Summary of capital construction work

Summary refers to the written materials that social groups, enterprises, units and individuals review, check, analyze and evaluate after a certain period, a certain project or a certain work is completed, so as to affirm achievements, gain experience, find out gaps, learn lessons and have some regular understanding. Through it, we can correctly understand the advantages and disadvantages of previous study and work. Let's sum it up. How to focus on the summary? The following is a summary of three infrastructure work I have compiled. Welcome to reading. I hope you will like them.

Summary of Infrastructure Work 1 Summary of 20xx Annual Work of Infrastructure Department

Time flies, and before you know it, 20xx years passed quickly. Looking back on the past year, under the correct leadership of the central leadership, the staff of the capital construction department earnestly performed their departmental responsibilities, paid attention to project quality, improved work efficiency, worked hard, pioneered and innovated, and did a lot of work to ensure the effective completion of the central capital construction work objectives this year. The work of the past year is summarized as follows:

A, completed projects:

1. The renovation project of the pound house in the park was completed, which completely improved the working environment and work enthusiasm of employees.

2. The loess covering gangue project is completed, which avoids secondary environmental pollution.

3. The interior painting of the office building is completed.

Second, the completion of the project under construction:

1. main workshop: steel structure installation is completed, non-standard installation is completed, and equipment installation is completed by 90%.

2. Concentration workshop: reinforced concrete, wall masonry and thickener installation are completed.

3.2 10kv substation: the main body construction is completed, the cable trench on the first and second floors is completed, and the stair floor is completed.

4.3 10kv substation: main frame construction is completed, and indoor backfilling is completed.

5.4 10kv Substation: Foundation treatment is completed and foundation construction is completed.

6. Air compressor room: the main body is completed, the windows are installed and the air compressor is installed.

All right.

7. Media library: the main construction is completed.

8. After the project of raw coal bunker (belonging to the bid section of raw coal bunker and coal return tunnel) was officially started on March, 2005 15, the earthwork excavation depth was 28m, and the cumulative earthwork excavation and transportation was198,000 cubic meters; Upper soil nail bolting and shotcreting support; The lower part is a composite support of row piles and internal support. The tunnel has been completely poured 12000m3, with 75% of the north-south pipe and 90% of the middle pipe. The unit project has completed 60% of the total progress.

9, 3# gangue silo (belonging to silo bid section) started on April 28th and has been completed.

Earthwork excavation, lime-soil compaction pile, CFG pile, main body and funnel. The capping has been completed. 95% of the total cumulative progress.

10 ended, and the coal bunker (silo) project was started and completed on March 15.

Earthwork excavation, lime-soil compaction pile, CFG pile, raft foundation, funnel, two silos slip form. Complete 60% of the total progress of the unit project.

1 1. Coal washing bunker (belonging to silo bid section) completes earthwork excavation and lime-soil compaction.

Pile, CFG pile, gravel cushion, concrete cushion, raft foundation, funnel and main slip form. It is currently capping. Complete 85% of the total progress of the unit project.

12. Due to various reasons (small site, no working face),

Only 30% of the equipment procurement has been completed, and three civil points are being laid.

Third, strengthen the quality management of engineering construction to ensure the engineering quality.

In the on-site management of the construction process, according to the actual situation of tight construction period and heavy tasks, the quality management between supervision, construction and owners is established, and the system of "self-inspection and mutual inspection" is strictly implemented. If it is found that it does not meet the requirements during the on-site inspection, * * * will give the construction party five punishment decisions; It is strictly required that every working procedure of construction should be carried out in strict accordance with the specification requirements, and the construction of the next working procedure is never allowed without acceptance of each working procedure; Keep good communication with Party B and the supervisor, adhere to the system of weekly meeting, check and summarize last week's project progress and work arrangement this week, and find and solve problems in the construction process in time. Establish a monthly summary meeting system, and all construction units should summarize their respective project progress and various problems that need to be coordinated and solved by the center. After the completion of each sub-project, the construction unit shall report it to the supervision unit and the infrastructure department for acceptance after passing the self-inspection, so that each sub-project can always meet the design requirements and construction acceptance specifications and always maintain the best quality state.

