Responsibility book for safe demolition

Responsibility book for safe demolition

In study, work and life, the responsibility book is used more and more. The responsibility book is a document with clear responsibilities and aimed at different departments. What problems should be paid attention to in drafting the responsibility book? The following is the safety demolition responsibility book I compiled for you. You are welcome to study for reference. I hope it helps you.

Safety Demolition Responsibility Letter 1 Party A:

Party B:

In order to clarify the safety management responsibilities of both parties and the safety measures that should be taken, conscientiously implement the working policy of "safety first, prevention first", put an end to major accidents, and ensure the safety of people's lives and property, the following agreement is reached on the demolition and safe construction of old office buildings in accordance with the Law of People's Republic of China (PRC) on Safety in Production, Regulations on the Administration of Safety in Construction Projects and other relevant laws and policies:

I. Responsibility of Party A

(1) Timely convey and notify the important instructions and requirements of relevant functional departments on safety production, and urge Party B to implement safety construction.

(two) in violation of the norms of safe production, timely report to the relevant functional departments for investigation.

(3) In case of a safety accident, in addition to timely reporting to the police, it is necessary to report to the relevant functional departments at the first time, and the accident shall not be delayed or concealed. At the same time, protect the site, maintain order, and organize forces to cooperate with relevant departments to do a good job of disposal.

(4) Party A shall educate Party B about safety knowledge and urge Party B to inspect the potential safety hazards of the demolished houses.

(5) The expenses for house demolition and construction waste cleaning are RMB (Yuan:), which shall be paid to Party B after Party A raises the funds in place.

II. Responsibility of Party B

(1) Party B shall conscientiously implement the Law of People's Republic of China (PRC) on Work Safety, the Regulations on the Administration of Work Safety in Construction Projects and other laws and policies related to work safety.

(2) Party B is responsible for house demolition, building demolition and garbage removal.

(3) During the demolition process, Party B must wear safety helmet and safety belt, and take effective protective measures.

(4) Before demolishing the old house, cut off the power supply and turn off the natural gas. When demolishing buildings, protective frames and protective nets should be set up. Construction personnel should wear safety helmets and hang safety ropes according to regulations, effectively control dust, noise and vibration in the construction process, transport building materials and dispose of construction dregs and various wastes according to relevant regulations.

(5) Party B shall not commit any of the following acts during the house demolition construction: throwing wastes at high altitude; Backfilling toxic and harmful wastes as earthwork; Mud water is directly discharged into urban drainage facilities or rivers without treatment; Melting asphalt or burning linoleum, paint and other substances that produce toxic and harmful smoke and gas at the construction site without qualified devices; Do not work, live or operate in the building to be demolished; Other acts that should be prohibited.

(six) to strengthen the management of the construction site, improve all kinds of safety protection facilities. In the event of a safety accident, immediately organize forces to rescue, put an end to casualties to the maximum extent, report the accident in time, and do not delay or conceal the accident. After the safety accident, it is necessary to protect the site, actively cooperate with relevant departments to do a good job in investigation and evidence collection, and do a good job in the aftermath in accordance with responsibilities and relevant regulations to eliminate potential safety hazards. In case of safety accident, all responsibilities shall be borne by Party B. Party A shall not bear any responsibilities.

(7) Party B must buy insurance for operators before house demolition.

Third, others.

(1) This Responsibility Letter is made in duplicate, with each party holding one copy.

(II) This agreement shall come into effect as of the date of signing, and Party B will demolish the old house.

After the construction waste is cleaned up, it will be abolished by itself.

Party A (official seal):

Signature of representative:

Party B (signature and handprint):

20 12 mm/d

The second responsibility book for safe demolition is to strengthen the supervision and management of house demolition safety and protect people's lives and property. Prevent and control the occurrence of safety accidents in house demolition, and implement the laws, regulations, guidelines and policies of the state on safety in production. Construction personnel who carry out decorative demolition within the scope of internal demolition of houses in the planning area must pay attention to the following matters:

A, construction personnel

Construction waste should be cleaned up and ensured to be safe. Demolition should be carried out symmetrically from top to bottom, and large-scale demolition is not allowed at the same time. When one part is demolished, reinforcement or stabilization measures should be taken to prevent the other part from collapsing. When it is necessary to demolish by dumping due to special circumstances, it shall meet the requirements of Technical Regulations for Safety of Construction and Installation Engineering and meet the following conditions:

1: The cutting depth of the wall root shall not exceed one third of the wall thickness. When the wall thickness is less than two and a half bricks, no hollowing is allowed.

2. When excavating, effective measures must be taken to support the wall.

3. Before the ceiling is removed, a signal should be sent, and the nearby personnel can only do it after avoiding to a safe area.

4. Facilities such as wires, cables, gas pipelines, sewers and heating pipelines that need to be dismantled within the scope of the project shall be declared to the property department and operated according to relevant operating procedures.

5. Signs and full-time guardians shall be set up at the construction site of the demolition project, fences shall be set up around it, and red lights shall be used for warning at night; When demolition is carried out at a high place, a chute should be set first. Larger or heavier materials should be lifted by lifting ropes or cranes, and it is forbidden to throw them down.

