Joke Collection Website - News headlines - Thermal power plant work summary
Thermal power plant work summary
Thermal power plant work summary
Summary is a written material that analyzes and studies the relevant situations in a certain stage and makes guiding experience methods and conclusions. It can improve our findings. The ability to answer questions, so we must do a good job of summarizing and writing a good summary. How to write a summary so that it doesn’t become a formality? The following is a summary of the work of thermal power plants that I have compiled for you. You are welcome to share it.
Thermal Power Plant Work Summary 1
In February, the power plant generated 52.38 million KWh of electricity. Under the leadership of the factory department, the Equipment Technology Section started with the details of equipment management and technical management. , focused on inspecting and supervising equipment inspection, lubrication, original records, etc. to standardize them, and combined with the trial operation of the work point system, continued to strengthen professional management and assessment, so that the professional management of the power plant gradually became formal. The main work is as follows:
1. This month we mainly organize the work according to the work responsibilities and standards of the power plant equipment technology department, starting from the basis of equipment and technical management, continuing the two inspections and one announcement system, and conducting inspections on the entire plant. All-round supervision and guidance on basic management of equipment technology.
2. This month, due to the Spring Festival and boiler maintenance, we conducted three professional comprehensive inspections on the entire factory, with 23 inspection items and 17 assessment items, and the final assessment score was 51 points , the problem focuses on inspection and record writing. After inspection and assessment, the staff gradually paid attention to professional management, and various system standards were effectively implemented.
3. Cooperate with each workshop in a timely manner to complete the reporting, expediting and acceptance of spare parts, and implement the spare parts one by one for several major transformation projects currently restricting the power plant. The 1#2# core barrel transformation The heat-resistant stainless steel plates have arrived at the factory; the agreement for the modification of the 3# furnace fan has been signed, and spare parts will arrive at the factory in mid-April; under the coordination of the company, the chain bucket machine has begun to be shipped and installation will begin soon. The coal feeder belt and the air conditioning of the computer room are still being actively coordinated with relevant departments.
4. Equipment operation status this month:
On the afternoon of February The pads on the left and right sides were replaced. At the same time, other parts of the boiler were comprehensively inspected and repaired, and some defects that could not be dealt with without stopping the boiler were resolved. It was connected to the grid at noon on February x. On the afternoon of February x, the pin of the primary fan coupling of furnace No. 3 broke, causing an emergency shutdown of the furnace. Four hours later, the turbine was connected to the grid. The rest of the equipment is normal.
5. This month, relevant majors were also organized to conduct statistical reports on the technical transformation and energy-saving projects in XX. At the same time, a plan has been formulated for the transformation of the boiler limestone silo. The material plan has been submitted and construction will be organized after the materials arrive at the factory.
6. Consumption situation
This month *** 375,522.50 yuan was shipped out of the warehouse, including: labor insurance 18,392.83 yuan, acid 16,996.26 yuan, alkali 3,748.87 yuan, loader cost 62,367.75 yuan, not listed The assessment cost was 91,500.93 yuan (one water supply pump for the first phase, one two-color water level gauge for the 3# furnace), and the power plant maintenance cost was 175,994.69 yuan (33.6 yuan/10,000 degrees), including 28,392.84 yuan (5.4 yuan/10,000 degrees) for the boiler workshop, and 28,392.84 yuan (5.4 yuan/10,000 degrees) for the turbine The workshop costs 86,681.81 yuan (16.5 yuan/10,000 kWh), the electrical instrument workshop costs 54,734.54 yuan (10.4 yuan/10,000 kWh), and the loader class costs 6,185.5 yuan (1.2 yuan/10,000 kWh).
This month's sales increased by 83,801.38 yuan compared to last month's 92,193.31 yuan. The main items include: DEH filter element 2,329 yuan; magnetic flap level gauge 2,222 yuan; first-phase water supply pump accessories 63,447 yuan; 3# machine height additional water door 11,160 yuan; The repair fee for the high-voltage motor in the electrical instrument workshop is 26,495 yuan; the online testing spare parts are 4,928 yuan; the computer control panel of the 1# air compressor is 9,226 yuan;
The slag combustible content is: 2.0%, 1.5%, 1.3%. , respectively, compared with 1.20%, 1.03%, and 0.39% of the previous month, an increase of 0.8, 0.47, and 0.81
The combustible content of fly ash was: 0.4%, 0.7%, respectively, compared with 0.17% and 0.26 of the previous month. %, up 0.23, 0.44
Steam production per ton of coal was 3.63t, up 0.2t from 3.43t last month
Acid consumption was 16.22 tons, and acid consumption per ton of water was 0.459 kilograms
p>
The alkali consumption is 13.84 tons, and the alkali consumption per ton of water is 0.39 kilograms
7. Repair and recycling of old items
***This month, 10 items of repair and recycling were repaired and reused. 33 pieces were old, including 8 pieces in the electrical instrument shop, 21 pieces in the steam turbine shop, and 4 pieces in the boiler shop. In addition, the steam turbine shop used 20 meters of waste pipes to transform the outlet pipe of the exhaust fan of the No. 1 unit.
