Joke Collection Website - News headlines - Five professional and technical self-evaluations
Five professional and technical self-evaluations
Since you have chosen the front, you are destined to go through ups and downs. No matter whether the road ahead is a broad road or full of thorns, I will keep moving forward, keep working hard, keep defeating myself, and constantly surpass myself. Below are five professional and technical self-evaluations that I brought to you. I hope you like them!
Professional and technical self-evaluation 1
Since 20__ year 4 On March 1st, I came to work in the Agricultural University Project Department of the One-key Integrity Branch of the Corps Construction Engineering Co., Ltd. Over the past year, I have been working as a technician in the project department. After being trained by the practical work on the project site, I benefited from the care of the leaders of the project department. Thanks to the enthusiastic help and earnest guidance of my colleagues, my work has improved rapidly, and I have gradually grown into a qualified technician. I would like to express my gratitude to the company for its trust in me and the support of my colleagues. Through the joint efforts of the team, I have gained the necessary work experience. Here is a personal evaluation of one year's work. Please give guidance and correction to the leader:
1. Main Responsibilities
1. Responsible for the preparation of steel bar material plans and the quality and quantity acceptance of incoming steel bars.
2. Responsible for the setting out of steel bars, the briefing of steel bar work, and the inspection and acceptance of steel bar projects.
3. Responsible for weather scene records, construction measurement and setting out, steel bar project concealment time and concrete pouring records.
4. Responsible for the project measurement work of each sub-section of the final accounts.
5. Participate in the labor management of on-site steel bars, formwork, civil engineering, scaffolding workers and each team, as well as other work arranged by the leader.
2. Work experience
1. Being able to do work and doing it well are prerequisites for completing the work well, which requires us to have a solid professional foundation.
2. The success or failure of a project depends on teamwork. Doing a project requires the close cooperation of multiple departments. Only when the entire team overcomes all difficulties at hand and forms a joint force can it have strong combat effectiveness. Only in this way can we win one victory after another in the fierce market competition!
3. Be diligent at work, have a serious work attitude, communicate proactively, and avoid information lag.
4. In terms of technology and management, both hands must be grasped and both hands must be ruthless!
3. Shortcomings
1. Due to work experience Insufficiency, some aspects of project management cannot achieve prior control.
2. In terms of settlement of steel bar projects, Glodon is not proficient in using it and needs to continuously strengthen its learning.
3. I am not familiar with the preparation of construction plans and need to continuously strengthen the study of professional knowledge.
4. Easily act impulsively.
4. Future plans
1. Gradually master the preparation of construction plans.
2. Try to pass the exam for the second-level construction engineer in 20__, and then the first-level construction engineer.
3. Work more on project management and strengthen target control and management coordination skills.
Generally speaking, all the tasks assigned by the leaders have been completed relatively smoothly and well. Over the past year, I have been engaged in engineering construction work and have continued to improve. My professional knowledge has been improved and deepened, and my work skills, including organizational collaboration skills, management skills and adaptability skills have been greatly improved. More importantly, I have gained Accumulated valuable work experience. The work performance over the past year has also been recognized by the project department leaders and colleagues. Looking forward to 20__ there will be more new challenges in the work. I will do my best to work more aggressively. In the future work, I We will meet new challenges with a hundredfold enthusiasm, improve and mature in learning, and contribute our own strength to the development of the company!
Professional and technical self-evaluation 2
__ is coming Looking back on the past year, under the correct leadership of the hospital leaders, our department adhered to the important guiding ideology of "putting patients at the center and improving the quality of medical services."
Study hard and study business to improve your own quality and business.
In __, under the correct leadership of the Health Bureau, the township party committee, and the government, we closely focused on the goals and tasks assigned in 20__, actively responded to public health emergencies, and implemented the new rural cooperative medical system , striving to solve the problem of difficult and expensive medical treatment for the masses, and achieved obvious social and economic benefits with the joint efforts of all the cadres and workers of the hospital.
