Joke Collection Website - Public benefit messages - Model essay on flood control notice in 2022 (selected 6 articles)

Model essay on flood control notice in 2022 (selected 6 articles)

In rainy season and flood season, in order to effectively strengthen production safety in flood season, prevent all kinds of accidents and ensure production safety and the safety of employees' lives and property in flood season. The following is the model essay on flood control notice in 2022 (selected 6 articles) compiled by me for your reference only. Welcome to read this article.

Article 1: Notice on Flood Control and Fighting in 2022:

It has entered the rainy season. In order to effectively strengthen the work of production safety in flood season and prevent all kinds of accidents, according to the instructions of the state, province, city and company on wind prevention, flood prevention and lightning protection, we adhere to the principle of "safety first, prevention first, comprehensive treatment, preparedness", clarify responsibilities and implement measures to ensure the safety of production and the safety of employees' lives and property in flood season. The specific work items are hereby notified as follows:

A, the factory flood control, wind, lightning protection requirements

1, emergency preparedness:

(1) All departments should listen to the weather forecast, notice and other information in time and make emergency preparations. (2) The production department should prepare for flood control, set up a flood control team and check the implementation of flood control materials (sand, bags, shovels, etc.). ), stand by in case of flood.

2. Flood inspection:

(1) The production department shall conduct self-inspection on its outdoor electricity consumption, pipelines, lines and electricity facilities, and solve the problems before the flood season. Focus on checking the leakage and cracks in the wall of the house, report to the maintenance in time, and organize personnel to remove silt and water from the drainage pipeline;

(2) For the parts that are easily damaged by strong winds and easy to leak rain, it should be reported as soon as possible and a rectification and reinforcement plan should be formulated. After the approval of the company, we will strengthen and transform it to enhance our ability to resist strong winds and heavy rains and ensure that there will be no problems during the flood season.

(3) Prepare a standby pump where water may enter in advance. Once water enters, immediately install submersible pump to drain water in time. Check the sandbags and drainage pumps in the pump room of the water meter verification station to ensure that nothing is lost before the flood season.

(4) Each department should arrange special personnel to check whether the doors and windows are locked and whether the power supply is cut off before coming off work. Prevent fire and water from invading.

5] All departments should arrange electricians to check the lightning protection measures in the responsible area according to the situation to ensure that the lightning protection facilities and leakage protection are in good condition.

3. Emergency measures:

In case of flood, report to the company office immediately, cut off the power supply and switch the switch according to the situation, prepare emergency lighting facilities, organize personnel to drain water in time, evacuate personnel, and set warning signs to prevent leakage and personal injury accidents caused by accumulated water.

4, personnel education:

Each department can train employees on flood control knowledge according to the actual situation, and make clear the preventive measures for key parts and the measures to be taken in case of emergency.

Second, the construction site flood control requirements

1, power demand in flood season:

(1) In case of rain, the packaging materials on the construction surface must be tightly covered with rain-proof materials, and the wood should be laid flat to prevent the materials from soaking, corrosion, shrinkage and deformation and water ingress;

(2) It is strictly prohibited to pile up flammable items near various power and lighting lines. Indoor lighting and on-site mobile lighting have reliable moisture-proof measures, and distribution boxes and switch boxes have rain-proof measures. Non-electricians are not allowed to use electrical equipment and change wires without permission.

(3) All kinds of electrical equipment used in the open air should be placed in a dry and high place. The power switch box should be rain-proof. The welding machine should be placed in a waterproof, moisture-proof, sun-proof and well-ventilated shed. The shell of electric welding machine must be well grounded and have a separate switch. Wear insulating gloves when opening and closing, and operate sideways.

2, the flood season construction requirements:

(1) Yard ground of the construction site (such as steel yard, timber yard, steel pipe yard, etc.). ) is higher than the site ground, and drainage treatment should be done.

⑵ During the rainy season, the stability of foundation pit slope must be checked frequently. In case of cracks in the slope or the possibility of collapse, it should be reinforced in time. After the hidden dangers are eliminated, the construction can continue.

(3) On the construction operation surface, according to the position of the sump in the project, assign special personnel to dig and irrigate the rainwater, and drain the water in the sump to the site drainage pit with a pump.

(4) Anti-skid treatment should be done for construction scaffolding and pedestrian passage, and check whether the laid scaffolding is solid and reliable, and add anti-skid strips.

