Summary refers to the summary that social groups, business units and individuals carry out after a certain period, a certain project or certain work has come to an end or has been completed. A kind of written material that reviews, inspects, analyzes and evaluates to affirm achievements, gain experience, find out gaps, draw lessons and some regular understandings. It plays a linking role in our study and work, so we It’s time to go back and summarize and write a summary. So do you really know how to write a summary? The following is a summary of the emergency plan drill work that I carefully compiled. Welcome to read and collect it.

Summary of emergency plan drills 1

According to the "Law of the People's Republic of China on Earthquake Prevention and Disaster Mitigation" and the State Council's "Opinions on Further Strengthening Earthquake Prevention and Disaster Mitigation" (issued by the State Council [Office of the State Council] 20xx] No. 18), the provincial, municipal and county governments’ “Implementation Opinions on Further Strengthening Earthquake Prevention and Disaster Reduction” and the municipal government office’s “Notice on the Construction of Earthquake Emergency Plans in Public Places” (Debanhan [20xx] No. 198 ), our county has comprehensively carried out the preparation of earthquake emergency plans and earthquake emergency drills for public places. The pilot situation of this work is summarized as follows:

1. Attach great importance

Public places are crowded places and are an important part of social emergency management. Whether it has an emergency plan, whether it is realistic and operable is directly related to the efficiency of emergency work, the safety of the people, the destruction of the natural environment, the happiness of families and the harmony and stability of society. To this end, our county attaches great importance to the preparation of earthquake emergency plans and earthquake emergency drills for public places and units, and regards the preparation of earthquake emergency plans and earthquake emergency drills for public places in the county as one of the priorities of this year's earthquake prevention and disaster reduction work; Strengthen leadership, meticulous organization, close cooperation, clarify goals and tasks, implement various responsibilities, and lay a solid foundation for the preparation of earthquake emergency plans and earthquake emergency drills for public places.

2. Carefully organize

(1) Do a good job in mobilization training. In order to fully promote the preparation of earthquake emergency plans and earthquake emergency drills for public places, the county government office specially issued the "Notice on the Construction of Earthquake Emergency Plans for Public Places" (Luo Banhan [2011] 3 Number). The guiding ideology and goal requirements were clarified, and the overall tasks and phased tasks of the plan construction were detailed. On the afternoon of January 12, Xie Qingyun, deputy director of the County Government Office, presided over a mobilization meeting for the construction of earthquake emergency plans for public places in the county in the conference room on the second floor of the county government. The construction work of the plan has been comprehensively arranged and deployed. Li Shimo, director of the Bureau of Earthquake Prevention and Disaster Reduction, trained the participants at the meeting on how to prepare earthquake emergency plans for public places, especially providing systematic guidance to the county bus station and Sansan Supermarket, which are responsible for the pilot tasks.

(2) Carry out pilot demonstrations. In order to actively and steadily promote the construction of earthquake emergency plans for public places, constantly explore new measures, and gain new experience, during the pilot work, our deputy directors Ouyang Li and Huang Xingming led the agency staff to the counties undertaking the pilot tasks many times. Two units, the bus station and Sansan Supermarket, learned about the progress of the earthquake emergency plan construction, communicated on the problems encountered during the construction of the plan, and provided specific guidance to the comrades in charge of the construction of the plan in these two units. With the joint efforts of all cadres and employees of our bureau, relevant departments and pilot units, the "Luojiang County Bus Station Earthquake Emergency Plan" and the "Deyang Sansan Trading Co., Ltd. Luojiang Branch Earthquake Emergency Plan" were fully completed in mid-April. 》Preparation work and report it to the competent department and our bureau for filing. The completion of the earthquake emergency plan of the pilot unit has provided Luojiang with experience and reference for the next step of comprehensively promoting the preparation of earthquake emergency plans for public institutions. At the same time, it has also better publicized the knowledge of earthquake prevention and disaster reduction and improved their awareness of earthquake prevention and disaster reduction.