1. Pay close attention to actions, establish new trends, and comprehensively improve the overall image of our hospital
1. Putting patients at the center, improving service quality, and creating a hospital that satisfies the people is the development goal of our hospital , in order to improve service attitude, implement promised services, and effectively correct unhealthy trends in the industry. Our hospital extensively solicits opinions and suggestions from patients and all walks of life, sets up a reporting box, makes public reporting hotlines, makes publicity slogans, implements the "Five Ones" project, issues doctors' business cards, makes follow-up calls, issues solicitation cards and social questionnaires. In order to implement the opinions and suggestions, we strictly followed the investigation and punishment system, which greatly improved the conduct of our hospital and significantly improved the overall image.
2. Carry out health cleaning and actively participate in the six-city joint creation and provincial-level health township activities. Combined with the actual situation of our hospital, we quickly promoted the upsurge of politeness, hygiene, beautification, lighting, and greening of the health center, and implemented the "five guarantees in front of the door" responsibility system, requiring department staff to clean indoor and outdoor hygiene before going to work, and divide responsibility areas. Every Tuesday 5. Carry out general sanitation cleaning and conduct inspections and evaluations to ensure that indoor and outdoor hygiene is clean and tidy, items and equipment are neatly placed, and medical waste generated every day is incinerated in a timely manner for harmless treatment. In order to cooperate with the activities of establishing provincial health towns, we scraped the walls of the ward buildings and replaced the dilapidated doors, made fly-proof door curtains and window nets, trimmed the flowers, grass and trees in the flower beds of the health center, watered and fertilized them, and provided Provide patients with a warm and comfortable medical environment.
2. Further strengthen medical quality management and continuously improve technical levels
Through the training and study of a large number of professional and technical personnel in the past few years, and the purchase and update of medical equipment, the technical strength of our hospital has been strengthened , on this basis, we pay close attention to medical quality management, strictly write medical documents, require complete items in outpatient diaries, standardize prescription writing, use reasonable and safe medications, timely and standardized medical record writing, detailed nursing records, implement a department approval system, and conduct in-depth clinical investigations by the dean. The hospital proactively participated in the rescue of critical patients. The medical quality assessment team strictly followed the assessment plan and conducted supervision and inspections every half month. Problems found were dealt with in a timely manner. There were no medical errors or disputes throughout the year.
1. Encourage employees to further their studies and participate in business training. This year, two people were sent to their superiors for training, one employee studied off-the-job, more than ten people participated in promotion and qualification examinations, and five people obtained promotion titles, which brought the level of professional and technical personnel in our hospital to a new level.
2. Through the joint efforts of all the cadres and workers of the hospital, the business of our hospital has improved significantly. The number of outpatients has increased compared with last year, returning to the outpatient level in 20__, reaching 2187 patients and inpatients. 819 people, 28 cases of medical surgery, 32 cases of hospital delivery, an increase of 20 cases compared with last year, a cure rate of 80%, an improvement rate of 1%, a mortality rate of less than 0.1%, a rescue success rate of critically ill patients of 90%, and a pre- and post-operative fit rate of 9% , the sterile surgical infection rate is zero, and the total income reaches 220,000 yuan. The admission rate of internal medicine increased by 2 compared with last year, the number of operating tables increased compared with last year, the number of hospital deliveries increased compared with last year, and the total business income was more than 160,000 yuan, which increased by 3 compared with last year.
3. Effectively do a good job in the new rural cooperative medical care
1. The new rural cooperative medical care, a policy that benefits the people, has been popular among farmers since its implementation for two years. However, in 20__ Due to the doubling of the share of the self-raised portion of the rural cooperative cooperative financing work, we also face many difficulties. In order to dispel farmers' concerns about participating in the cooperative and do a good job in explaining the financing work, we printed more than a thousand copies of the "20__ Annual Report on the Policies for Participating Farmers" and distributed them to In the hands of township and village cadres and farmers, publicity vehicles were dispatched to various villages to widely publicize the new rural cooperative medical policy, and designated rural doctors were organized to actively cooperate with village cadres in fund-raising work. They also contacted migrant workers to participate. Our hospital dispatched personnel to the villages to supervise and actively serve as supervisors. With good government consultants, the participation rate this year reached 94.