5] Full-time electricians often regularly check the flexibility, reliability and safety of the leakage protection devices in each distribution box, and make timely rectification when problems are found to ensure the normal operation of the distribution box during construction.

3, the construction site wind requirements:

(1) Operators should avoid working in windy weather when checking, repairing and maintaining high-altitude operations. When necessary, they should set safety ropes and take protective measures.

⑵ After aerial work, all parts, tools and wastes should be cleaned up to avoid injuries caused by strong winds.

(3) Security personnel should strengthen patrol in windy weather, and check whether the doors and windows of houses in the area are closed and whether there are signs and banners. There is a danger of being blown down. If hidden dangers are found, they should be reported and rectified in time.

(4) Scaffolding operation shall not be carried out when the wind exceeds level 6.

5] Before the gale comes, it is necessary to arrange workers to evacuate to a safe area in time, and pay attention to personal safety. [6] Before the arrival of strong wind, inspect, lick and temporarily reinforce the area and main equipment under its jurisdiction, such as towering independent machinery, scaffolding, formwork, temporary facilities and enclosures. Small machines and scattered materials piled on floors and roofs should be piled up and reinforced, things that cannot be fixed should be moved to the building in time, and aerial workers should be evacuated to safety in time. After the gale, the formwork, steel bars, especially scaffolding and power lines should be carefully inspected immediately, and the problems should be handled in time, and the work can be resumed only with the consent of the person in charge at the scene.

Once to strengthen the safety management of temporary facilities. It is necessary to conduct a comprehensive safety inspection of temporary facilities such as dormitories, offices, warehouses and fences on the construction site. If there are hidden dangers, measures must be taken and reinforcement must be strengthened. If personal safety cannot be guaranteed, people should be evacuated and dismantled in time to prevent collapse accidents.

4, the construction site lightning protection requirements:

(1) In case of thunderstorm weather, especially after hearing thunder, the safety management personnel should go deep into the site for inspection, immediately correct the problems found, remind the operators to pay attention to lightning protection, stop the operations that may be dangerous if necessary, and evacuate the construction personnel to a safe area.

⑵ It is not advisable to use mobile phones, walkie-talkies and other communication tools in open areas in thunderstorm weather. Don't make or answer landline calls, try to use hands-free phones.

(3) In thunderstorm weather, indoor personnel should not use faucets, stay away from water pipes, heating pipes and other metal pipes and distribution boxes, and close doors and windows.

(4) During construction in thunderstorm weather, do not shelter from the rain near power supply, trees and poles. 5] It is forbidden for construction personnel to carry out scaffold construction in thunderstorm weather.

[6] After the thunderstorm, conduct safety inspection and do a good job in daily maintenance of facilities. After the thunderstorm, check whether the overvoltage protector on the power supply and signal line of computer and other electrical equipment is damaged, and replace it in time if it is found to be damaged.

Once a lightning disaster occurs, it should be reported to the relevant departments in time so as to deal with it in time and avoid being struck by lightning again.

5. Inspection requirements on duty during flood season:

(1) Strengthen the safety duty system during rain, and give safety education to the field operators before rain, so as to overcome the paralysis. Report the danger in time and organize emergency rescue work.

⑵ Strengthen the on-site safety construction inspection in the rain period. During the rain, the site safety officer is responsible for checking and implementing the site safety protection facilities and mechanical rainproof measures, that is, the implementation of lightning protection and grounding facilities, and making inspection records, reporting and solving problems in time when found.

(3) After the storm, organize relevant personnel to inspect and maintain the engineering scaffolding. , in a timely manner to eliminate the security risks found. Continue to ask the construction team to strengthen the implementation of the pre-shift speech system for construction personnel, clearly emphasize the safety precautions for construction in the rain period, and improve the self-safety awareness of construction personnel.

(4) Strengthen the inspection on the implementation of rain-proof, lightning-proof and drainage measures in the field. Seriously communicate and implement the preventive measures and disclosure requirements formulated on site to ensure that management tracking is in place.

Third, emergency response.

1, all departments should classify emergency response according to meteorological information released by the meteorological center and factors such as its nature, severity, controllability and influence scope.