(3) Strengthen emergency drills.

After the preparation of the "Earthquake Emergency Plan" was completed, both pilot units formulated an "Implementation Plan for Earthquake Emergency Drills" to test the practicality of the preparation of the "Earthquake Emergency Plan" and the specific implementation plan for conducting earthquake emergency drills as pilot units. Under the careful guidance of our bureau and relevant county-level departments, earthquake evacuation emergency drills were held at the county bus station and Luojiang Bajingyuan Plaza Store of Deyang Sansan Trading Co., Ltd. on April 26 and June 13 respectively. Before the drill, each unit established a leading group and held a mobilization meeting to explain the importance of the earthquake emergency drill, clarify the drill's procedures, content and disciplinary requirements, and implement emergency evacuation routes and earthquake-absorbing safety areas. During the drill, each team performed its duties, took responsibility, followed instructions and arrangements. Through the joint efforts of all employees, the earthquake evacuation emergency drill was successfully completed, achieving the expected purpose and achieving good results.

3. Comprehensive advancement

At present, our bureau is following the "Notice on the Construction of Earthquake Emergency Plans for Public Places" issued by the County Government Office (Luo Ban Letter) [20xx] No. 3) spirit, make every effort to promote the construction of earthquake emergency plans for public places throughout the county, and strive to fully complete this task by the end of the year. Emergency plan drill work summary 2

In accordance with the requirements of relevant laws and regulations, combined with the actual situation of our mine's safe production, on June 24, 20xx, the mine was carefully conducted in accordance with the drill steps of the flood emergency rescue drill work plan. Flood emergency rescue drill, the status of the mine flood emergency rescue drill is now reported as follows:

1. Emergency rescue drill time:

June 24, 20xx 10:00-11: 25 points

2. Location of the accident:

The south transport stone gate excavation working face of the main inclined shaft.

3. Flood emergency rescue agency leadership group

Team leader: Chen Fafa

Deputy team leader: Liu Hongxiang

Member: Chen Wentai , Yin Xuefu, Ma Wei

The leading group has an office, and the director of the office is Liu Yinghai.

4. Implementation status of disaster relief drills

1. A water leakage accident occurred at the south transport stone gate excavation working face of the main inclined shaft planned for this drill. During the drill, the underground personnel evacuated according to the disaster avoidance route. .

2. The mine director serves as the general commander of this disaster relief drill, the technical person in charge is responsible for overall coordination, and the office director assists in command and dispatch.

3. During the disaster relief drill, all personnel underground shall conduct the drill.

4. Drill process

At 10:00, at the excavation working face of the south transportation stone gate of the inclined shaft, Yang Shunwen, the follow-up leader, reported to the office that a water leakage accident occurred underground. After receiving the call, the leader on duty, Yin Xuefu, immediately informed the Shimen excavation personnel of Nanjing Transportation and the pedestrian uphill excavation personnel to evacuate according to the flood avoidance route, and quickly reported to the mine director.

At 10:01, the Nanjing Shimen excavation crew and the pedestrian uphill excavation crew began to evacuate according to the flood avoidance route.

At 10:02, Chen Fafa received the report and immediately notified the technical director and others. He also notified the part-time rescue team members to gather in the dispatch room immediately.

At 10:05, relevant leaders Chen Wentai, Liu Hongxiang, Liu Yinghai, Ma Wei, Yang Lin, etc. arrived at the dispatch room, established a disaster relief headquarters, and notified logistics personnel (mine protection team, supply department ). Commander-in-chief Chen Fafa immediately launched the emergency rescue plan for water penetration accidents and took overall command of the emergency rescue work.

At 10:08, Huang Zhengzhong, chief of the electromechanical section, cut off the underground power supply.

At 10:10, according to the emergency plan for water penetration accidents and the arrangements of the on-site emergency rescue headquarters, the part-time rescue team began to deploy rescue and rescue work.

At 10:11, the wellhead inspector verified the number of people underground and reported it to the emergency rescue headquarters.