Looking back on the past year, under the circumstances of many projects, heavy tasks, tight time and high requirements, we have done a lot of work in a planned and targeted manner, carried forward the spirit of hard struggle, self-improvement and hard struggle, laid a good foundation for completing the work tasks and completed the infrastructure tasks in a down-to-earth manner. Due to the weather and subjective reasons during construction, the construction unit has many problems, which are under the control of the construction unit.

Theoretically, we have tried many methods to solve many difficulties and made some achievements in our work, but there are still many problems. Lack of scientificity, impetuous work, lack of initiative and poor professional level are all areas that we must seriously improve in our future work. In the future work, we should learn from each other's strong points and try our best to do a good job.

In the new year, we will fully implement the 20xx goal, carry forward our achievements, overcome our shortcomings, keep pace with the times, obey the overall situation, learn with an open mind, constantly sum up experience, enhance our work initiative, ensure that all projects are completed on time with good quality and quantity, and successfully complete all tasks assigned by the central leadership.

Summary of Infrastructure Work 2 During my one-year post of 20xx Infrastructure Accounting, I was able to strictly abide by various financial systems, handle every accounting business according to law, complete all accounting work in time, accurately and skillfully, abide by labor discipline and other school rules and regulations, and actively cooperate with other departments. Summarize the work of accounting posts this year from two aspects:

Summary of daily financial work throughout the year:

The financial work this year is very heavy. I can finish the tasks on time, from the audit and filling of accounting vouchers to the pricing of material procurement and recipients, the monthly payment of project progress, the filling of various accounting statements, and the checking of current accounts with construction units and suppliers.

In addition, a large number of projects, materials, equipment and other bidding projects have been collected and returned. Make cost statistics for all completed projects, check with each other, and check the inventory material account with the warehouse keeper, so as to deal with the problems in time and ensure that there are no mistakes in the import and export of a large number of materials. All kinds of construction contracts, agreements, project budget tables and other materials have been carefully reviewed, numbered and filed, and all kinds of accounting books have been properly kept according to regulations.

Completion project settlement summary, etc.:

In the project settlement work, on the basis of ensuring the completion of daily work in the middle of the year, the progress of several projects in the new and old campus, such as high-rise A, high-rise B, high-rise C, high-rise D, gymnasium, teacher education center, maintenance team outdoor, etc., was repeatedly checked, and the materials receivable from Party A and the project payment payable were made. According to the audit report and project contract of each project, contact the construction team and suppliers in time, and settle the bill after repeated verification.

This year, we have also completed more than 30 special audits assigned by department leaders and relevant departments of the school, participated in more than 30 bidding, and recently cooperated with the completion of the declaration of state funding for 20xx.

In 20xx, I will continue to work hard to further improve my work.

Summary of Infrastructure Work Chapter III Summary of 20xx Annual Work of Infrastructure Department

Looking back on the infrastructure work in 20xx, I am deeply touched, both by the helplessness of objective conditions and the satisfaction of subjective efforts. Difficulties and helplessness test us and inspire us to move forward; We are pleased with our efforts and achievements. With the strong support and guidance of the mine leaders and the joint efforts of all the staff, our department, in line with the guiding ideology of building an intrinsically safe mine from a high starting point, earnestly implemented the responsibilities and objectives of the department, overcame difficulties, repaired the old and utilized the waste, and successfully completed all the tasks assigned by the mine leaders. The work situation and working ideas in 20xx are reported as follows:

I. Completion of the project

(a) 20xx infrastructure project completion:

(1): The comprehensive building of the ambulance station has been completed, reaching the use conditions;

(2): Cooperate with the coal preparation team to manage the raw coal storage shed project of the coal preparation plant, and complete the large-scale gangue silo, raw coal receiving pit, coal dropping tower, raw coal storage shed, tensioning device room and other projects;

(3): The Geshan Gangue Dam Project has been completed, and the Gangue Highway is now negotiating with Quli Village Committee for land acquisition and preliminary preparation, and earthwork construction can be carried out when conditions are ripe;

(4): The main garage project is completed, and the 25th door, window and heating are all installed 12 yuan, which can solve the problems of vehicle storage and anti-freezing.

(ii) Complete the 20xx annual cost maintenance project.