2. In principle, emergency response is required to be divided into four levels: IV (blue), III (yellow), II (orange) and I (red) to deal with general, large, major and extraordinarily serious natural disasters.

3. When there is a Class IV (blue) warning, all departments should arrange personnel to inspect the factory building, prepare emergency materials, clean drainage pipes, ditches and construction sites, and check the electricity consumption. According to the division of labor, the head of the department decides to start the emergency response according to the situation.

4. In case of Class III (yellow) warning, all departments shall arrange personnel to be on duty for 24 hours while implementing Class IV (blue) warning requirements, and report the danger as soon as possible, and the department head shall decide to start the emergency response according to the situation.

5. In case of class II (orange) and class I (red) early warning, all departments shall arrange all emergency team members to be in place and report to the company to start emergency response while implementing class IV (blue) and class III (yellow) early warning requirements.

Fourth, the responsibility requirements

1, all departments must put this work on the work schedule of safety production, set up a special group and give unified command.

2. Each department shall formulate a perfect emergency plan, set up a leading group, and report it to the company's safety supervision office for the record.

3, emergency plan content must be clear about the list of team members, materials and equipment list, team members' responsibilities, team members' contact telephone numbers, etc. ;

4, all kinds of flood control, wind, lightning protection materials are strictly prohibited.

5. The person in charge of each department must be the first person in charge of the group, and be fully responsible for flood control, wind prevention and lightning protection. If the emergency rescue and disaster relief work is not handled and controlled in time, resulting in potential safety hazards and accidents, the accountability system for the responsible person shall be implemented.

6. During the flood season, members of emergency teams of all departments must be turned on 24 hours a day to ensure smooth communication, to ensure that any abnormal situation at the scene is eliminated and controlled in time, to report the problems in flood control work in time, and to severely deal with those who fail to perform their duties in violation of regulations after investigation.

7. For matters not covered in the notice, please refer to the relevant safety management system of the company.

All departments are requested to earnestly implement the above notice, immediately carry out hidden dangers investigation and rectification, and report the rectification situation and relevant emergency plans to the Safety Supervision Office in writing before X 16:00.

Safety and quality supervision room

20xx year x month x day

Article 2: Notice on Flood Control in 2022: Fanwen Town Street Agricultural Comprehensive Service Center:

In order to do a good job in flood control and disaster relief, according to the deployment requirements of the provincial and municipal flood control and drought relief headquarters on flood control and typhoon prevention, the Municipal Bureau of Agriculture and Rural Affairs decided to organize a major inspection of flood control and typhoon prevention. The relevant matters are hereby notified as follows:

First, check the time.

X month x day -x month x day.

Second, check the content.

Flood prevention and typhoon hazard investigation of key facilities such as high-efficiency cash crops, vegetable greenhouses and agricultural demonstration parks (bases); Maintain and strengthen vegetable greenhouses and dredge drainage channels; Preparation of disaster relief materials such as seeds, fertilizers and diesel oil, as well as flood control and disaster relief materials and equipment such as drainage machinery.

Third, the inspection method

According to the actual situation, combined with the weak links and problems existing in flood control and typhoon prevention work in previous years, all towns and streets are required to carry out flood control and typhoon prevention inspection in a solid manner by means of on-the-spot inspection and spot check.

Fourth, the job requirements

1. All towns and streets should attach great importance to the inspection of flood control and typhoon prevention, fully implement the responsibility of flood control and typhoon prevention, further clarify the inspection contents, carefully organize the implementation, adhere to the problem orientation, and do a good job in source prevention. The Municipal Bureau of Agriculture and Rural Affairs will send an inspection team in the near future to conduct a comprehensive inspection of towns and streets to ensure flood control safety.

2. All towns and streets should earnestly strengthen organization, coordination, supervision and guidance, and carry out flood prevention and typhoon prevention inspections from morning till night in accordance with relevant procedures and prescribed time limits. It is necessary to identify the shortcomings and outstanding problems in flood control and typhoon prevention, urge the establishment of rectification work accounts, clarify rectification responsibilities and measures, and do a good job of looking back.

3. After the inspection of flood control and typhoon prevention, towns and streets should summarize the organization and development of flood control and typhoon prevention inspection in a timely manner, form written materials, fill in the Summary Table of Agricultural Flood Control and Typhoon Prevention Inspection and Rectification, and report it to the Planting Section of the Agricultural and Rural Bureau of the City X months ago.