At 10:12, the part-time rescue team arrived at the wellhead, put on protective equipment and prepared to go down to the well for rescue.

At 10:15, the security team completed the relevant alert to maintain the stability of the mining area.

At 10:20, the wellhead inspection workers counted the number of people in danger. The personnel in the south transportation Shimen excavation and the people in distress in the pedestrian uphill excavation working face had all been evacuated to the ground and reported to the headquarters.

At 11:25, the headquarters announced that the disaster relief drill was over.

5. Evacuation status of disaster relief drill personnel

1. The personnel evacuated neatly, orderly and quickly, had strong organizational discipline, and could evacuate correctly according to the flood avoidance routes.

2. There are problems such as insufficient preparation and unclear clothing labeling.

6. Evaluation of the effectiveness of disaster relief drills

1. Mine leaders were able to arrive at the office in time to direct disaster relief, and various departments and teams cooperated well during the drill. The rescue team members act quickly and can play a better role in disaster relief.

2. On-site personnel have strong disaster response potential, are familiar with disaster evacuation routes, and act in a unified manner.

7. Summary

Through this drill, all the cadres and employees of our mine have further improved their safety awareness. The theme of "scientific development, safe development" has been deeply rooted in the hearts of the people. And it has been well implemented and strengthened in work and life, which has greatly improved the safety awareness and emergency potential of the mine emergency leadership group and rescue personnel, and their proficiency in the use of rescue equipment, rescue methods, and emergency plan startup procedures. All have been further clarified, and the purpose of this exercise has been basically achieved. We should continue to strengthen employee training to improve employees' disaster response capabilities, and strengthen the training of rescue team members to improve emergency disaster relief capabilities. Strengthen logistics support work, strengthen political and ideological work, and improve political and ideological awareness. Summary of emergency plan drill work 3

In order to enhance employees’ safety awareness, effectively improve employees’ operational capabilities, rapid response capabilities and emergency response capabilities in using refuge chambers, and strengthen self-rescue and rescue in response to sudden mine disasters Skills, to test the reliability of the survival of personnel in the refuge chamber, our mine organized and carried out emergency escape drills for mine roof accidents at 9:009:36 on May 20xx. The drill progress is summarized as follows.

1. The purpose of the drill is clear, and the personnel organization is highly proactive

The overall drill planning and deployment can be based on the actual situation of mine safety work, with a clear purpose, and strive to make the drill consistent with actual conditions Unified; from the drill effect, it meets the safety production requirements. The unit of this drill was the Comprehensive Mining Team, with 13 participants. At the drill site, the on-site workers strictly obeyed the orders of the on-site command, were strict with themselves, lined up, actively participated, and carefully conducted every aspect of the drill, successfully completing it. exercise mission.

2. Exercise results

(1) Planned exercise time: June 6, 20xx, 9:009:40 Actual exercise time: June 6, 20xx, 9:009: 36;

(2) Drill location: East Wing Return Air Alley and Permanent Refuge Chamber

(3) Drill Project: Accident Prediction Machine Excavator Team East Wing Return Air Alley A roof fall accident occurred 70 meters away from the alley. No one was buried, normal ventilation was not available, and people could not pass. They needed to enter the permanent refuge cave to avoid disasters. Communication, monitoring, personnel positioning, electricity, lighting, and medical treatment in the refuge cave were required. and various life support systems for drills.

III. Drill process

(1) Issue orders

1. At 9:00, the dispatch command center notified the east wing of the return air lane distance through voice broadcast A roof fall accident occurred 70 meters ahead, requiring on-site personnel to enter a permanent evacuation chamber to avoid the disaster.

Dispatcher: Attention to all personnel on the excavation working face of the east wing return air alley. I am Li Jiangong, the mine dispatcher on duty. A roof collapse accident occurred 70 meters away from the east wing return air alley. Please stop production operations immediately, evacuate according to the fire evacuation route and enter the permanent evacuation chamber to avoid disasters.