6. Demolition shall conform to the requirements of environmental protection, and the demolition garbage shall be neatly stacked, and the construction garbage shall be transported according to regulations, and shall not be burned at the construction site.

7. The construction unit undertaking the demolition project shall handle the personal accident insurance for its personnel engaged in the demolition operation, and carry out the construction in strict accordance with the safety production and construction regulations to ensure the safety of personnel.

8: Party B shall take full responsibility for all accidents caused by illegal operation in the construction process.

9: This Responsibility Letter is made in duplicate, with each party holding one copy.

2. Safety management of hot work

1. If Party B needs to use fire in the construction, it must show the welder qualification certificate to the security department of the mall, apply to the relevant security department of the mall for formalities, and the construction can only be started after approval.

2. In the process of construction, the construction personnel must hold a valid qualification certificate before hot work. If others do hot work at will, the parties concerned will be held accountable and the hot work will be stopped immediately.

3, hot work site must have security personnel on-site monitoring, and equipped with fire fighting equipment before hot work. If there is no security at the scene, hot work shall not be carried out, otherwise the relevant responsibilities of the hot work personnel shall be investigated.

4. During the hot work, the combustible materials in the area below the hot work must be cleaned. If it cannot be cleaned, strict fire prevention measures must be taken.

Party A (seal): Party B (signature):

20xx x month x day 20xx year x month x day

The third responsibility book for safe demolition is to strengthen the supervision and management of house demolition safety work and protect people's lives and property. Prevent and control the occurrence of safety accidents in house demolition, and implement the laws, regulations, guidelines and policies of the state on safety in production. In the planning area of housing demolition within the scope of the implementation of housing demolition households, we must pay attention to the following matters:

1. The requisitioned building materials shall be owned by Party A in principle (due to evaluation and compensation). If Party B actively cooperates with the requisition work, actively removes and cleans the construction waste and ensures safety, the building materials will be awarded to Party B. ..

Second, the demolition should be carried out symmetrically from top to bottom, and several layers should not be removed at the same time. When one part is demolished, reinforcement or stabilization measures should be taken to prevent the other part from collapsing.

Three, due to special circumstances, the demolition method must be adopted, should comply with the requirements of the "technical regulations for safety of construction and installation engineering", and should meet the following conditions:

(a) The depth of digging the wall root shall not exceed one third of the wall thickness. When the wall thickness of 1 is less than two and a half bricks, no excavation shall be conducted;

(2) When excavating, effective measures must be taken to support the wall;

(3) Before being pushed down, a message should be sent out, and it can only be carried out after nearby personnel have escaped to a safe area.

Four, the need to dismantle the wires, cables, gas pipelines, sewers, heating pipelines and other facilities within the scope of the project, should be declared to the relevant units, and in accordance with the relevant operating procedures. Five, the demolition project construction site, should set up signs and full-time guardians, and set up fences around, there should be a red sign at night; When demolition is carried out at a high place, the chute should be set up first. Large or heavy materials should be lifted by lifting ropes or cranes, and it is forbidden to throw them down.

6. Bury your own water cellar to ensure the safety of people and animals.

Seven, house demolition should comply with the requirements of environmental protection, demolition of garbage must be neatly stacked, construction waste removal in accordance with the provisions, shall not be burned in the construction site.

Eight, undertake the demolition project construction unit, should be engaged in the demolition work personnel for personal accident insurance, in strict accordance with the safety production and construction procedures, to ensure the safety of personnel.

9. If Party B decides to dismantle it by itself, it must be carried out in accordance with the above requirements, and the responsibility for safety accidents caused by self-dismantling shall be borne by Party B. ..

X this responsibility letter is made in duplicate, one for each party.

Party A (seal): Party B (signature):

Responsibility Letter for Safe Demolition 4 In order to strengthen the safe construction management of house demolition, conscientiously implement the working policy of "safety first, prevention first", put an end to safety accidents and ensure the safety of people's lives and property, Party A entrusts Party B to build 28 two-story houses on the east side of Huancheng River north of Xiangyang Road and south of Xu Wei South Road (the specific location is from.

1. Conscientiously implement the laws and policies related to production safety, such as the Law of People's Republic of China (PRC) on Production Safety and the Regulations on the Administration of Production Safety in Construction Projects.

2. Improve the safety production system, establish a responsibility system with the legal representative as the first responsible person, improve emergency rescue measures, and ensure safe construction, so as to achieve "organization has guarantee, tasks have requirements, work has inspection, and prevention measures".

3. Make clear the responsibility for safe production of house demolition, and sign a letter of responsibility for safe and civilized construction with the project leader. Set up enclosure facilities and warning signs around the construction site. Fire-fighting facilities should be kept in good standby condition, and temporary facilities, mechanical equipment and building materials should be arranged according to the general construction plan, so as to ensure the smoothness and cleanliness of entrances and exits and the site.

