Joke Collection Website - News headlines - May Safety Work Summary

May Safety Work Summary

Summary of safety work in May, 222 (6 general articles)

The time was unconscious, and we realized that the hard work had come to an end. Looking back on the work since this time, we have gained a lot. It is time to sum up the past achievements in the work summary. How should we write a work summary? The following is my summary of safety work in May 222 (6 general articles), hoping to help you.

summary of safety work in may 1

in may, the safety work of our squadron was mainly carried out according to the work and key points and accident prediction measures. First of all, we have done a good job in various safety work during the May Day holiday. Although the holiday lasts for three days, through the concerted efforts of all drivers, violations and accidents have been put an end to, ensuring safe driving and the needs of front-line production users. During the holiday season, we will strictly implement the strengthening measures during the holiday season, conscientiously implement various safety management systems, * * * count 77 trips and 19 stops, and earnestly manage the "three deliveries and one letter" for the stopped vehicles. Squadron duty cadres are seriously responsible for the inspection of daily vehicle operation and vehicles returning to the field at night, eliminating hidden dangers in time, so that the safety work during the festival is truly implemented, and at the same time, a heart-receiving meeting is held in time after the festival, so that drivers who take long vacations can recover their wandering hearts as soon as possible, enhance their safety awareness and put them into normal work tracks with peace of mind. After the holiday, the safety leading group of our squadron mainly does the following work:

1. Seriously organize all the staff to implement the notice of "On Further Strengthening Safety Work" forwarded by the Environmental Protection Department of Oil Company to the General Office of the State Council, and attack Comrade Liao Yongyuan's speech on safety and environmental protection in the second quarter and forward the Notice of 3.26 Lifting Injury Accident of Chuanqing Drilling Engineering Company. We timely organize drivers to learn and understand the spirit and discuss, analyze the cause of the accident, and combine their own hidden accidents in daily driving, draw lessons from the accident, and understand that accidents are caused by violations. Only by putting an end to illegal driving can we ensure safe driving.

2. Seriously organize and study the notice on traffic safety in summer (rainy season and flood season) and the training materials on education materials and preventive measures issued by Shu 'an Safety Committee. In view of the road traffic characteristics and accident prediction in rainy season, we focus on the training of "Ten Preventions" in rainy season and emergency plans for traffic accidents in rainy season. All drivers are educated 1% and answered 1% safely, which improves the safety of drivers in special environments. At the same time, each employee writes down the rainy season and no outdoor bathing.

3. Actively carry out the propaganda and mobilization work of "Safety Production Month" activities, conscientiously organize and study the notice of oil companies and factories on carrying out the seventh safety production month of 2xx and the work arrangement of the transportation brigade to carry out the "Safety Production Month" activities accordingly. Our safety committee has also set up an activity leading group, focusing on "managing hidden dangers and preventing them" on the basis of singing the main theme of "safety development" and promoting "hidden danger management year". Vigorously create the atmosphere of "paying attention to safety and caring for life" for all employees, talk about the importance of safety and the construction of safety culture in combination with the "Safety Production Month" activities, and improve the safety awareness of all employees. It is necessary to change the profound meaning of "I want to be safe" into "I want to be safe", clarify everyone's responsibility and the importance of safe driving, eliminate the hidden dangers of accidents, and really pay attention to safety. Everyone has established a safety barrier.

Fourth, in view of the weather change in May, the temperature is more suitable, not hot or cold, and people's thoughts are more active, which is easy to cause drivers to drive illegally. In view of this hidden danger, we increased the intensity of road inspection in combination with Brigade No.5 Road, including 18 road inspections, 8 random stops, 93 vehicles, and 3 illegal drivers, mainly due to speeding and the co-pilot not wearing seat belts.

5. In the rainy season and flood season, the inspection of vehicles leaving the scene and the implementation of case protection work have been intensified, and at the same time, the performance inspection of drivers' vehicles has been well supervised. This month, 31 vehicles have been inspected and 3 problems have been found, all of which have been rectified and solved in time to eliminate the signs of accidents in time. Summary of safety work in May 2

Since May, our school has carried out the "Legal Safety Publicity Month" in an all-round way in order to fully implement the deployment of disaster prevention and mitigation work by superior leaders, publicize and popularize the rule of law and safety knowledge to teachers and students, and improve their legal literacy and awareness of disaster prevention and mitigation. Through the series of activities of Safety Month, a safe working and learning environment has been created for teachers and students, which has created conditions for the steady improvement of the quality of education and teaching. The work of this month is summarized as follows:

1. Work implementation.

1. Strengthen the guard work of the school, and strictly implement the registration system for foreign personnel.

2. Further strengthen the safety and legal education for students and improve their safety and legal awareness.

3. Strengthen the morning and afternoon inspection of students.

4. Strengthen the disinfection and ventilation of the classroom, and make disinfection records.

5. If a suspected case is found, follow it up. When a confirmed case is found, it should be reported in time according to the procedure. Late reporting, concealment and omission.