Work plan for August and February
1. In February, the Equipment Section will continue to do a good job in two inspections and one announcement, further refine the equipment technical management work, and promote the progress of each workshop. Professional management work.
2. Cooperate with Shandong Deere Installation Company in the prefabrication of the core tube and the technical transformation of the limestone silo.
3. Continue to implement the reporting and procurement of spare parts. The chain bucket machines are stepped up to expedite shipments to solve the problem of long-term manual slag removal. Urgent purchase of spare parts for pneumatic ash conveying, coal feeding belts, and air conditioners.
4. Cooperate with the workshop to carry out maintenance work. Summary of Thermal Power Plant Work 2
It has been more than a year since I started working. During this more than a year of work, I have studied hard and researched technology, and I have been constantly improving and improving both in terms of ability and ideological quality. Perfect, with the care of the company and the team, I have transformed from a student who has just entered the society to a power plant operator who is constantly making progress.
Since this year, in terms of my job responsibilities, I am very grateful to the company leaders and team members for their support and help, which allowed me to practice the knowledge I learned in the textbooks and learned things that I could not learn in school. thing. The achievement of these achievements is inseparable from the help of leaders and team members. Here is a summary of the work over the past year:
1. Work conscientiously and responsibly, be dedicated and love your job, demand yourself according to the company's philosophy, treat others with integrity, work hard, obey leadership arrangements, and encounter a lack of personnel in the team At all times, we persist in our posts, work hard, overcome our own difficulties, conduct careful inspections, and do not miss any small equipment defects on site. When problems are discovered, we report them to the team leader immediately, thus avoiding major equipment accidents. occur. I always treat my work with a positive attitude, especially during the minor maintenance period of this year, unit #2 worked at 12:00 for more than 20 consecutive days. Although it was hard, I learned things that I could not learn when the equipment was running normally.
2. Technically study carefully, study carefully in theory, and strive to memorize the operating procedures; in practice, strictly abide by the operating procedures, cultivate correct operating capabilities, ensure that no misoperation accidents occur, and perform the work properly Record the problems you encounter, the experiences you gain, and the precautions at any time, and humbly ask your master for advice. Although you have already started working independently, you know that it takes time to hone and accumulate knowledge, step by step, to learn the operation knowledge thoroughly. Let yourself get stronger day by day. Don't forget to use books, the Internet and other resources to supplement yourself after work, broaden your horizons, continue to recharge, and make up for your shortcomings. At the same time, after the unit entered winter operation, the company strictly focused on the employees' lack of safety awareness of the unit in winter operation, and organized each team to study. Through organized training, I realized the lack of my technical knowledge, which inspired me to study harder in the future.
3. Ability includes coordination ability and accident handling ability. If "technology" is compared to "IQ", then "ability" can be compared to "emotional quotient", and the same is true for operation. High IQ will not be seen. You have to have high emotional intelligence, because technology is dead and ability is alive. My one-year working experience tells me that only by learning and applying can I do my job better.
4. Accumulate work experience and implement the company’s “energy saving and consumption reduction”. On the basis of qualified water quality, we must strive for excellence and safe operation first, and economic operation must also be taken into consideration. For example, when the water quality of the auxiliary machine is not consistent, the sewage discharge is started in time to ensure that the water quality reaches the standard in the shortest time. Chemical personnel are contacted to check the water quality in time. Once the water quality is qualified, the sewage door of the auxiliary machine pool is quickly closed to ensure the safe operation of the unit and ensure the safety of the unit. Reduces waste of auxiliary machine water.
