Joke Collection Website - News headlines - Rectification Notice for Hidden Construction Hazards

Rectification Notice for Hidden Construction Hazards

Construction rectification notices often have many problems, large and small, so the relevant inspection departments will conduct strict inspections. When the inspection fails, the construction party will be asked to make rectifications, so that the project can be guaranteed. Let me share with you the rectification notice for hidden construction hazards. You are welcome to read it.

Notice of Rectification of Hidden Construction Hazards 1

_Construction Huanyu Labor Service Co., Ltd.-Jiarong. Jingxiu Shangcheng 2#, 3# Project Department:

In On June 17, 20_, during the inspection (acceptance) of the construction safety (civilized construction) of your construction site, it was found that the following major hidden dangers and problems existed at your construction site. We hope that a dedicated person will be assigned to supervise the rectification. If the corrective measures are not implemented (not timely), it will be dealt with according to the "Construction Law of the People's Republic of China" until the work is ordered to stop. All consequences and economic losses caused will be fully borne by your company.

1. Main hidden dangers, problems and requirements: 1. The edge protection of Buildings 2 and 3 is not perfect. 2. The outer frames of Building 2 and Building 3 have not been laid. 3. The double-layer construction of the woodworking room is not perfect, and the electric saw in the woodworking room does not have a safety guard, which poses safety risks. 4. The stacking of materials on site is not standardized. 5. The scattered materials on site were not cleared in time. 6. Steel products (divided into raw materials, semi-finished products, and finished products) are not divided into stacking areas and are not listed, and the raw material models are not marked. 7. The installation of the third-level distribution box is not standardized (the tower crane operating system should implement an independent power supply, and the lighting system on the tower crane cannot be connected to the operating system power supply), and the power supply line system implements a "three-phase five-wire system". 8. Various machinery on site did not fully implement "one machine, one gate and one protection". 9. Do a good job in preventing heatstroke and cooling down.

2. Handling opinions: 1. Immediate rectification according to the "Provincial Construction Safety (Civility) Inspection and Acceptance Scoring Rules" and must be completed before June 21, 20_. 2. Your company’s project department must report the rectification situation to our company in writing before June 22, 20_. 3. If your company refuses to make rectifications within June 20, 20_, our company will directly arrange rectifications, and all costs incurred will be double deducted from your company's progress payment. 3. This notice is made in duplicate, with one copy each for the company and the engineering and labor project department.

_Jinxin Tongda Construction and Installation Engineering Co., Ltd.

June 19, 20_

Notice of Rectification of Hidden Construction Hazards 2

Construction site safety hazard rectification notice

Project Department:

After inspection, your department has the following safety hazards during the project construction process. Please read this notice carefully and promptly after receiving this notice

1. Failure to establish a safety management agency or assign full-time safety production management personnel in accordance with regulations.

2. Project managers, safety officers and other safety production management personnel are not on site to supervise the construction of sub-items.

3. Project leaders, full-time safety production management personnel, operators or special operations personnel engage in relevant work without safety education training or failing assessment.

4. Failure to prepare technical safety measures, temporary power supply plans for the construction site or special construction plans in the construction organization design, or the construction organization design has not been approved.

5. The technical requirements for safe construction were not explained in detail before construction or were not signed and confirmed by both parties. □Special operations personnel do not receive special safety operation training and obtain special operation qualification certificates before taking up their posts in accordance with regulations.

6. Failure to provide employees with labor protection supplies that comply with national standards or industry standards.

7. Failure to set up obvious safety warning signs at dangerous parts of the construction site or failing to set up fire escapes, fire water sources, fire fighting facilities and fire extinguishing equipment at the construction site in accordance with relevant national regulations.

8. The construction site is not laid out in accordance with the company’s CI information requirements.

9. Temporary buildings at the construction site do not meet the requirements for safe use, such as bamboo sheds, asbestos tiles, and linoleum.

□ No special protective measures have been taken for adjacent buildings, structures and underground pipelines that may be damaged due to construction.

10. No closed enclosure is implemented at the construction site of the construction project or the enclosure setting does not meet the specification requirements.

11. Failure to comply with relevant environmental protection laws and regulations results in dust, waste gas, waste water, solid waste, noise, vibration and construction lighting at the construction site causing harm and pollution to people and the environment.

12. Canteen hygiene and drinking water hygiene are poor; there are no first aid measures and first aid equipment.

13. Scaffolding materials that do not meet the requirements are used at the construction site.

14. The foundation of the floor-standing scaffolding poles is uneven and not solid; there is a lack of bases and pads; there are no sweeping poles or drainage measures.

15. The number of ties between the scaffolding frame and the building structure is insufficient; the ties are not strong and standardized.

For the above hidden dangers, please complete the rectification and follow up investigation within _ days after receiving the notification.

Signing person:

Signing time:

Note: This form is made in triplicate, with one copy kept by the project department and two copies kept by the company

Notice of Rectification of Hidden Construction Hazards 3

_______ Nursing Service Center:

On the morning of ____, month ____, 20____, the County Civil Affairs Bureau and the County Public Security Bureau , the county fire brigade, the county Disabled Persons’ Federation, and the county work safety supervision bureau conducted safety production inspections on your unit. After on-site inspection, it was found that there are safety hazards in your unit. The safety hazards and rectification opinions are now notified as follows. Please make rectifications carefully.

1. Potential safety hazards

(1) Window iron bars and kitchen rolling shutter doors are not conducive to emergency escape;

(2) Some fire extinguishers have insufficient pressure;

(3) Firewood is piled next to the iron door of the kitchen, making the passage blocked;

(4) The TV wires use flower wires, which poses a safety hazard;

( 5) The windows at the stairwell on the second floor are close to old houses in residential areas. Isolated from residential areas.