2. The dispatcher reported to the commander-in-chief: Yang Kuang, I am Li Jiangong, the dispatcher on duty at the mine. The emergency escape drill for roof accidents has been started according to the plan. In anticipation of the accident, a team of machine excavators dug the east wing return air alley. A roof fall accident occurred 70 meters away from the head. There is no personnel buried under pressure, normal ventilation is not available, and personnel cannot pass. Participants at the excavation working surface of the east wing return air alley have been notified to evacuate according to the fire escape route and enter the permanent refuge chamber. Please instruct.

Yang Kuang: Agree to evacuate to the permanent refuge chamber to avoid disasters, and pay close attention to the following two tasks.

(1) Immediately launch the "Maohua Bailu Coal Mine Roof Accident Emergency Rescue Plan".

(2) When entering the refuge chamber, do not panic and follow the refuge chamber operating procedures.

(2) Evacuate into the evacuation chamber

1. Feng Jianhua, the morning shift captain of the first machine excavation team, led the 12 morning shift workers, security inspectors, and gas inspectors to wear self-rescue The vessel reaches the permanent refuge chamber.

9:12 Feng Jianhua reported: I am Feng Jianhua, the team leader of the first machine excavation team. I have led 12 morning shift workers, security inspectors, and gas inspectors to the permanent evacuation chamber wearing self-rescuers.

2. Arrive at the door of the permanent refuge chamber. Check through the observation window to see if there is anyone, and avoid opening the sealed doors of the transition room and survival chamber at the same time. After confirming that no one is around, the team leader Feng Jianhua turns the handle clockwise, opens the protective airtight door and enters the transition chamber. The pressure air curtain is linked with the protective airtight door to automatically open the pressure air curtain.

3. After entering the transition chamber at 9:16, immediately close the protective airtight door and open the manual control valve of the one-way exhaust valve.

4. At 9:17, open the compressed air spray device; open the compressed air curtain device, flush for about 30 seconds each time, and close the air valve after completion.

5. 9:18 After the air curtain flushing is completed, open the survival chamber door and enter the survival chamber.

Immediately close the survival chamber door.

6. 9:18 Open the pressure air self-rescue filter valve of the survival chamber and set its flow rate to 0.3 cubic meters/minute "people" (for example: a total of 13 people, then The flow meter air volume is set to 3.9 cubic meters per minute). Turn off the pressure air, assuming that there is no pressure air in the pressure air pipeline, open the oxygen flow meter (counterclockwise to open, clockwise to close), and set its flow rate to 0.5 liters per minute. (For example: a total of 13 people, then the oxygen flow meter flow rate is set to 6.5 liters per minute.

7. 9:21 Observe the value of the monitoring sensor in the cave. Assume that the carbon monoxide concentration is greater than 24ppm, take out Use the corresponding carbon monoxide adsorbent according to the packaging instructions. After the operation is completed correctly, remove the self-rescuer you are wearing. 8. 9:23 Personnel in the refuge chamber report the situation to the mine dispatching room via the dispatch phone. . The deputy captain of the first machine excavation team reported: I am Feng Jianhua, the follower of the first machine excavation team. I have led the morning shift of 12 people, gas inspectors, and security inspectors at the excavation work surface of the east wing return wind alley, and they have been evacuated to the permanent refuge cave.

Dispatcher: Carry out the next drill

9. The disaster relief personnel in the permanent evacuation chamber check the food and drinking water provided in the chamber. Be familiar with the operation of auxiliary equipment such as water, first aid kits, tool kits, fire extinguishers, isolation self-rescuers, emergency lighting miner's lamps and stretchers.

(3) End of the exercise

1. 9:36. , Feng Jianhua, captain of the first machine excavation team, reported.

I am Feng Jianhua, captain of the first machine excavation team. I have completed all the drills in the evacuation chamber according to the plan and restored the equipment in the chamber.