According to the instructions of mine leaders, combined with the use requirements of various departments and teams, as well as the way of investigation by the infrastructure department, special construction measures and maintenance plans were formulated for 23 projects that need maintenance, such as joint office building, auxiliary shaft wellhead room, secondary pumping station and fence. The 23 cost maintenance plans made in 20xx were successfully completed by the unified acceptance and signature of the user department and the mine-related department.

(iii) Complete special fund projects within 20xx years.

In strict accordance with the definition, arrangement principles, planning procedures, implementation steps and management requirements of the Management Measures for Special Fund Projects of Lanxian Lizheng Coal Industry Co., Ltd. of Shanxi Coking Coal Group, the Ministry of Capital Construction overcame difficulties, repaired the old and utilized the waste, rationally utilized the hot blast stove room and boiler room, and saved investment costs. * * * Completed the following six projects:

(1): single building maintenance (mainly including single building, guest house, office building, canteen, doorman and other maintenance works. ) completed as planned;

(2): Demolition of the hot blast stove and auxiliary machines is completed;

(3): The demolition project of 4t boiler and auxiliary machine is completed;

(4) The boiler maintenance project was completed at the end of September, which ensured the normal heating in winter in advance;

(5): The hot blast stove room was transformed into a laundry room, which ensured the normal living and working environment of employees;

(6): The environmental treatment project of Longfeng Mountain in Lan County has been completed.

Second, the site construction management:

1. The Ministry of Infrastructure strengthens and standardizes dispatching management, and actively organizes departmental dispatching meetings every morning. On-site management has achieved everyone's standardization, everywhere supervision and everything assessment, achieved full coverage of safety management and no loopholes, and achieved zero accidents in production safety in 20xx.

2. Organize relevant personnel to review the engineering drawings provided by the design institute in time, and put forward suggestions for revision and improvement.

3. Cooperate with the supervision unit to review the operation procedures and technical measures, and review the operation procedures regularly at the same time;

4. Regularly review the data arrangement of corresponding projects to ensure the synchronization of engineering data and site construction;

Third, shortcomings in the work.

Looking back on the work in the past year, although some achievements have been made, there are still some shortcomings, such as insufficient professional knowledge, insufficient meticulous and solid work, few creative ideas for carrying out work, and the management level needs to be further improved. In the future, we should strengthen theoretical study, especially the professional knowledge needed by infrastructure workers after construction, constantly improve their professional quality, make suggestions for the construction of our mine and ensure good quality. Study in practice, guide practice with study, expand ideas, establish advanced consciousness, constantly improve system construction, establish information collection of infrastructure projects, do a good job in the next file management, and do a good job in daily work and management.

Four. Working ideas for 20xx years

The main projects in 20xx are: plastering and decoration inside and outside the garage; Phase II project of low-temperature heat source heating system in office area (civil work); Comprehensive building; Staff training center; Reclaimed water transportation project; Alpine swimming pool; Gangue road; Industrial site greening hardening and other projects.

(A) the overall working ideas

Focus on "safety and quality", refine target responsibilities, pay close attention to on-site construction safety management, grasp quality standards, further improve departmental execution, comprehensively improve the safety and quality level of engineering construction, and at the same time grasp key links to ensure the smooth completion of tasks throughout the year.

(2) Main measures

1. Strengthen the implementation of responsibilities and ensure that orders are prohibited. Further improve the execution of the department and ensure the smooth development of all work.

2, pays special attention to the engineering quality, control the construction progress. In terms of engineering quality, combined with special rectification, it is strictly accepted according to the acceptance criteria; On the construction progress, according to the tasks assigned by the company, it is reasonably decomposed into months to ensure that all tasks are completed as planned.

3. Strengthen internal management to ensure safety. Break down the responsibility to the specific responsible person, so that all the work can be managed by someone and laid a solid foundation for safety.

4, rigorous technical work, abide by the management system. Carefully check the drawings, regulations, etc. , and timely reflect any problems or discrepancies to the design unit, so as to ensure the correct and reasonable construction.

4. Insist on business learning, improve professional level, improve knowledge structure, update knowledge content, summarize new working methods, learn from each other, and improve the overall work efficiency of our department.

The above work is a summary of the work of the Infrastructure Section. If there is anything wrong, please criticize and correct me. We will accept it with an open mind and constantly improve our management level.