5. During one year of work, I also realized my own shortcomings, such as the lack of on-site equipment operation and technical knowledge, and sometimes the lack of awareness of safety work. In the future study work, I will improve my enthusiasm and initiative in learning, so that I can grow into a qualified inspection personnel as soon as possible, and strengthen the company's learning and understanding of safety regulations, so as to make contributions to the safe operation of the unit. effort. Thermal Power Plant Work Summary 3
In XX, with the joint efforts of all employees, we adhered to the policy of "safety first, prevention first", conscientiously implemented the spirit of the relevant documents on production safety of the Electric Power Bureau, and comprehensively Strengthen safety management, continue to establish and implement the most basic safety management regulations, establish and improve the safety guarantee system, implement safety management responsibility systems for personnel at all levels, focus on the implementation of "two votes and three systems", and To prevent the occurrence of personnel-related accidents, with the focus on preventing personal injury and death accidents, we launched a campaign against the "six no's" (not issuing work tickets, not giving details before work, not monitoring the site, not cutting off power during work, not checking electricity, and not connecting to the ground). The main content of the fight against personal accidents is line), anti-pole prevention, and anti-electric shock, and various forms have been adopted to improve the level of safety management, making the safety situation of our institute basically stable. Now we will briefly review the safety work in XX and arrange the safety work goals in XX.
1. Completion of safety production goals in XX:
1. 365 days of safe production throughout the year;
2. No serious personal injury or above in power production occurred Accidents;
3. No major rural power grid accidents occurred;
4. No fire accidents with economic losses exceeding XX yuan occurred;
5. No An electrical misoperation accident occurred;
6. There was no falling accident from high altitude;
7. There was no major and equal or above-level responsibility related to power production;
8. There has been no accident involving damage to equipment, machinery, tools, or vehicles in which the economic loss caused by personal responsibility exceeds 5,000-10,000 yuan;
9. There has been no major impact due to communication interruption. The operation and accident handling caused the accident to expand or constituted a communication obstacle to the accident;
10. No equipment accidents caused by poor maintenance quality have occurred.
11. As of December 1, XX , achieving 334 days of annual safe production and a total of x days of safe production.
2. Pay close attention to the operation and maintenance of line equipment and solve difficult and outstanding problems:
According to the analysis of the operation of line equipment in previous years, line tripping is basically caused by lightning arrester and transformer faults. From the analysis of the causes of arrester failures, there are many old-fashioned valve types, mainly because they have been running for a long time and have never been tested. From the analysis of the causes of transformer failures, the degradation of insulating oil performance accounts for a larger proportion. In XX, our institute eliminated and replaced a batch of arc-extinguishing drop switches and zinc oxide arresters, and installed a batch of transformer head sheaths. Based on the analysis of the operation, the actual effect is very obvious. Therefore, this year, our institute replaced the remaining 58 sets of old valve-type arresters in the entire network area with zinc oxide arresters, replaced 23 sets of arc-extinguishing drop switches, and installed 232 sets of sheaths on the transformers.
This year, our institute's 10KV line *** experienced switch tripping 3 times, a decrease of 5 times compared with the same period in XX (8 times), laying a solid foundation for ensuring safe production throughout the year.
3. Strengthen basic management and establish a long-term mechanism for safety production management:
1. Strengthen safety training and improve employee safety quality: Practice has proved that improving employee safety quality is the key to preventing accidents. This measure must be intensified. Learn what you don’t know, and learn what you don’t understand. Based on the employee training plan formulated at the beginning of this year, our institute carried out various safety training activities with goals and objectives, and organized employees to learn about electricity. The bureau has compiled and printed a book of "Habitual Violations that Should Be Prevented on Site", and has conducted discussion activities focusing on the links where violations are prone to occur at work to improve the ideological awareness of all employees against violations. This helps employees take the initiative in production safety.
2. Effectively carry out risk point analysis, prevention and control to nip problems in the bud. Based on the known situations in the past and present, analyze, judge and speculate on the dangerous points existing in the operation, give full play to the role of employees, carry out in-depth and long-lasting analysis and pre-control of dangerous points, be realistic and pragmatic, and achieve results. Improve the accurate application of "Danger Point Analysis and Pre-Control" in actual work.
3. Continue to increase the implementation of the "two votes" and effectively ensure the seriousness of the "two votes". What is the *** work vote of our institute this year? After being reviewed by the Electric Power Bureau, all of them passed, achieving a good result of 100% of the "two votes" passing rate.