2. Dispatcher: Please evacuate the refuge chamber and restore doors, windows and other facilities.

3. Dispatcher: Report to Yang Mine that as of 14:36, all emergency evacuation drills have been completed. Subject drill, report completed, please give instructions.

4. Yang Kuang: I announce that the 20xx roof accident emergency escape drill of Maohua Bailu Coal Industry Co., Ltd. in Pinglu District, Shuozhou, Shanxi has been successfully concluded.

IV. Main features of the exercise

1. There were 15 employees participating in this exercise. It was well organized and the personnel were divided into details. They inspected the evacuation chambers in case of fire, gas and coal dust accidents. With the hands-on ability to start up and operate the equipment in the cave, the entire exercise was carried out according to the scheduled plan, in an orderly manner and achieved a complete success.

2. The activation of emergency procedures, operation of indoor equipment, information communication, personnel response, organizational cooperation, etc. can meet the needs of emergency rescue.

3. Through this exercise, the employees' ability to respond to emergencies and their operational capabilities after entering the refuge chamber were further improved, and the reliability of the survival of the personnel in the refuge chamber was tested.

5. Main problems existing in the exercise and corrective measures

Through this exercise, the employees' emergency response capabilities and the use and operation ability of the refuge chamber were improved, and some problems were also exposed. and deficiencies.

1. Some participating employees are not familiar with the drill procedures and their operations are not in place. The next step is to increase training efforts to ensure that all workers who go down the mine are proficient in the use of the refuge chamber.

2. This exercise was conducted under the premise that plans were formulated in advance and notifications were issued in advance. Therefore, there is still a certain gap between the exercise and actual combat.

3. During the exercise, the participating employees did not have enough tension and seriousness. The next step of the exercise must be strict and disciplined, maintain a tense atmosphere, and be more intensive and practical to ensure the actual practice of the exercise. sex and effectiveness.

In future work, we must strengthen emergency drill knowledge training and strengthen practical operation training in evacuation chambers, so that they can operate proficiently when the evacuation chambers are started; and the emergency evacuation system Facilities are inspected regularly to ensure that they are in good condition and can be used normally during emergencies. Summary 4 of emergency plan drills

In order to strengthen red line awareness, establish bottom-line thinking, achieve "safety first, prevention first", and nip problems in the bud. Our bureau carried out the "Safety Production Month" activities in depth and actively carried out the weekly drill activities of the emergency plan drill for the Safety Production Month. The activities are summarized as follows:

1. There are many drill projects and the participants are capable

During this drill week, *** carried out drills for 9 projects, including comprehensive drills and special drills. Involving fire protection, comprehensive non-coal mines, comprehensive hazardous chemicals, tailings pond special categories, gas pipeline leakage, fireworks and firecrackers, fall prevention from heights, metallurgy and nonferrous metals, emergency evacuation, etc. ***829 people participated in the drill (another 1,500 people watched the warning educational film - "Blind Hole·Lost"). The participants made active and careful preparations according to the company's emergency plan, and after many self-drills, during the drill week Centrally displayed. His proficiency and professionalism left a deep impression on the observers with his standardized operation and refreshing experience.

2. Drills in key industry areas are not omitted, and the effect of warning education is more prominent

According to the activity arrangement of "National Safety Production Month", our bureau has formulated a detailed activity plan, especially for The emergency plan drills that should be carried out in the key industries and fields involved in the industrial, mining and commercial enterprises in xxx County have been laid out. Different industries and fields are distinguished. According to the requirements of the enterprise's emergency plan, they are carefully compared and carefully organized, and relevant experts are invited to the scene. , carefully plan and standardize the operation. After each emergency drill is implemented, experts will comment on the spot, sum up experience, and point out deficiencies to facilitate improvement.

Through this emergency plan drill, the emergency operation skills of relevant enterprises in our county, especially those in key industries, have been improved. The results have been obvious, and the enterprises and employees have fully realized the importance and urgency of the drill. nature, thereby laying the foundation for "more drills in peacetime and less losses in wartime."