After the financing was completed, the participation information was entered and integrated immediately, and a 20__ participation information file was established in a timely manner.
2. Actively carry out medical compensation for participating farmers. For farmers who come to our hospital for medical treatment and are discharged from the cooperative, the compensation will be cashed on the same day, and our hospital will advance the small outpatient subsidy reported by designated rural doctors in a timely manner. This year, the *** compensated 670 people of various types, with a compensation amount of 76. yuan, which has indeed reduced the burden on farmers. This year, 48 people were compensated for hospitalization, with a compensation of 30,000 yuan, 11 people were compensated with a fixed amount, an amount of more than 10,000 yuan, and 610 outpatients were compensated with small amounts. , amounting to more than 320,000 yuan.
3. Provide a supervision platform for the majority of farmers participating in the rural cooperative medical system. Hang the rural cooperative medical treatment procedures, compensation scope, compensation standards and necessary supply materials for compensation in a conspicuous position in the corridor of the outpatient hall. Compensation for rural cooperative medical care that occurs on that day will be reviewed every day. The information is carried out in the village formula, and the reporting hotline is announced to accept supervision from all walks of life.
4. Formulate measures, actively complete project work, and focus on responding to public health emergencies
1. In 20__, our hospital was designated as a prevention station construction and " In the acceptance year of the "Seven Have Two Information and One Warmth" project, we designated a hospital leader to personally take charge of it, carefully organized it, increased investment, replaced the old air conditioner in the operating room, added an infant radiation rescue table, and renovated the appearance of the ward building, which passed smoothly. These two assessments are inspected and accepted by superiors.
2. The village clinic construction project has high work requirements, short time and high difficulty. We attach great importance to this, formulate site selection plans in a timely manner, and speed up the progress of the project. Each of the project villages in our township has passed the first acceptance inspection, and will be completed in mid-January.
3. In response to today's hand, foot and mouth disease, we have carefully organized and widely publicized health science knowledge, established fever and specialist clinics, and set up two isolation wards, mobilized rural doctors, screened at all levels, and promptly Referral, and at the same time do a good job in epidemic investigation, reporting and monitoring. In response to the incident of problematic milk powder, our hospital assigned seven personnel to participate in the screening work. The two comrades worked at the same time, working in the morning and leaving get off work in the evening, without taking a break at noon, and screened nearly a thousand babies in our hometown who had consumed Sanlu milk powder.
Professional and technical self-evaluation 3
1. In-depth study of political theory and continuous improvement of political literacy
For more than a year, I have carefully studied the 17th National Congress of the Communist Party of China. spirit and the spirit of the two sessions, China Southern Power Grid strategy, the spirit of China Southern Power Grid and the company’s work meeting, the regulations on energy conservation and emission reduction of Yunnan Province and China Southern Power Grid Company and other documents and materials, Chairman Yuan Maozhen and General Manager Liao Zelong’s evaluation and commendation of the company’s disaster relief and power restoration Speech at the conference. Through study, I have a further understanding of the Scientific Outlook on Development, and enhanced my consciousness and initiative in learning the Scientific Outlook on Development; further improved my understanding of the Party’s advanced nature, and further grasped the essence and scientific connotation of the Party’s advanced nature; further Understand the basic standards, realistic standards and specific standards for the advanced nature of Communist Party members. After studying, I further understood the importance of the Southern Network Strategy. I deeply understand the spirit of "united will, tenacious struggle, and perseverance" to resist disasters, and understand the spirit of "there are always more solutions than difficulties, perseverance, and hard work." This will be a powerful motivation for my future work and a powerful weapon to overcome difficulties.
In addition, I also use the Internet, TV, newspapers and other media to understand and study political current affairs, pay attention to social and political life, and have greatly improved my consciousness and enthusiasm for political learning. .
