Model essay on minutes of supervision regular meeting

The main purpose of the supervision meeting is to control the process of construction and production, so how to write the minutes of the supervision meeting? I'll give you some information about the model essay on the minutes of the supervision regular meeting, hoping to help you.

Minutes of Supervision Regular Meeting Fan Wenyi

Name of the meeting: Supervision Regular Meeting

Time of the meeting: _ _ _ _ _ _ _ _ _ _ _ _ _

Venue: Meeting Room of Special Investigation Team of Public Security Department

Participants: Construction unit:

Supervision unit:) Personnel of corresponding units

Construction unit: Moderator:

second, the construction unit (summarize the project situation last week and introduce the project plan this week, all of which need to describe the safety, quality, progress and coordination issues, etc., which must be introduced by the supervision unit at the meeting, and the project manager of the construction unit is required to attend and introduce at the meeting).

III. Supervision unit (each engineer of the supervision unit will summarize the project situation last week, and put forward supervision requirements on the project safety, quality, progress and issues needing coordination, and finally the director will summarize and supplement the introduction).

iv. the construction unit (the responsible engineers (including the engineering director) will reply to the construction coordination questions, comments and requirements).

5. Meeting resolution (the chief supervision engineer will summarize and form a resolution according to the above problems).

Minutes of Supervision Regular Meeting Fan Wener

Time: 1: a.m. on _ _ _ _ _ _ _ 2

Location: _ Office of Project Department of Construction Site

Meeting Theme: Check the implementation of last week's regular meeting and the work arrangement for next week

Meeting Chair: Wang _

Meeting content:

Construction unit. The main reason is that the tower cranes in 1#, 2# and 8# buildings have not risen to a certain height above the construction surface; The constructors in Building 9 didn't go to work in time. It should be emphasized that there was no plumber on duty when the supervisor inspected the reinforcement; The plumber was not present when the precast slab was installed, which caused the precast slab to crush the conduit, and the plumber's work was not done properly.

bid section 2: last week, the plan was delayed by three days. Mainly due to the influence of natural factors. Buildings 16# and 18# can catch up with the plan except for natural factors. On the one hand, the progress of Building 17 is slow, on the other hand, the carpenters are uncertain. Generally speaking, there is a shortage of construction personnel and technical management needs to be improved.

Bid Section III: Buildings 23#, 24# and 25# were held up for three days due to weather. If the weather is normal, the plan can be completed.

supervision unit:

1. Safety

1. In any case, the project department must give priority to safety work, and the safety section chief should intensify inspection. If any potential safety hazard is found, it should be stopped immediately and fine measures should be taken when necessary.

2: There is no photo attached to the reply form of safety rectification notice of quality inspection station, and the supervisor will not sign it for approval.

3: the fire safety work on the construction site is not in place, and there is only one fire control facility near the water tank in the north area, which is simple and does not meet the fire control requirements.

4: the outer frame has not been raised to a certain height in the working face, and some buildings have not yet set up safe passages.

5: the electricity consumption in the construction site is not in accordance with the specifications, and the wiring layout is messy, which has potential safety hazards.

6: at 3: pm, the supervisor and relevant personnel of the project department will carry out a safety inspection on all building numbers, mainly focusing on the erection of an outer frame, the construction of elevators, on-site electricity consumption, safe passage and other aspects.

2. Quality

Before building a layer of aerated blocks in the 1: 1 # and 16# buildings, the anchor lacing test must be done first, and the building can be carried out only after the test is qualified.

2: The construction unit and the laboratory shall determine the rebound position of the laboratory for concrete before painting.

at 3: 16 # building, when pouring concrete, the technicians and constructors were irresponsible to destroy the formwork support, so that a large amount of concrete fell into the lower rest platform.

4: The joints of precast slabs on the fourth floor of Building No.16 and the third floor of Building No.17 are not reinforced, and the concrete in some joints has reached the final setting state and has not been reinforced, so the project department should immediately organize personnel to make rectification.

5: Concrete pouring was carried out without inspection for the west and middle units on the fourth floor of Building 16 and the east unit on the third floor of Building 17, which seriously violated the construction procedure. The supervision department will punish your unit according to relevant regulations.

6: Winter is coming, so attention should be paid to heat preservation and protection during construction, especially the cement mortar needed for internal powder should be stirred with warm water. After painting, we should also pay attention to the insulation of the wall surface to avoid cracks in the wall surface.