2. Opinions on rectification

(1) Remove window iron bars and kitchen rolling shutter doors;

(2) Replace failed fire extinguishers;

(3) Stack firewood in another place to keep the kitchen iron door passage clear;

(4) Replace the TV wires;

(5) Close the windows at the stairwell on the second floor to communicate with residents District isolation.

(6) Gas masks will be provided on the second and third floors;

(7) A safety inspection system will be established and inspectors will be deployed 24 hours a day.

Regarding the above safety hazards and rectification suggestions, your unit is requested to attach great importance to them, study them carefully, and formulate rectification measures as soon as possible. The rectifications must be put in place in the near future, and the rectification situation must be reported to the bureau.

________ Civil Affairs Bureau

____month____, 20____

Notice of Rectification of Hidden Construction Hazards 4

Unit name: ____________ Address: ____________________

Type of use: ____________ Building area and number of floors: __________

According to the spirit of the Ministry of Public Security’s “Combating Fire Hazards” campaign document, we _______ A fire safety inspection was conducted on your unit on _____, month, _____, and it was found that you had the following violations of fire protection laws and regulations:

1. □ Without fire protection design review, □ Fire inspection and acceptance, □ Filing and spot inspection, □ Before being put into use, fire safety inspection before operation;

2. The color steel plate building is built with polystyrene as a sandwich material;

3. Production Operations and personnel accommodation are not separated by fire prevention, employee dormitories are set up illegally, and fire and electricity are used illegally;

4. Fire-fighting facilities, equipment, and fire safety signs are not kept intact and effective;

5. Unauthorized □ deactivate or □ dismantle fire-fighting facilities and equipment;

6. □ Occupy, □ block, □ close evacuation passages and safety exits;

7. □ Occupy, □Blocking or □Sealing fire truck passages;

8. Other fire safety violations:

Person in charge of the unit being inspected (signature): __________

Contact number :_______________

Safety Inspector (Signature): __________

_____month_____day, 20_____

Notice of Rectification of Hidden Construction Hazards 5

Company:

Year, month, day

The People's Government of Gaojiaying Town conducts a safety production inspection of your company in the area. After an on-site inspection, it was discovered that your company has many potential safety hazards. The safety hazards and rectification opinions are now notified as follows. Please make rectifications carefully.

1. Potential safety hazards

1. Safety knowledge is not properly publicized, and there are no warning slogans or warning signs in dangerous operating areas.

2. The safety production management system is imperfect. There is no public safety management system in the working area and no safety production records.

3. There are no safety warning signs or road signs on dangerous sections of roads in the mining area; the access road for workers to and from is steep and there are no safety protection measures.

4. The reinforcement measures for the mining tunnel entrance are incomplete and there is a risk of collapse; there are no safety protection measures in the temporary mining area and there is a risk of landslide.

5. The workers’ living area is close to the mining area and is located at the entrance of the cave or downstream of the ravine. There is a lack of safety precautions and there are potential safety hazards.

6. The workers’ dietary hygiene conditions are poor and the facilities are crude, posing potential food hygiene and safety hazards.

7. The fire prevention, flood prevention and safety production plans in the mining area are not perfect.

2. Opinions on rectification

1. Strengthen the publicity of safety production knowledge. Strengthen daily safety education for workers. Improve workers' self-safety awareness through publicity.

2. Make fixed warning signs and safety slogans at construction sites, sites, and roads to create an atmosphere for safety production publicity and education.

3. Reinforce holes and roads with potential safety hazards in accordance with technical standards. Drainage ditches must be built above the cave entrance to prevent landslides or collapses.

4. Improve workers’ accommodation conditions. Outside the mining operation area, choose a safe location and build worker sheds to meet the basic safe accommodation conditions for workers (2-month rectification period).

5. Improve workers’ dietary conditions and pay attention to dietary hygiene. Improve food poisoning prevention measures.

6. Establish a production safety inspection log.

Personnel in charge of production safety must insist on inspecting key areas, sites, and roads every day, and deal with hidden dangers in a timely manner if they are discovered.

7. Adhere to the system of leadership leading the team to go down the well; establish a registration system for workers entering and leaving the well.

8. Improve the safety system, identify full-time safety officers, clarify responsibilities, strengthen monitoring and inspections, and keep safety production records.

9. Improve fire prevention, flood prevention, production safety and other related plans.

10. Strengthen guard management and refuse irrelevant personnel from entering the mining operation area.

11. Complete relevant licensing procedures in a timely manner.

Your company should attach great importance to the above safety hazards and suggestions for rectification, study them carefully, formulate rectification measures as soon as possible, and rectify them item by item. Except for item 4, all rectification opinions must be rectified before the end of the day, and the rectification status must be reported to the town government. Gaojiaying Town People's Government

February o_year_month_day

Related articles on the rectification notice of construction safety hazards:

★ Rectification notice of construction safety hazards Letter

★ Rectification Notice for Safety Hazards

★ Sample Construction Rectification Notice

★ Rectification Notice Template for Safety Hazards

★ Notice on Rectification of Potential Safety Hazards in Construction Projects

★ Notice on Rectification of Hidden Safety Hazards in Construction Projects

★ Notice on Rectification of Hidden Safety Hazards on Construction Sites

★ Sample Notice on Rectification of Hidden Safety Hazards in Production Safety

★ 3 sample construction rectification notices

★ Project construction rectification notices