2. Continuously study hard and improve professional knowledge
In terms of business knowledge, I participated in the marketing work innovation training organized by the Internet company and the marketing-related skills training organized by the company. In addition to participating in various trainings organized by the company, I also humbly consulted the professional and technical personnel of Tongfang Company and various power supply bureaus for marketing informatization and automation related knowledge, and combined with work needs, I independently learned professional knowledge of informatization and automation. In addition, I used weekend time to study for a master's degree in control theory and control engineering from the School of Information and Automation of Kunming University of Science and Technology. In more than a year, I have basically completed the course study for the master's degree in engineering, which has enabled me to gain theoretical knowledge. A big improvement. Pay attention to the evaluation of gains during the learning process, and publish an article in "Yunnan Electric Industry".
3. Do your job seriously and improve your work ability
In the past year or so, under the arrangement of the department leaders, I have mainly participated in the following tasks:
(1) Construction of Marketing Monitoring Center
The marketing monitoring center is based on the customer service system, 95598 system, negative control management system, demand side management system, dispatching mis, and marketing on-site monitoring equipment. Through the integration of other resources, a new marketing workflow monitoring and management system has been established to truly realize end-to-end management and comprehensively improve the level and level of marketing services. Starting from the construction at the beginning of the year, I participated in the preparation and improvement of the "Yunnan Power Grid Company Marketing Service Center System Construction Plan". During the construction process, I participated in the coordination of relevant participating units throughout the construction process, and was responsible for the daily management and maintenance of the software and hardware equipment of the monitoring center. After the system was put into trial operation, after soliciting opinions from various departments, the "Documents that need to be improved in the marketing service center system" were compiled, the monitoring center was organized for acceptance at the end of the year, and the "Yunnan Power Grid Company Monitoring Center Later Construction Ideas" and "Yunnan Power Grid Company Marketing Monitoring Center Operation The preparation of "Management System" and "Job Responsibilities of Yunnan Power Grid Company Marketing Monitoring Center", etc. So far, the Marketing Monitoring Center has completed a total of 73 function developments, including 63 business functions and 10 data reporting functions. Among the business functions, there are 23 power generation and power supply modules, 15 demand-side management items, 13 marketing operations, 10 quality services, and 2 others.
(2) "Integration" work of county-level companies
As the "three major marketing projects" of this year's "integration" construction of marketing information in the province, I participated in the "Integration" Customer Service System Promotion Implementation Plan and Business", "Yunnan Power Grid Company County-level Power Supply Enterprise Marketing Information "Integrated" Business Process Specification (Trial Implementation)", "Yunnan Power Grid Company County-level Power Supply Enterprise Marketing Information "Integrated" Electricity Bill Accounting Rules (Trial Implementation) )》Completely written. In view of the network problems exposed during the implementation of "integration", he participated in the preparation and improvement of the "Yunnan Power Grid Marketing Integrated Network System Construction Project Book" and participated in the organization and implementation. Participate in the "integrated" customer service system exchange meeting with on-site technicians, collect and sort out the opinions of each unit on the system and problems during use, and compile the "Integrated Customer Service System Frequently Asked Questions". At present, "integration" has completed the implementation of the three core modules of copying, verification and collection of 689 power supply stations in 66 county companies.
(3) Kunming Bureau Wuhua Branch piloted the construction of a 7_24-hour digital business hall
Participated in the preparation and improvement of the "7_24-hour digital business hall construction plan" and coordinated with the Kunming Bureau and Yundian Tongfang and other problems that arise during the construction process of relevant units. At present, the civil construction part of the 7_24-hour digital business hall has been completed, and the software development is more than half-way. It will be put into use soon. By then, users will be able to pay electricity bills in cash or other methods and handle inquiries, applications and other services through full self-service 24 hours a day, allowing Users can complete business transactions more quickly, saving time and flexibility, while also saving power supply costs.