4. The assessment of “quarterly safety and accident-free activities” was carried out seriously and solidly, ensuring the realization of the annual safety goals in a short period.
5. Based on the annual "two measures" plan of the Electric Power Bureau, we formulated an annual "two measures" plan that is in line with our actual situation, and implemented it in place.
6. Safety responsibilities have been decomposed at all levels, all kinds of violations have been eliminated, the investigation and punishment of "three violations" has been intensified, individual security teams and team security offices have been implemented, and the entire office has coordinated and coordinated *** Working together, no violations occurred in our work this year, thus achieving the goal of "zero" violations.
7. Strengthen the two-season inspection and daily maintenance management of equipment. Based on load changes and seasonal characteristics, special safety inspections have been carried out to target frequent and dangerous accidents, and preventive measures have been taken to ensure the healthy operation of the equipment. In the two quarters of maintenance work this year, our office adhered to the maintenance principle of "repairs must be repaired, repairs must be repaired", all needle bottles and suspension bottles were cleaned, and all transformers, capacitors and ancillary equipment were cleaned , the parallel hook clamps at the lead connection points were disassembled and cleaned; all 232 groups of valve-type arresters in this network area were replaced with zinc oxide arresters, 232 sets of high-voltage sheaths of distribution transformers were installed, and 165 sets of low-voltage sheaths were installed to clean up the line channels 90 places, 1216 trees along the line were cut down or trimmed; 2 places where the high-voltage leads were replaced with insulated wires; 11 unqualified pin bottles were replaced, 2 places and 3 pieces of hanging bottles were replaced; 5 places of tie wires were replaced; pillar bottles were used to heighten the Methods: Adjust the distance between the supporting points, the supporting points, and the supporting points on the special pole type at 2 points; cultivate 11 bases of soil at the pole roots; remove 45 other defects.
4. Actively carry out "love activities" and implement "safety projects":
Since this year, our office has conscientiously implemented the State Grid Corporation's "On Carrying out "Love Activities" and Implementing "Safety Projects" "Decision" spirit, strictly follow the requirements of the Electric Power Bureau Civilian Power Generation [XX] No. 41 "Work Plan for Carrying out "Love Activities" and Implementing "Safety Projects" on Safety Production, and conscientiously implement it. By carrying out "love activities", we organically combine rigid systems with humanized management, vigorously advocate the "love concept" of caring for the enterprise, caring for others, caring for ourselves, caring for our families and caring for society among employees, and vigorously strengthen education and training. Improve the quality of all employees and achieve the common development and harmonious progress of employees, enterprises and society; through the implementation of the "Safety Project", with the goals of power grid safety, employee safety, corporate stability, and social harmony, we will establish "Safety" throughout the entire institute Concept", establish a "safety mechanism", build a "safety culture", and promote the realization of safe, stable and long-term peace and order.
By carrying out "love activities" and implementing "safety projects", we conscientiously carry out "eight love activities" in the safety production work of the entire institute, implement "three creative tasks", realize "three safety projects", and guide employees to cultivate " "Love concept" and "safety concept", cultivate "love culture" and "safety culture", laying a good foundation for fully completing the safety production tasks in XX and achieving the annual safety production goals. Thermal Power Plant Work Summary 4
Since the beginning of the year, our company has continued to actively carry out various safety management tasks. The company's safety production work has been continuously improved to ensure safe and stable production. The special report is as follows.
1. Overall situation
1. Completion of safety indicators
2. Vigorous rectification using "safety evaluation" and NOSA safety, health and environmental system as means We have comprehensively strengthened the rectification of hidden dangers in production equipment and facilities to eliminate potential safety hazards and improve the health of the equipment.
3. Continuously improve operation management, strengthen operational skills training for operators, improve personnel operation levels, and reduce human-made unsafe risks.
Through the above efforts, the company's safety situation was basically stable throughout the year, with no accidents of any kind. Compared with 20xx, the first and second type obstacles were reduced, and some key on-site hidden dangers were rectified.
2. Work deployment and effective practices
1. The company’s leaders attach great importance to safety management and personally deploy various safety production tasks, taking into account the company’s weak links in safety production and Highlighting problems and putting forward clear requirements, and taking the lead by example, not only used various occasions to promote and implement safety ideas, but also took the lead in organizing and participating in on-site safety inspections, fully playing an exemplary role.