Municipal Agriculture and Rural Bureau

20xx year x month x day

Article 3 of the flood control model in 2022 informs all construction project departments:

According to the latest weather forecast released by xx Meteorological Bureau, our city will have heavy rain and heavy rain, which is likely to cause natural disasters. Please inform us of typhoon prevention and flood control. In order to ensure the absolute safety of personnel and property of our project management department, ensure the safety and smooth progress of the project, make the project pass the flood season smoothly, and minimize the impact of the rainy season on the construction. According to the requirements of superiors, the project manager department is required to make specific arrangements for flood control and fighting in rainy season:

First of all, the project department is required to set up a leading group for flood control, which is responsible for organizing the overall work of flood control.

The office of the leading group for flood control and flood fighting command is located in the security department of the project department. The security officer of the security department is responsible for collecting the daily weather forecast information and informing the members of the flood control team of the weather forecast. When the higher authorities release flood warning information, they shall coordinate the relevant departments and units to do a good job in flood warning and response, and implement the relevant flood control emergency measures of the higher authorities.

The second is to highlight key points and intensify efforts to eliminate dangerous situations.

It is required that all construction project departments must attach great importance to it, strictly strengthen the prevention work, quickly check the disaster-prone points one by one, find out the situation on the construction site, and focus on the work of eliminating risks. To grasp the key points:

1, the parking position of large mechanical equipment should be reinforced;

2, the site drainage system dredge;

3, site materials, temporary electricity should be covered.

Three, strengthen the responsibility, adhere to the duty inspection system.

The flood control leading group of each project department should strictly implement the day and night duty system, and adhere to the 24-hour on-site inspection duty system in rainy season and flood season. Team members shall stick to their posts, and shall not leave their posts without authorization. They shall be vigilant at any time, observe carefully, especially pay close attention to dangerous areas, and immediately report possible dangers to the project manager department. In view of extreme weather changes, do a good job of "before rain, during rain and after rain" inspection. In case of danger, start the emergency plan quickly, organize emergency rescue immediately, prevent the accident from expanding, minimize losses, and ensure the personal safety and property safety of personnel.

Fourth, add flood control facilities and prepare emergency materials for flood control.

On the premise of ensuring the smooth progress of flood control, each project department should give priority to prevention, prepare sufficient flood control materials and equipment, ensure the timely supply of flood control materials, and educate all personnel on flood control and flood control safety to make them realize the importance and harm of flood control and flood control.

It is hoped that all construction project departments will take action immediately after receiving this notice, do a good job in flood control and flood fighting and do a good job in implementation.

I hereby inform you.

Chapter IV Flood Control Notice in 2022: Bureau of Fishery of Cities, Counties (Districts):

According to the forecast and analysis of the Meteorological Bureau, the overall deviation of China's climate situation in the flood season (May-September) this year, the precipitation in the middle and lower reaches of xx is more than normal, and extreme weather and climate events such as strong winds, thunderstorms and heavy rains are frequent, which may cause serious floods. In order to do a good job in flood control and disaster relief of fisheries in our province in 20xx, ensure safe production of fisheries and minimize disaster losses, relevant matters are hereby notified as follows.

First, attach great importance to and strictly implement the responsibility of fishery flood control and disaster relief.

First, deeply understand the importance of flood control and disaster relief, resolutely overcome paralysis and luck, actively seek the support of local party committees and governments in accordance with the decision-making arrangements of the CPC Central Committee and the State Council and the relevant requirements of the Ministry and province, and make every effort to do a good job in flood control and disaster relief and fishery safety production. Second, strengthen organizational leadership and enhance the sense of responsibility. The main leaders should personally promote the development of all work, make arrangements in advance, strictly implement their responsibilities, conduct pressure at all levels, and put the responsibility for flood control and disaster relief into one post. Third, pay close attention to the implementation of the fishery water safety responsibility system, further implement the main responsibility of the fishing boat owner, the direct responsibility of the captain and the post responsibility of the crew, and realize the full coverage of the fishery safety production responsibility.

Second, conduct a comprehensive investigation and actively implement flood control and disaster relief measures.