(4) Construction of mobile marketing operating system
Participate in the preparation and improvement of "Yunnan Power Grid Company Marketing Mobile Operation Subsystem Plan" and "Yunnan Power Grid Company Marketing Mobile Operation Subsystem Technical Agreement" . Organizing and coordinating the Kunming Bureau and Yundian Tongfang based on the actual situation of Yunnan Power Grid, the inspection team of Kunming Power Supply Bureau took the lead in carrying out mobile pilot applications. Currently, it mainly realizes: comprehensive query, query of power supply notice, user profile information, review of rectification notice, filling in Common audit functions such as on-site processing sheets and problem notes.
(5) Participate in the preparation of various specifications
Participate in the preparation of the "Yunnan Power Grid Company Distribution Team Construction Specifications (***16th Volume)", "Yunnan Power Grid Company Marketing Safety Standards such as "Measures for the Prediction and Pre-control of Work Danger Points (Trial)", "Yunnan Power Grid Company Marketing Standard System for Municipal Power Supply Enterprises", "Yunnan Power Grid Company Marketing Standard System for County-level Power Supply Enterprises".
(6) Complete the daily work of the Measurement Department
Complete the settlement of electricity transmission from west to east, review the configuration of electric energy metering devices in grid-connected power plants, prepare marketing measurement and marketing project plans, and track project completion scenarios .
Professional and technical self-evaluation 4
Over the past year, with the support and help of leaders and colleagues in the work area, I have always insisted on uniting comrades, studying hard, and constantly improving my professional level. Strict requirements, paying attention to work procedures, consciously obeying organizational arrangements, and successfully completing various tasks assigned by leaders. I would like to report my work, study and ideological status over the past year as follows. Please criticize and correct me:
1. Work completion situation:
Over the past year, I have conscientiously performed my job responsibilities and based on my duties. , dedicated to their work, and together with the majority of employees, actively cooperated with the leaders of the work area and united as one, they mainly completed the following tasks:
1. Large-scale maintenance of 3# water heater and 4# steam furnace Work.
2. Maintenance work of two circulating pumps
3. Submission of 4t monthly material plan
4. 4t and central air-conditioning equipment Arrangement of accessories models
5. Handover and acceptance of central air conditioners
6. Be able to conscientiously complete temporary tasks assigned by leaders.
2. Learning and political and ideological situations
1. At work, I can humbly insist on learning from district team leaders, old comrades, brothers in the same industry, and practice Study, learn from society, constantly improve your business skills and political and ideological levels, and make yourself gradually mature. Able to manage time reasonably and study in a timely manner according to work needs
2. Pay attention to the study of political theory and stand firm. Able to participate in the political theory study organized by the Party Branch of the Mining District of the Group Company on time, conscientiously study and understand the important ideas of the "Two Sessions", keep my thoughts consistent with party organizations at all levels, and improve my political quality.
3. Existing deficiencies and directions for future efforts
In short, over the past year, I have been able to complete the tasks assigned by the leaders of the work area. This is due to the support and help of the leaders of the work area and colleagues. What is inseparable is the result of everyone’s close cooperation and collaboration. However, compared with the requirements of the leaders of the work area, there is still a certain gap: first, there is still impatience at work and not calm enough in the face of major events; second, the management level needs to be further strengthened and improved; third, theoretical study still needs to be strengthened and improved. It needs to be further strengthened and more professional and technical knowledge needs to be learned; of course, I still have many shortcomings and deficiencies. I would like to ask the organization and leaders to criticize and correct me. I will understand with an open mind in order to improve.
In the future work, I will be more strict with myself, continue to strengthen my study, overcome shortcomings, carry forward my achievements, unite my comrades, work hard, and contribute my meager strength to our mine and work area.