2. Starting from the safety awareness of employees, implement safety education and training for all employees.
During the B-level maintenance of the two units from March to June, safety training and examinations and on-site safety briefings were conducted for all construction units and special operations personnel. At the same time, the annual safety inspection for all employees was completed from March to April. It conducts regular examinations, examinations for "three types of people" on job tickets, approval and identification of personnel for special types of work, and conducts multiple safety examinations for maintenance units.
The company website has a safety column, continues to upload a large amount of safety production materials, and organizes various departments and employees to carry out learning. Use company bulletin boards, banners, slogans, the Internet, production of brochures and other means to vigorously promote safety production knowledge, accident prevention methods and self-protection related knowledge. For example: for the B-level maintenance of the unit, design and produce maintenance safety knowledge publicity boards, and organize employees of each maintenance unit to watch construction safety videos. In June, we organized and carried out the "Safety Production Month" activities, designed and produced safety month publicity columns, carried out in-depth safety publicity and training, and organized more than 100 people to participate in the "Safety Month" knowledge competition.
The company has strengthened the requirements for regular safety activities for teams in various departments, and created employee safety training and education files, "one file per person." Designed and produced safety production brochures and distributed them to every employee. Through training and promotion of the NOSA safety, health and environmental system, we have continuously enhanced the safety awareness and professional skills of the staff, and strived to reduce the hidden dangers of various man-made accidents. to minimum.
In June, with the theme of "Safety Responsibility lies in Implementation", our company organized a safety production essay collection activity, and also organized to participate in the National Electric Power Safety Production Network Knowledge Competition organized by the State Electricity Regulatory Commission's Safety Supervision Bureau. Activity. As of June 30, ***18 people had participated in the essay writing activity and 81 people had participated in the online knowledge competition. Among them, the person with the highest score reached 9356 points, and the top 5 people all scored more than 6000 points.
3. Strengthen the basic management of production safety and build a long-term mechanism for production safety. Company leaders attach great importance to production safety and personally take charge of production safety work. They have publicized and promoted new concepts, methods and models of production safety management on many occasions.
The company insists on carrying out regular safety activities such as monthly safety analysis meetings. At the meetings, each department actively prepares detailed information in the form of PPT, carefully analyzes, evaluates, and summarizes the shortcomings in the safety production work of the previous month, making the safety production work form a A good atmosphere promotes the continuous progress of safety production work. The safety supervisor has strengthened the management of basic safety work and inspected the safety learning status of various departments and teams. The company has organized dozens of safety and technical training and examinations for maintenance units throughout the year.
4. Revise and improve various safety management systems and regulations, and improve the staffing of the three-level safety network. The company issued a "two systems" notice at the beginning of the year, clarifying the safety responsibilities of production personnel at all levels. The company, departments and teams, teams and individuals all sign responsibility certificates at all levels, so that every grassroots manager and staff understand the safety responsibilities they bear. At the same time, combined with NOSA and safety assessment work, the company has formulated and improved hundreds of various standards, systems and emergency plans, improved the safety committee structure, and established a safety, health and environment committee, effectively enhancing safety production organizational strength and institutional foundation.
5. Revise various emergency plans, conduct emergency plan drills, and continuously improve the power emergency management system. Our company has basically completed the revision of the comprehensive emergency plan, special emergency plan and on-site disposal plan. According to the plan, inspections of personnel, materials and other aspects were carried out, and a fire emergency drill was carried out in late October.
6. Increase daily safety supervision and assessment, strictly implement various safety production rules and regulations with "two votes and three systems" and anti-violation as the main content, and increase "anti-violation" work in an all-round way Strengthen the efforts to crack down on on-site violations, effectively punish unsafe behaviors, and play a good role in warning and crackdown. The company formulated the "Anti-violation Implementation Rules" and made it into a small manual and distributed it to every employee and outsourcing unit personnel. At the same time, it established three-level anti-violation files at the company, department, and team levels, and strengthened the anti-violation publicity.
This year, the company’s unit maintenance has been frequent and time-consuming. Safety supervisors and managers from various departments conduct safety and civilized construction inspections at the maintenance site every day, and take the unit maintenance as an opportunity to focus on the safety education, training and qualification review of external inspection teams, and severely crack down on and promptly correct on-site violations and violations. Uncivilized construction conditions, and more than ten special safety inspections on scaffolding, construction electricity, container construction, fire prevention, high altitude, lifting, etc. were organized according to the progress and stages of maintenance, and safety and civilized construction assessments were issued throughout the year More than 50 orders and more than 40 safety inspection reports were issued. During the nearly five-month maintenance process throughout the year, no personal injury or equipment damage accident occurred.
