Introduction of retaining wall construction technology?
Through combing the relevant contents, Zhong Da Consulting Company has specified the following contents of retaining wall construction technology:
The main construction technology of retaining wall includes: stone requirements, cementing material requirements, masonry requirements, masonry methods and other related contents, among which the masonry requirements for construction enterprises are as follows:
(1) Before the compressive strength of masonry reaches 2.5Mpa, the upper masonry shall not be prepared.
(2) masonry mortar masonry method must be adopted. When laying, stones should be laid in layers, staggered up and down, and laid inside and outside. The joint width of masonry shall meet the requirements in the following table:
Grading joint (cm)
Strip stone
Mortar masonry flat joint 1.5 ~ 22 ~ 2.5
Vertical joint 2 ~ 3 2 ~ 4
(3) Before paving, the stone should be wetted with water to make its surface fully absorb water, but no residual water is allowed. The exposed surface of masonry shall be maintained within 12 to 18 hours after masonry. Before continuing masonry, the floating ballast on the surface of masonry should be removed before masonry.
(4) When building cement mortar masonry, the masonry should face downwards, and shake or knock it properly to make it stable; It is forbidden to stick stones without slurry. After filling mortar, insert it with flat iron and tamp it until the surface is full of slurry. Within the same masonry layer, adjacent stones should be laid in staggered joints, and there should be no straight joints downstream. Adjacent paving stones should also be staggered and overlapped to avoid vertical straight joints. When necessary, the Shi Ding can be erected regularly.
(5) Wet stone shall not be used in rainy day construction, so as to avoid mortar flowing affecting masonry quality and protect the surface. If there is no canopy and the rainfall is more than 5 mm, the masonry operation should be stopped.
For more information about writing bidding documents and improving the winning rate, please click on the customer service at the bottom for free consultation.
- Related articles
- Help me think of a slogan for the pre-class meeting. There are four shifts and three shifts in our company. After three shifts, he shouldered two production lines and asked for slogans before the clas
- Quzhou bureau of public security internal organization
- Where can I get the Shanghai Hong Kong and Macao Pass?
- Can Xuanwei order takeout during the current epidemic?
- Slogans about sports games
- The first volume of Chinese eighth grade "Biological Invaders" teaching plan
- Time is like a song, the third day of composing music.
- Is Foxconn tired at work?
- Chen Haonan college entrance examination refueling Tibetan poems 150 rhymes poetically.
- The tragic scene of Mourinho leading his crutch team to win the Europa League is still vivid in my mind, and Manchester United fans looked down upon it with cold eyes.