Decoration company construction site image standards

Construction site image standards

1. Before each construction site starts, you must go to the engineering department manager to collect the unified form of construction site image materials. After filling in the form, it will be unified in the material room after approval by the engineering department manager. Receive all construction site image materials. Otherwise, the construction site will not be started. No one may violate it. Violators will be fined three times the price of materials at the construction site.

2. Place the assembled sign boards in a conspicuous position in the living room (where you can see them when standing at the entrance).

3. Place the toolbox directly under the image board, place the fire extinguisher on the brackets on both sides of the rear, and hang the file bag containing the quality record book and engineering log on the hook on the upper right side. The watering can and broom are placed behind the tool box. The feather duster hangs from a hook above the left side.

4. Avoid stacking any items on the image stand and tool box, and keep them clean for a long time.

5. It must be assembled and placed neatly within two days of entering the site.

6. The name of the construction site, photos, names, etc. on the image board must be complete:

① All photos must be in work clothes.

② The photo size is 70*50mm and is plasticized.

③ Uniformly use Song Dynasty size 48 font.

7. Warning signs should be posted at a position 1600mm above the ground, and should not be posted indiscriminately without correct text or title.

8. All materials such as project logs, renderings, drawings, project inspection records, etc. must be hung on the image board and must be complete, complete, and well-recorded.

9. Temporary power distribution boxes (pans), woodworking saws, herringbone stairs, and temporary sanitary appliances must be of the same style and specification.

10. All kinds of signs, promotional materials, posted calligraphy and paintings, slogans, etc. at the construction site will be formulated and collected by the company.

B. Construction site protection standards:

1. Elevator room protection standards:

① Pearl cotton.

② The company's unified numbered protective film is printed with the words "Samsung Decoration".

③ Sealing tape. (Those with the company logo will be provided by the company)

2. Ground protection requirements:

① Use fiberboard to lay the bottom layer, use woven protective film to pave the surface, and use the shade against the wall. Reserve 50mm at the corners for easy fixing with sealing tape.

② The top of the font of "Samsung Decoration" is facing the direction of the entrance door constructed by our company.

③ The interface and surrounding area of ??the protective film must be fixed with sealing tape.

④ The paving should be neat, flat and firm.

3. Requirements for wall protection:

① The height of wall protection is 1300mm (±10mm), and 50mm is reserved at the inner corner of the wall to facilitate fixation with sealing tape .

② Place the font of "Samsung Decoration" facing up and secure it firmly with sealing tape.

③ The interface and surrounding area of ??the protective film must be fixed with sealing tape.

④ The paving should be neat, flat and firm.

4. Five-line system promotion: green space, yellow wall, blue waterproofing (visual)