modified drawings issued by the owner (or his representative) according to the contract. 1999 The definition of drawings in the contract model published does not include the drawings provided by the contractor.
Drawing skills: When giving you a drawing, you must read it carefully, because a little mistake in the drawing will directly affect the construction.
1, from top to bottom, from left to right.
2, from the outside to the inside, from big to small, from coarse to fine.
3. See the drawings for comparison, and refer to the construction and equipment drawings for combination.
4. Look at the overall foundation map first, and then look at the local detailed map.
Drawing management method:
1. Centralized storage of drawings: the organization builds a centralized storage platform for massive documents to realize unified storage and * * * sharing of drawings and documents.
2. Drawing version management: E6 has a powerful version management function, and documents are associated with multiple versions to avoid the loss caused by using the wrong version. At the same time, it supports non-version history viewing, rollback and download.
3. Drawing approval: customize the document approval process to meet the needs of drawing document management within the enterprise. During the approval process, process personnel can sign, withdraw and modify through mutual consultation. Every time the process is completed, the relevant personnel in the node will receive instant messages, emails and short messages, which truly realizes the automatic circulation of drawing documents, saves a lot of transmission costs of drawing documents, speeds up the examination and approval of drawings, and really improves office efficiency.
4. Automatic numbering of drawings: the system provides 25 variables, which can be freely combined to design numbering rules. Matching conditions with rules can achieve the effect of flexible numbering, and a large number of drawings uploaded to the system can automatically generate numbers, which reduces the time for manual numbering debugging and improves work efficiency.
- Previous article:2022 Jiangsu Adult College Entrance Examination Results
- Next article:The SMS fixed number has been turned on. Where can I set it?
- Related articles
- Can you eat snakes when you shoot them?
- What are the greetings from soldiers?
- How to save your boyfriend by texting?
- Message to parents on the first day of kindergarten.
- How to ask for the wages owed by private enterprise bosses?
- Sent a short message to Ye.
- What authentication method does the mobile phone dynamic code belong to?
- What message can I delete?
- What are the query methods of comprehensive physical examination results of doctor qualification examination?
- Hello! My agricultural bank card was deducted for no reason. What happened?