6. Carry out "Publicity Week on Disaster Prevention and Mitigation" around "Disaster Prevention and Mitigation Day".

second, specific measures.

1. On May 6th, our school held a special conference on the prevention and control of human infection with avian influenza, and arranged relevant requirements for preventing hand, foot and mouth disease for class teachers. It is required to strengthen the morning and afternoon examination of students, strengthen the disinfection and ventilation of classrooms, make disinfection records and find suspected cases, and do a good job of tracking. When a confirmed case is found, it should be reported in time according to the procedure. No delay, concealment or omission.

2. On May 7th, our school conducted a rigorous search of all classes in the classrooms in the school and found no controlled knives.

3. May 7th to May 13th is the Publicity Week of Disaster Prevention and Mitigation. According to the requirements of our superiors, our school has a knowledge education course on disaster prevention and reduction. Combined with safety education courses, carry out targeted education on lightning protection, flood control and drowning prevention, and publicize knowledge of disaster prevention and mitigation; A publicity column was published to publicize and popularize the relevant laws and regulations on disaster prevention and mitigation and the basic knowledge of disaster prevention and avoidance, self-help and mutual rescue.

4. drowning prevention education. According to the change of seasons, the school has formulated powerful measures to provide students with safety education with foresight. It is forbidden for students to swim by the river without authorization to prevent drowning accidents. After regular education, students strictly abide by the rules and regulations of the school.

The responsibility is more important than Mount Tai. Our school will further strengthen the safety work, check and fill the gaps, do a good job in safety work and serve the teaching well. Summary of safety work in May March

May has arrived, the temperature is gradually rising, and it will enter the stage where students are prone to drowning accidents. Therefore, preventing students from drowning has become the top priority of school safety work. In order to implement the documents and meeting spirit of the higher authorities on preventing students from drowning and do a good job in our school's overall drowning prevention work, in April, our school made full use of our school's publicity resources, adopted various forms, and used some drowning accident cases and videos to regularly educate students on drowning prevention safety warning at different times and in different weather conditions.

1. A special action leading group for preventing students from drowning, headed by the principal, was set up, and a meeting on the safety of preventing students from drowning was held.

2. Before the school starts, the dangerous waters around the school should be mopped up, and the local government and relevant departments should be asked to take measures to solve the surrounding dangerous waters and eliminate hidden dangers.

3. Before April 15th, the Letter to the Parents of Primary and Secondary School Students in China issued by the Ministry of Education will be distributed to each student's parents, so that they can read it carefully, sign it and collect the receipt, which will be properly kept by a special person.

4. Conduct drowning prevention education once every two weeks. Make use of the publicity resources of our school, and adopt various forms such as school meeting, speech under the national flag, theme class meeting, blackboard newspaper, publicity column, electronic screen, centralized signature and hanging on banners to educate students on drowning prevention safety warning.

5. Implement daily safety management. Conscientiously implement the system of "three inspections" (morning inspection, class inspection and afternoon inspection) in primary schools and inquire about students who are absent for some reason; Strengthen the management of students going out, and strictly do a good job in verifying and registering students who leave campus during normal teaching and management periods and contacting their parents.

6. Implement the "Daily Broadcast of Safety Reminder Education for Primary and Secondary School Students in Jiangxi Province" by the Ministry of Provincial Affairs; Strengthen the safety reminders for students, especially those passing through dangerous waters, and implement the "two five-minute reminders" of the provincial offices (the last five minutes of the last class in the morning and afternoon).

Through the above targeted activities, the teachers and students in our school have a deeper understanding of drowning prevention, and at the same time, they have enhanced their safety awareness and their abilities of self-prevention, self-protection and self-rescue. Summary of safety work in May April

Since May, the key office has carried out safety inspection in key traffic projects in accordance with the spirit of Notice on Quickly Carrying out Safety InspectionNo. 2XX25 issued by Danjiangkou and in combination with the requirements for establishing a "safe construction site". The summary is as follows:

1. After receiving the notice, our office quickly conveyed the spirit of the Notice to various supervision teams and project departments and arranged various units.

second, the supervision unit earnestly performs the duties of supervision safety supervision, and organizes the supervisors and safety officers of the construction unit to conduct a comprehensive inspection of the projects under construction.

3. Our office organized relevant personnel from the Engineering Department and the Quality Supervision Station to inspect the construction of four road construction lines: asphalt paving in front of the station, the earthwork bridge in Qiliang Road, Dangui Road and the freight yard road, and found many problems.

The laying of temporary power cables on the bridge construction site of Qiliang Road is not standardized, and there is a lot of dust in earthwork construction, so there is no sprinkling to reduce dust, and the temporary access road is not repaired in time, and the rut is deep, which affects the traffic of construction vehicles and has potential safety hazards.

warning signs were not set up in the rain and sewage open caisson construction of Dangui Road, and the warning signs of grade crossing were damaged by vehicles, which were not replaced in time. The mechanical operation of subgrade earthwork construction was not commanded by special personnel, and the construction was random and the management was not in place. Bridge column construction personnel do not wear safety helmet or safety belt when working at high altitude.