Professional and technical self-evaluation 5
20__ is coming to an end. I look at my work over the past year and evaluate the gains and losses of the year. I have many feelings. Over the past year, I have been passionate about my job, strictly demanding myself, correcting my work position, and always maintaining a "modest", "cautious" and "self-disciplined" attitude. With the care and cultivation of the leadership and the help and support of colleagues, I always study diligently, be enterprising, strive to improve myself, complete tasks conscientiously, and perform job responsibilities well. As a hardware engineer, in my heart, Shaanxi De Rong is my home, my leaders are my parents, and my colleagues are my brothers and sisters. De Rong’s affairs are my own affairs, and I have to work through my unremitting efforts. Perfecting the company's projects will enable our Shaanxi De Rong products to be launched into the market as soon as possible. I understand the responsibilities and obligations of being a hardware engineer at Shaanxi De Rong.
Looking back on the past year, I will evaluate my work in the following aspects:
1. Annual work situation
In the past year, I have learned from my familiarity with the company’s projects , gradually grew to be able to undertake some modules of the company's projects, and made due contributions to the company in these aspects. For me personally, my abilities have also been improved accordingly. However, the company's projects are complex and there is still a lot to learn, so I will continue to work hard to gain a deeper understanding of the details and difficulties in the project, hoping to see the perfect birth of the product through my own efforts.
During this year I mainly completed the following tasks:
1. On the basis of 20__, refine and study the various indicators of the radio station, and according to Deng We evaluated our own radio station testing methods based on the engineering proposals and civil aviation indicators, conducted detailed tests on our radio stations, and evaluated various performance of the radio stations based on the test records.
2. Based on the tracking and testing of the radio station, the existing problems of the radio station have been sorted out, and the corresponding parameters of each module have been modified. Subsequently, the schematic diagram of each module was modified, and solutions were proposed for the decimal frequency division problem of the transmitter frequency combination and the problem of large harmonics of the transmitter.
3. It took one and a half months to integrate and modify the system schematic diagram of the entire radio station. At the same time, the meaning of each signal of the entire radio station was clarified, which laid the foundation for subsequent research and development and testing.
4. Based on the test data of the transmitter, the transmitter was evaluated accordingly and some problems were raised, such as power instability, inaccuracy, modulation drift, large distortion, PTT timeout, etc., and then Cooperate with NPU to solve transmitter-related issues. During this period, we cooperated to solve the power stability problem, modulation drift problem, PTT timeout problem, etc. After solving these problems, we also evaluated a method and formula ourselves, which solved the transmitter-related problems in a more in-depth manner and provided the basis for subsequent transmitters. The foundation is laid for debugging and production.
5. Make further efforts to solve the problems of high distortion and high harmonics left by the transmitter. Try to make a MOD voltage generation circuit to narrow the scope of troubleshooting, try to use a custom filter to reduce harmonics, modify the power amplifier parameters, and solve the problem. Although the problem has not been solved well, we have found a direction. I want to continue working in this direction, and these problems will definitely be solved.
6. Start participating in the discussion and research of new solutions. The first is the modulation board, reducing the useless signal lines of the modulation board, using the DSP serial port protocol to communicate with ARM; then the power board, converting the original separate power board Integrated with the rectifier board, reducing connecting wires and increasing the heat dissipation area; then came the improvement of ARM, formulating an effective isolation plan based on the newly purchased ARM model, changing the original power supply method; and then based on the new requirements of the radio station , the frequency combination adds the function of decimal frequency division, so the frequency combination is designed using ADF4351 phase-locked loop.
7. Draw the PCB boards of the power board, modulation board and ARM adapter board, and participate in the discussion of the interface method of each board, and weld the ingredients for the PCB board.
8. In charge of the company's new project digital radio station, we produced a digital radio station test tool, planned a preliminary plan for the development of a digital radio station, conducted 3 outdoor tests, and evaluated the digital radio station. Although this The project did not proceed, but through this project, I learned a lot myself and felt the motivation for the company's development.
9. Conduct single board testing on the modulation board, ARM adapter board and power board, and then weld the shielding frame. During the welding and installation process, some structures are also modified and improved, and finally the functions are carried out. For performance testing, the new version of the modulation board, power board and ARM adapter board are jointly debugged.