7: technicians should strictly follow the plastering mixture ratio, and the plastering must be used up on the same day and not used again every other day.

third, the progress

1: The weekly plan has repeatedly failed, and only the 18# building can be capped within December 31st. The project department should take effective measures to arrange the construction progress reasonably.

2: None of the six buildings in the North District can be completed according to the construction plan, which seriously affects the overall construction progress.

3: The winter construction project department should pay attention to appease the construction workers, understand the workers' needs in time, and solve the difficulties encountered by the workers. Make workers devote themselves to the construction without affecting the construction progress.

Minutes of Supervision Regular Meeting Fan Wensan

Meeting Time: Tuesday, February 5, 213 at 9: a.m. Venue: conference room of on-site project department

Moderator: Tan Zhu

Recorder: Jiang Ruoqiong

Participants: (See the meeting sign-in table for details).

theme of the meeting: on-site Spring Festival arrangement

The main contents of the meeting minutes are as follows

1. The construction unit made the following speeches:

1. Strengthen safety education and training to improve the safety awareness of employees.

2. The construction drawings are incomplete, and I hope the construction unit will supplement and improve the drawings as soon as possible.

3. In the construction team, each shift leader needs to lead the construction personnel to do a good job in quality and safety.

2. The construction unit made the following remarks:

1. The construction unit needs to design and construct according to the drawings, and it needs to find the supervision department and the construction department to coordinate the construction when encountering work difficulties.

2.

3: All teams and groups of the construction unit are required to cooperate with each other, carry out the construction in strict accordance with the design drawings, and appoint professional technicians to assign work on site.

III. The supervision unit made the following statements:

1. It is required that conspicuous safety warning signs must be hung at dangerous parts of the construction site as required, and safety helmets must be worn when entering the construction site.

2: Special personnel must be responsible for the temporary electricity consumption during construction, the layout of power lines on site is not standardized, and weeds and garbage near the voltage device and distribution box should be cleaned up in time. It is forbidden to pile up construction materials near the voltage device and distribution box.

3: Seriously carry out the investigation of potential safety hazards, and actively prevent all kinds of production safety accidents.

4: The safety management personnel of the project department who started construction after the Spring Festival should quickly enter the normal working state, and the safety production management personnel should always adhere to the policy of "safety production, prevention first, comprehensive treatment", and can't wait until it is too late to make up for the accident. Before the resumption of work, the relevant units responsible for production safety at the construction site should seriously carry out a comprehensive safety hazard investigation on the key parts of the accident site, major hazard sources and key links prone to construction accidents: check whether there are safety hazards in the enclosure walls, migrant workers' dormitories and board houses at the construction site, and whether the fire-fighting equipment and facilities meet the specified requirements; Electricity for temporary construction, whether the line erection meets the requirements, whether the line is aging, whether the leakage protector fails, and whether the distribution box and switch box meet the requirements of electricity consumption specifications; Whether all kinds of mechanical limit safety devices have the phenomenon of working in spite of illness; Whether the scaffold and formwork support system are constructed in strict accordance with the scheme; Whether there are security holes or

deficiencies in the enclosure at the entrance and the edge. Ensure that all safety protection measures are implemented before the start of construction after the holiday, leaving no dead ends. The project department and various subcontracting teams should register the hidden dangers one by one, arrange enough funds, formulate rectification measures and arrange special personnel to be responsible for rectification. After rectification, they should be reported to the supervision unit for review, and work can be started only after they are qualified. Only by actively taking effective preventive measures in advance can we nip the safety accidents in the bud and ensure the safe production of construction to make a good start in the New Year.

5: Make the patrol situation during the festival, arrange personnel to carry out various safety inspections on the construction site, and make safety inspection records.

6: Before the festival, all temporary electricity consumption at the construction site must be cut off to avoid hidden dangers

Anhui Hengxin Construction Supervision Co., Ltd.

Description on February 5, 213

Note:

The minutes of the meeting are made in triplicate, one for the construction unit, one for the supervision unit and one for the contractor.

related articles:

★ supervision regular meeting minutes model essay

★ supervision regular meeting minutes content model essay

★ engineering supervision regular meeting minutes model essay 6

★ regular meeting minutes format model essay 6

★ supervision safety meeting minutes model essay

★ weekly meeting minutes model essay 6

★ 3 model essays on minutes of regular meetings of supervision

★ 3 model essays on minutes of internal meetings of supervision

★ 3 model essays on minutes of special meetings of supervision

★ 3 model essays on minutes of meetings of supervision companies.