The freight yard road has similar problems with Dangui Road during the construction of bridge columns. In addition, the isolation measures of the old road are simple, especially the temporary road setting is unreasonable, the road is narrow and uneven, and the height difference is large, which has potential safety hazards. On May 15th, the Key Office, together with the Safety Section, conducted a special inspection on all bridges of three BT projects. At present, there is no deep foundation pit and support construction, and the inspection is in good condition.

The construction unit has made serious rectification for the problems found above, and made a reply on the electronic account. We hope that the problems found will not be repeated in the future construction process. After the same problems are rectified, we can find them again in the inspection. We should increase the punishment in the future inspection, so that the construction unit can truly standardize the safety production work.

fourth, on the afternoon of 28th of this month, in the project department of freight yard road, the transportation bureau and the key office reviewed the installation scheme of the bridge box girder across the railway of freight yard road, and obtained the certification from the aspects of preliminary preparation, construction technology scheme, personnel organization, mechanical equipment, hazard source control and construction safety protection, etc. At present, 9 trials have been carried out and achieved success. May Safety Work Summary May

In May, our unit closely focused on the requirements and deployment of the first stage of the mine electromechanical safety special treatment action, and carried out the work in two centers, namely, the quality standardization construction of electromechanical equipment and the quality standardization inspection of electromechanical specialty at higher level. Combined with the actual work, the newly assigned employees are trained by teachers and apprentices, and the on-site equipment is rusted and dehumidified. Under the guidance of leaders and professionals in the electromechanical office, our unit actively participated in the on-site inspection meeting of electromechanical safety special governance organized by the mine and the business knowledge training course for electromechanical practitioners, and accepted the inspection. Now, we will summarize the battle activities of the special management of electromechanical safety in May as follows:

1. Go deep into the site and pay close attention to the quality standardization construction of electromechanical equipment

In order to consolidate the achievements of the first phase of the "special management action of electromechanical safety", the district team, in combination with the actual situation on the site, arranged skilled personnel to conduct mutual inspection and notification of the charter equipment while improving the charter system, and at the same time formulated rectification measures and time within a time limit. In view of a series of management regulations issued by the mine, the competent leaders of the district team and the technicians in charge arranged and deployed to ensure that the equipment and grounding devices on our site fully meet the requirements of the mine and its superiors. At the same time, the leaders of the district team and the leaders in charge will timely report the purpose and significance of the electromechanical safety special treatment activities, the inspection contents and problems in the second stage to the staff and comrades of the whole team through the bulletin board in the duty room, the safety meeting of the team headquarters and the pre-shift meeting, so that we can have a clear aim at finding the difference in the bid. ; With the opportunity of the on-site observation meeting of electromechanical analytic inspection in 2315 working face, the quality standardization rectification of electromechanical equipment with full coverage was carried out in the 1132 track managed by our unit.

Second, strengthen study and standardize operation

Lead the staff of the whole team to seriously study the No.122 document of the Group Company and No.59 document of Kuangfa, and lead the mechanical and electrical maintenance personnel and post drivers to carry out training on practical operation and operation specifications on the spot. Ensure that our unit reaches a high level in the accuracy and standardization of implementing the requirements of superiors. Re-study the management system of mechanical and electrical equipment handover, the management regulations of mechanical and electrical equipment charterers and the working rules of mechanical and electrical workers, and carefully study the explosion-proof standards of electrical equipment, the implementation rules of work card operation tickets and the integrity standards of grounding devices issued by the mine. At the same time, the mechanical and electrical equipment intact standard and the red and yellow card standard will be printed and distributed to ensure that one copy will be sent to the site for construction inspection to ensure the construction quality. Under the strict requirements of the mine and the excellent management of the district team, the workers have improved their working standards.

Third, do a solid job and do a good job in the anti-corrosion and moisture removal of electrical equipment

Facing the coming hot and humid summer, our unit actively responded to the call of the Mine and Electromechanical Office to do a thorough and meticulous job in the anti-corrosion and moisture removal of electrical equipment in summer. Because the outer belt of the 1132 working face managed by our unit is located in the return air lane, the high temperature and humidity bring us a great workload in moisture removal. Due to the tight time and heavy tasks, we promptly transferred the electromechanical maintenance personnel who simulated roadway construction to work. From an illuminating lamp, an emergency stop switch to the drive motor of the belt, the combined switch is thoroughly inspected to release moisture remover, and the explosion-proof surface is coated with vaseline for rust prevention. The frequency of temperature measurement and inspection of cables, junction boxes and cold patch joints of lighting lamps along the line is increased, which ensures the zero failure operation of the equipment and makes full preparations for the safe operation of the equipment.

while doing a good job in the maintenance of mechanical and electrical equipment, we actively implement the talent training strategy of bringing the old with the new, and arrange the maintenance class personnel to change jobs and rotate, so that they can brainstorm, learn and exercise in different positions, and achieve multi-skills. I believe that under the guidance of the electromechanical office