10. On the Fudan project, we mainly did the following: 1) First, we became familiar with the basic situation of the project, and began to design the voltage sampling circuit and determine the model of the resistor; 2) As the project progressed, The resistors were finally determined and produced, and the basic circuit form was determined; 3) Then the size of the cabinet was determined based on the size of the resistors, the manufacturer was determined, and the busbars were designed and processed; 4) The project was subsequently submitted to Shanghai for evaluation, and based on the evaluation results Correct the installation dimensions and busbar installation method in the cabinet again.
11. Participate in the preparation of the company's 9000 audit documents, and finally integrate the location of the experimental bench, place tools, instruments and other items in their proper places, and integrate file cabinets to make the company office more tidy and standardize work processes and work Way.
2. Work experience
It has been more than a year since I came to the company. From a preliminary understanding of the project, to being familiar with the working principles of each module, to taking on the project modules alone Through research and development, I see myself growing, improving, and maturing. I also realize the importance of cooperation at work. Our radio system is very complex. Each of us is part of the complex system of the radio station, so our cooperation is very important.
3. Shortcomings in work
After a year of work and study, I also discovered that my deeper understanding of the project is not enough, and my ability to solve complex problems is not enough. , this is where I will continue to hone and improve myself in my work in the future. To evaluate it carefully, I mainly did not do well enough in the following aspects during my year of work:
1. I am not proficient in the professional and technical aspects of my work, and I have not found a solution to the distortion problem of the transmitter. , study should be strengthened in this regard to provide guidance for future work.
2. The working environment is not clean enough, the experimental table is not neat enough, and the instruments are not placed in place. I hope that in the future I will restrain myself to put the items in place and develop good habits. Habits determine success or failure, and good working habits will actively promote our work.
3. The work evaluation was not done well, and I did not actively evaluate the gains and losses and experience in my work, resulting in falling twice in the same place. I hope to strengthen this aspect in the future.
4. Work Plan
The next year is very important for the company. Not only will the radio station be sent to Civil Aviation for review, but the Fudan project will also be reviewed, which is very important to me. It is both an opportunity and a challenge for me, so I must work harder and contribute all my strength to the company's new breakthroughs.
Among them, the following points are what I will focus on improving next year:
1. Continue to improve working methods, seek new ideas at work, and regard innovation as a goal of work. , treat work, strive for perfection, and never make do if you can.
2. Strengthen the unity and cooperation of employees, highlight the characteristics of each person, and use all employees to complete the project.
3. Strengthen the study of professional and technical knowledge, improve practical skills and the ability to handle daily affairs.
In short, in the past year, I have been able to fulfill my duties, work actively and hard to complete my job, my workload is full, and I am generally satisfied with my work. In the new year, I will continue to improve the shortcomings in my work. As always, I will continue to work hard at my work. I also hope to get more understanding and support from leaders and comrades.
Five related articles on professional and technical self-evaluation:
★ Five personal professional and technical self-evaluations in 2020
★ Five personal professional and technical self-evaluations
★ Five personal professional and technical self-evaluation templates
★ Five selected teachers’ professional and technical self-evaluation templates
★ Five technical work self-evaluation templates
★ Five self-evaluations on the latest technical work
★ Five self-evaluations on job titles
★ Five self-evaluations on personal work of technicians
★ Comments Five self-evaluations for professional titles
★ Five self-evaluations for personal work
- Previous article:A limerick about 2020
- Next article:Hungry? Chivalry
- Related articles
- Two songs in spring
- Sentences suitable for girls to post on Moments
- Where is the western Sichuan prison?
- Famous calligraphers enter the campus
- What is the telephone number of Shuozhou Shanshui New Age Cement Co., Ltd.?
- 20 19 Youth Slogans
- What are the four major concepts of the Beijing Winter Olympics?
- What is the telephone number of Zhaoyuan Jinchao Jinao International Sales Office?
- Sange tile brand
- Class teacher service slogan