7. Take the safety assessment and NOSA work as an opportunity to actively carry out equipment rectification work and promote the improvement of on-site equipment safety level.
1) Attach great importance to safety assessment rectification, formulate rectification plans, break down tasks one by one, identify responsible persons, and supervise and determine the closed loop of rectification projects.
2) Actively promote NOSA work. The company has formulated an overall promotion and implementation plan, and currently has developed more than 40 management standards for various elements and is constantly increasing. According to the overall implementation plan, work plans are formulated every month and implemented as planned. The work intensity has been continuously strengthened and results have been achieved.
3) This year the company invested heavily in replacing the inner cylinders of the two boiler chimneys from carbon steel plus glass bricks to titanium steel composite plate inner cylinders, which greatly enhanced the corrosion resistance and eliminated the company's problem The biggest hidden danger. At the same time, taking the C-level maintenance of #1 unit as an opportunity, we comprehensively strengthened the rectification of hidden dangers in production equipment and on-site facilities, with special emphasis on in-depth investigation and analysis of the long-standing vibration problem of #1 generator unit, and found that the major thermal deformation of the rotor Therefore, we did not hesitate to extend the maintenance time and return to the factory for maintenance. After unit #1 was started in June, the operating conditions were stable and good, and this major hidden danger was completely eliminated. At the same time, this year we have also carried out the treatment of serious hidden dangers such as the treatment of hydrogen leakage in Unit #1, the transformation of line lightning protection, the elimination of leakage in the pulverizing system, the addition of railway overpasses, and the transformation of the oil depot hydrogen station wall. At present, all the work has been completed.
8. In terms of operation management, improve and long-term implement a series of effective measures to ensure the safe operation of the unit. For example, safety measures have been formulated for single-machine and single-line operation, safety measures for low-load operation, and preventive measures for boiler MFT caused by poor coal quality. At the same time, timely boiler combustion adjustment tests are conducted according to changes in coal types, which improves the stability and economy of boiler combustion. At the same time, we have formulated safety measures such as flood prevention, high temperature prevention, and lightning protection based on seasonal characteristics, and regularly carry out hazard source and danger point analysis, actively carry out safety technology learning, and carry out an accident prediction for each class to form a good Safety atmosphere to achieve safe and controllable supervision of operating units.
9. Go all out to investigate and rectify hidden dangers, carry out monitoring of major hazard sources and management of safety risks, and regularly carry out seasonal and holiday safety inspections. Our company will investigate and establish major hazard sources, formulate targeted emergency plans, and regularly inspect hazard sources. Throughout the year, the company organized multiple seasonal safety inspections such as spring, peak summer, National Day, autumn, winter and safety inspections during the two festivals. At the same time, it also carried out safety inspections before holidays and major events such as the Spring Festival, National Day, and the Shenzhen Universiade. Special inspection. In addition, the company implements a weekly safety inspection system, divides the entire factory into areas, formulates inspection specifications, and organizes various departments to carry out safety inspections every weekend. At the same time, safety supervisors and professional technicians conduct on-site safety inspections every day. Strict and meticulous work effectively guarantees the safety of people. and equipment safety.
10. Strengthen fire protection, security, transportation, and food safety management to create a harmonious and safe company environment. The company strengthens the coordination, supervision and assessment of public security and other aspects of work, focusing on the implementation of the guard duty system and on-site patrol system. It conducts spot checks on various positions from time to time every day, and intensifies the inspection of incoming and outgoing items. Detected and prevented theft by outsiders, reducing losses for the company. ;
- Previous article:Brief introduction of Super 8 Hotel in Longcheng, Beijing
- Next article:National Day custom furniture activity banner slogan?
- Related articles
- Inspirational sentences of blackboard newspaper
- Lamps import customs declaration brand
- Common causes and preventive measures of tower crane collapse accidents
- Eight words of civilized campus slogan
- It is known that people with normal vision can read distant characters with a visual angle of not less than 5'( 1), and find the size of readable characters at a distance of 10m; (2) If you want to se
- Promote the content of hand-copied newspapers to write standardized characters in Mandarin to fourth grade
- What do the different versions of Kamen Rider say?
- What's the reputation of Huangshan Mountain?
- Slogans of scenic spots in protected areas
- Fewer environmental slogans