First, according to the principle of "prevention first, combining prevention with rescue", sum up past experiences and lessons, and improve emergency plans and systems for flood control and disaster relief. The second is to organize the investigation of hidden dangers of production facilities before the flood season, focusing on the investigation of facilities such as ponds, water intake and drainage channels, timely maintenance and reinforcement when problems are found, improve construction standards, and prevent floods and dam collapse; Promote the construction of fishery disaster preparedness seedling farm. Third, in combination with law enforcement activities such as the management of closed fishing seasons and cracking down on illegal activities, we will organize a major inspection of production safety, focusing on the preparation of disaster prevention and relief materials, the provision of emergency rescue equipment for fishing boats, the maintenance of fishery safety equipment and facilities, and the preparation of fishing vessels for navigation. Fourth, strengthen the regulation, maintenance and construction of fishing ports (fishing docks) to ensure the safety of fishing boats (fishery vessels). Organize various forms of fishery water safety publicity, education and training and emergency drills to improve fishermen's awareness of disaster prevention and self-help ability.

Three, strengthen emergency duty, do a good job in fishery emergencies.

First, strictly implement the 24-hour fishery emergency duty system, and urge enterprises, shipowners and aquaculture personnel to do emergency duty. The second is to strengthen coordination and cooperation with meteorological, maritime and water conservancy departments, do a good job in monitoring and early warning of disastrous weather, and jointly do a good job in emergency rescue and after-treatment work. Third, local fishery vessels should make good preparations for sailing, and immediately start emergency response and organize rescue in case of danger. The fourth is to do a good job in disaster statistics and submit it to the provincial bureau office in a timely and accurate manner in accordance with relevant requirements.

Xx office

20xx year x month x day

The fifth chapter 2022 flood control model notice to the property service enterprises:

The flood season of 20xx is coming. In order to do a good job in flood control in residential quarters, ensure the normal operation of public facilities and equipment in residential quarters, and ensure the safety of life and property of residents in residential quarters, we hereby notify the relevant work of flood control in residential quarters in our county as follows:

First, strengthen the propaganda work of flood control

All property companies should widely publicize flood control knowledge and preventive measures in flood season through publicity columns, electronic display screens, hanging slogans, etc., especially the investigation and publicity of hidden dangers of pots and sundries on the owner's balcony. Early warning and forecasting should be notified to the owner in time through various forms to help the owner strengthen the implementation of self-prevention measures.

Two, organize the pre-flood self-inspection and maintenance work.

Property enterprises conduct comprehensive inspection and maintenance of roads, main drainage pipes, manholes, septic tanks and other facilities and equipment within the property management area, improve the inspection records and assessment management system, and ensure smooth roads and smooth sewage discharge during flood season.

Third, do a good job in safety emergency plan

All property enterprises should prepare flood control equipment, keep it by special personnel, implement the project manager responsibility system, enhance the project manager's sense of responsibility and safety awareness, set up a leading group for flood control emergency plan, and be responsible for handling emergencies during flood control in residential areas, focusing on an emergency handling drill for storm water entering underground garages and sudden floods in residential areas, and formulating emergency plans and measures.

During the flood season, all property companies should adhere to the 24-hour duty system and report the disaster in time.

Chapter VI Notice to all companies, departments and offices of flood control model in 2022:

The flood season of 20xx has arrived. In order to ensure the safety of mining enterprises and ground enterprises of xx Group, the leaders of the Group made the following arrangements for the safe flood season of 20xx:

The first is to set up a leading group for flood control and fighting.

The person in charge of each unit is the first responsible person, so we must attach great importance to flood control and set up a flood control and rescue commando. There should be a sound organization, clear responsibilities and tasks, and orderly command. The telephone number of personnel on duty in key positions should be kept open for 24 hours, pay attention to the weather forecast, report problems in time and handle them properly, especially in the case of abnormal weather such as strong wind, heavy rain and high temperature, and do a good job in disaster prevention and relief to ensure the safety of the Group in flood season.

Second, formulate emergency plans for flood control and fighting.

All units shall, according to the experience of flood control and flood fighting in previous years and combined with the actual production situation this year, formulate the 20xx emergency plan for flood control and flood fighting, and make careful arrangements for all the work in flood season, so as to plan, arrange and prepare early to ensure foolproof.

Third, implement flood control materials.

All units should prepare enough wires, woven bags, shovels, purses, raincoats, rain boots, flashlights and other materials.

Xx group

20xx year x month x day