In the future, our bureau will organize and carry out similar drills more often, and make unremitting efforts to maintain the excellent situation of safe production in the county!

xxx County Work Safety Supervision and Administration Bureau

Summary of the emergency plan drill on July 16, 20xx 5

In order to vigorously publicize emergency rescue knowledge and skills, strengthen The government's ability to respond to public emergencies, enhance the rescue combat effectiveness of the rescue team, and improve the people's self-rescue and mutual rescue capabilities. In accordance with the requirements of the county emergency office at the beginning of the year to carry out emergency response plan drills, the county Economic and Information Committee carried out 5 emergency plan drills were held, with nearly a hundred people directly participating in the drills, and the activities achieved good results.

1. Main practices

(1) Leaders pay attention to and organize carefully

In 20xx, *** arranged 5 drills, and the county power supply company undertook 4 drills , the county market development service center undertakes it once. The Party Committee of the County Economic and Information Technology Commission attaches great importance to emergency plan drills and has contacted and communicated with the host department many times to formulate plans and drill scripts. The county power supply company has also given strong support and established a special agency to undertake the exercise. During the exercise, relevant leaders from the Municipal Economic and Information Technology Commission and the Municipal Electric Power Company were invited to observe and provide guidance at the exercise site. This greatly mobilized the enthusiasm for the emergency plan exercise and provided good conditions for the smooth development of the exercise.

(2) Each has its own characteristics and rich content

The emergency drill has also greatly improved the ability of multiple departments to cooperate closely and collaborate to handle accidents. For example, the county power supply company organized employees to conduct a fire extinguishing drill. The main content of the activity was the use of fire extinguishing equipment to put out fires. The drill began with the safety supervision department personnel explaining the use of fire extinguishers and precautions to on-site employees, and performed fire extinguishing exercises. Demonstration guidance. Through this drill, employees not only learned fire protection knowledge, but also received practical fire protection training, which greatly improved employees' fire safety awareness and fire safety quality. In addition, in response to major hazards and accident risks, subjects were set up close to reality and for front-line personnel, and emergency drills with various characteristics and forms were organized and carried out.

(3) Raising awareness has obvious effects

All relevant units and departments closely adhere to the theme of "scientific development and safe development" and follow the unified deployment of emergency plan drills to target Based on the characteristics of industry accident hazards, emergency drills are actively carried out close to reality and close to the production line, which greatly improves the self-rescue and mutual rescue capabilities of employees in responding to emergencies, and enhances the awareness of production safety accident prevention. At the same time, extensive and in-depth publicity reports were carried out on the drill activities, which increased the popularity of emergency rescue knowledge, expanded the coverage of emergency management work, pointed out the direction for future drills and emergency rescue, and achieved the goal of testing plans, running-in mechanisms, and training team, and the purpose of educating the public.

2. Problems

Although the emergency rescue drills have achieved good results, we have also discovered some problems: First, there are varying degrees of disconnect between the drills and the emergency plans. Second, the equipment level of some emergency rescue teams needs to be further improved.

3. Future work plans

First, we must further improve the emergency plan and enhance its operability. For problems discovered through drills, all relevant units should formulate corrective measures in a timely manner, make full use of the opportunity of this year's large-scale revision of the plan, further revise and improve the emergency plan, and truly implement various safety precautions. The second is to further increase investment in rescue equipment and improve the level of emergency rescue. Increase human, material and financial support for emergency management departments and emergency rescue teams, and continuously improve emergency rescue response capabilities, command levels and practical capabilities. The third is to further strengthen the publicity of emergency management and strengthen the emergency awareness of the whole people. It is necessary to give full play to the publicity role of the news media, guide all people to participate through active publicity, and continuously improve the public's safety awareness and self-rescue and mutual rescue capabilities.

