Joke Collection Website - News headlines - Finished product rework process steps

Finished product rework process steps

What is the process and steps of finished product rework? What are the conditions for rework of finished products? I sorted out the rework process of finished products for you, I hope you like it!

Finished product rework process 1, purpose

This specification is formulated in order to effectively control the rework/repair operation of nonconforming products, make the rework/repair operation more smooth and control the quality of reworked/repaired products.

2. Scope of application

This instruction is applicable to the rework/repair of WIP, semi-finished products and finished products that do not meet the quality requirements of the production department, as well as the treatment of repaired products by customers.

3, infield rules and regulations

3. 1 WIP rework in the field

3. 1. 1 QC found that the products in process did not meet the quality requirements. First, the unqualified products are isolated and submitted to the production supervisor for confirmation, and the supervisor arranges relevant personnel to rework and repair according to the relevant process requirements.

3. 1.2 QC should check the rework and repair process, and conduct a comprehensive inspection of the reworked and repaired finished products to determine whether the reworked and repaired WIP meets the quality requirements.

3. 1.3 The production supervisor should count the rework time of WIP.

3.2 Finished product rework and repair

3.2. 1 QC found that the finished product did not meet the quality requirements during the finished product inspection. First, the unqualified products are isolated, and then the unqualified notice is issued. After the notice is submitted to the production supervisor for confirmation, the supervisor arranges relevant personnel to rework and repair according to the relevant process requirements.

3.2.2 After the finished product is reworked and repaired, the production department shall resubmit it to the quality department.

3.2.3 After the quality department passes the inspection, the production department shall submit it to the warehouse.

3.3 Rework of warehousing semi-finished products

3.3. 1 If the semi-finished products that have been put into storage need to be changed again due to design defects, the design department will issue a change order, the production department will take the semi-finished products out of the warehouse according to the requirements of the change order, and the production supervisor will arrange relevant personnel to rework them according to the relevant process requirements.

3.3.2 After the rework of semi-finished products is completed, the production department shall resubmit it to the quality department for inspection.

3.3.3 After the quality department passes the inspection, the production department will resubmit it to the warehouse.

Conditions for product rework: 1. Spare parts in the workshop shall be inspected by the quality control room. Sampling management program? Sampling inspection, its main quality indicators (microbial limit,

Active substance content) meets the requirements of product quality standards and is approved by the manager of quality department after risk assessment. Wholesale and retail head products

Can be recycled for rework. The recycled products are valid according to the production date of the earliest batch of odd-numbered products in the recycling.

Period. Inspection records are included in batch documents, and release documents are attached to production records.

2. If the return is recycled, the recycled products must meet the product quality standards. After the risk assessment is approved by the quality department manager, the batch of recycled products can be reworked and meet the requirements of the previous article.

3. Preparation products shall not be processed again. Unqualified intermediate products, products to be packaged and finished products are generally not allowed to be reworked. Only when the product quality is not affected, and the corresponding quality standards are met and the above two provisions are met, can rework be carried out and the rework situation be recorded.

4. The quality management department should consider whether to carry out additional inspection and stability inspection on the reworked or reprocessed or recycled finished products.

Procedure:

According to the release approval issued by the quality department, the production manager issues the products that need to be reworked? Rework notice? , including: rework time, operation method, rework product name, batch number and quantity, etc.

1. After receiving the rework instruction, the workshop will arrange the operators to clear the site and the site monitor will sign it? Transfer certificate? , release? Production license? .

2. The operator goes to the intermediate station to collect the products to be reworked, and both parties sign the corresponding handover record, one of which is stored in the intermediate station and the other is attached to the back of the processing record.

3. Rework according to the corresponding process of the process specification of the processed product.

4. Under the supervision of the on-site supervisor, if there is any deviation in the operation process, it shall be handled in accordance with the Management Regulations on Deviation Handling in Production Process.

5. Fill in the rework record timely and truly according to the production record management regulations.