4. Before demolishing houses or structures, cut off the power supply and turn off the natural gas. When demolishing buildings, protective frames and protective nets should be set up. Construction personnel should wear safety helmets and hang safety ropes according to regulations, effectively control dust, noise and vibration in the construction process, transport building materials, and dispose of construction muck and various wastes according to relevant regulations.

5. Party B shall not commit the following acts during the house demolition construction: throwing garbage at high altitude; Backfilling toxic and harmful wastes as earthwork; Mud water is directly discharged into urban drainage facilities or rivers without treatment; Melting asphalt or burning linoleum, paint and other substances that produce toxic and harmful smoke and gas at the construction site without qualified devices; Working, living or non-operating in the building to be demolished; Other acts that should be prohibited.

6. Actively cooperate with the supervision, inspection and guidance of relevant departments. For the existing problems, it is necessary to formulate rectification plans such as rectification measures, financial guarantee and completion date, take effective measures in time to eliminate potential safety hazards, submit written materials for safety inspection and rectification within the specified time, and submit the rectification situation to Party A. ..

7. Strengthen construction site management and improve various safety protection facilities. Once a safety accident occurs, we should immediately organize forces to rescue, put an end to casualties to the maximum extent, report the accident in time, and do not delay or conceal the accident. After the safety accident, it is necessary to protect the site, actively cooperate with relevant departments to do a good job in investigation and evidence collection, and do a good job in the aftermath in accordance with responsibilities and relevant regulations to eliminate potential safety hazards.

Safety Demolition Responsibility Letter 5 Party A: Changshan City Development Investment Co., Ltd.

Party B:

In order to strengthen the construction safety management of the demolition project of the elderly hospital, enhance the safety awareness of the construction personnel and ensure the safety of house demolition without accidents, Party A and Party B hereby sign the following safety construction responsibility letter:

A, safety management objectives

Party B shall complete the house demolition project of the old people's hospital in the county on time, with good quality and quantity, and ensure that there are no casualties, serious injuries and deaths during the house demolition.

Second, Party A's safety management responsibilities

1. Earnestly implement national and local laws and regulations on safety management, urge Party B to submit the organization plan and measures for the safe construction of house demolition to the safety supervision station of the County Housing and Construction Bureau for review and filing before the demolition construction, and handle personal accident insurance and other safety guarantee procedures for construction workers and surrounding pedestrians according to the requirements of the safety supervision station.

2. Entrust the safety management personnel of the supervision unit to supervise the whole process of house demolition, put forward rectification opinions in time when finding hidden dangers, and urge the rectification to ensure the safety of house demolition without accidents.

3. Party A has the right to go to the site from time to time to check the logs of safety management personnel, and urge Party B to implement the rectification opinions put forward by the safety officer.

4. Before the demolition construction, Party A shall notify the relevant departments of power supply, water supply and telecommunications to do a good job in the relocation of all lines to ensure the safe and smooth demolition construction of Party B. ..

Three. Safety management responsibilities of Party B:

1, the safety management personnel of the house demolition construction unit must hold relevant certificates, and the construction personnel must receive safety technical training before taking up their posts. In the process of construction, the construction must be organized in strict accordance with the established and approved implementation plan of safe construction technology for house demolition.

2. In addition to handling personal accident insurance for all construction workers who demolish the house, Party B shall also handle personal accident insurance for the surrounding pedestrians, and submit the insurance policy to Party A and the safety supervision station for filing before the house is demolished.

3. Party B shall pay Party A a performance bond of 200,000 yuan for construction safety as promised. Give it to Party A within three working days after the house demolition contract is signed, and return it according to the performance of the house after the house demolition and muck cleaning are completed (interest-free), and return it in full without safety accidents (interest-free).

4. At the house demolition site, the full-time safety management personnel provided by Party B must communicate with the safety management personnel of the supervision unit entrusted by Party A, and timely rectify the rectification opinions put forward by the safety management personnel.

5. All managers and construction workers who are allowed to enter the demolition site must wear safety helmets, and construction workers are forbidden to wear slippers and work after drinking.

5, the construction site should be equipped with warning signs, street downtown public * * * channel, safety protection facilities should be set up, the ground should be set up railings and other isolation devices, in the stairs, floor edge, opening, balcony edge operation, isolation railings and scaffolding and other protective measures must be set up.

6, housing demolition contractor must be civilized construction, housing demolition site to hang relevant warning signs and warning signs; Measures should be taken to control and evacuate pedestrians and vehicles in the corridor; Effective measures should be taken to control dust and noise so as not to affect the daily life of residents as much as possible.

7. After the house demolition contract is signed, Party B shall bear all medical expenses and compensation expenses for all casualties during the house demolition construction, and at the same time, Party A will deduct 50% to 100% of the performance bond for safe construction from Party B according to the severity of the accident.

8. This responsibility book is made in quintuplicate, one for Party A's file, one for Party A's finance, one for Party B's file, one for the county housing and construction bureau's safety supervision station and one for the entrusted supervision unit. This responsibility book shall come into effect as of the date of signature.

Party A (seal): Party B (seal):

Legal representative: legal representative

Supervisor: Manager: Supervisor:

Handler:

Date of conclusion: year month day.

;