Summary of emergency plan drill work 6

On February 20, 20xx, from 14:30 to 17:00 in the afternoon, a tunnel collapse emergency plan that lasted more than 2 hours was organized at the entrance of the Dongziliang Tunnel in our bid section. drill. The summary of the drill is now summarized as follows:

1. Record of the drill process:

At 14:30 on June 3, 20xx, it is assumed that a landslide occurs at the entrance face of the Dongziliang Tunnel. The personnel on duty in the cave quickly evacuated and guided the construction workers in the cave to evacuate the tunnel. After Deputy Manager Wang’s report, he ordered Kang Wei to count the number of people by roll call and report the danger to Manager Yuan through the mobile phone. Manager Yuan immediately reported to Manager Yuan. The superior leader reported the accident and led the relevant heads of the headquarters to rush to the scene within 10 minutes to organize the rescue.

Upon receiving the danger report, the project department immediately organized the rescue team, logistics support team, vigilance team, and technical solution team to enter the emergency state through loudspeakers, mobile phones and other contact methods. After observing the scene, the leader and members of the emergency rescue leading group formulate an emergency response plan and task division. In accordance with the requirements of formulating the rescue plan, the security team will guard crossings, cave entrances and construction sites, strictly prohibiting entry of persons unrelated to the project rescue; guide rescue and ambulance vehicles correctly and quickly; and be responsible for safety warning at the rescue site, serving the purpose of prompt reminders of situations. , to ensure the safety of rescue personnel. The logistics support team promptly notified the Yan'an Municipal Public Security Bureau and the hospital to prepare for rescue. The medical staff performed preliminary treatment on the presumed injured people in the cave, and sent the presumed injured to the hospital for rescue in a timely manner along with the ambulance vehicle. The rescue team and logistics support team performed their duties conscientiously. After the presumed injured were rescued from the cave, they evacuated the machinery and materials in the cave to a safe area, and moved the rescue materials (φ200 seamless steel pipe, φ42 steel pipe, φ22 steel bar, steel mesh, Steel arches, I16 I-beams, square logs, round logs, wooden boards, etc.), machinery (loaders, excavators, dump trucks, electric welders, oxy-acetylene welders, etc.) are transported into the cave in batches, and the safety is confirmed Under the situation, personnel were quickly organized to reinforce the collapsed body and reinforce it with spray concrete to prevent the spread of the accident.

2. Achievements in the drill

Under the premise of the current tense and urgent safety situation across the country, special tunnel construction safety management activities were carried out through special meetings, on-site inspections, and emergency measures drills Various forms of education such as this have played a role in preventing and reducing the harm caused by tunnel construction emergencies, and effectively improved the confidence and emergency awareness of construction front-line personnel in major accident rescue. By organizing workers at the tunnel exit to carry out "tunnel " The simulated drill of the emergency plan for tunnel collapse achieved the following goals; first, it tested the practicality, feasibility and reliability of the major emergency plan for tunnel collapse before the accident actually occurred; second, it tested the effectiveness of all personnel in the tunnel collapse emergency plan. After an emergency occurs, do you clarify your responsibilities and emergency action procedures? Third, improve the team's organizational coordination level and emergency response capabilities, and enhance workers' safety awareness. Fourth: Acquire practice in responding to emergencies through drills. experience.

3. There are shortcomings in the drill

1. The construction workers were not serious during the rescue process, were not aware enough, and joked with each other during the rescue;

 2. Medical personnel need to be strengthened in training;

 3. Information transmission to rescue personnel must be strengthened;

 4. The drill steps must be orderly. There was some chaos on site during the drill.

This drill took 2 and a half hours. The overall drill was relatively successful, with strong organization, proper command, accurate judgment, and effective measures. The timely and orderly actions of each team enabled the participants to fully realize the importance of emergency drills and laid the foundation for rescue in dangerous situations that may occur during tunnel construction.

Through this drill, the safety awareness of construction workers has been increased, people's ability to avoid accidents, prevent accidents, and resist accidents have been improved, and their vigilance against accidents has been improved; it has provided a basis for the rescue of similar accidents in the future. experience. ;