# Report # Introduction Time flies, and the hard work has come to an end. Looking back at the achievements and shortcomings of the work since this time, it is very necessary to write a self-inspection report. The following is an unorganized self-inspection report on water conservancy safety production. Welcome to read it!

1. Self-inspection report on water conservancy safety production

Since the personnel entered the site, they have always attached great importance to safety work while constantly improving the construction of the project department. After receiving the notice from the quality supervision station about carrying out the self-examination and self-correction of safety production, the project department quickly organized relevant personnel to carry out a comprehensive and specific self-examination and self-correction of safety production within the jurisdiction of the project department's headquarters and blocks. Combining with the actual situation of our bid project, we focused on the key points, conscientiously implemented the spirit of the document, carefully arranged the deployment, and formulated the implementation plan. Now the self-examination situation is summarized as follows.

1. The self-examination time

starts on December 23rd and ends on December 28th of 2xx.

II. Self-inspection method

The project department will arrange the deployment in a unified way, organize relevant personnel of the project department to hold a meeting on self-inspection and self-correction of production safety, formulate a responsibility distribution table for self-inspection and self-correction of production safety, and arrange for it to be implemented by people. The responsible person will inspect the production safety within his own responsibility, and then report the self-inspection to the safety and quality department of the project department. The safety inspector general will summarize and sort it out in time according to the situation reported by the responsible person, and formulate safety prevention and rectification measures.

III. Scope and Content of Self-inspection

The scope of self-inspection mainly includes three parts: safety production of water conservancy projects, publicity and education, improvement of emergency mechanism, and smooth reporting of safety production information.

1. Safety production of water conservancy projects. Conduct a comprehensive safety inspection of the project department's residence. The project department's residence has been equipped with enough fire hydrants and improved escape routes. Comprehensively investigate the safety hazards within the jurisdiction of construction, eliminate them in time, and establish an account for the investigation and management of safety hazards, so as to minimize the risks of construction safety production and ensure the smooth progress of engineering production. Equipped with sufficient safety production equipment, it is forbidden for other people to enter the construction scope, and personnel entering the construction scope must wear safety helmets.

2, publicity and education and improve the emergency mechanism. Conduct safety training and education for new players, and only after passing the examination can they take up their posts. Intensify safety publicity, and carry out publicity and education by distributing leaflets, hanging banners, broadcasting publicity, training, etc., so that the concept of safety first can be deeply rooted in the hearts of every participant. Improve all kinds of emergency mechanisms, formulate safety guarantee measures for various projects such as cold prevention, anti-skid, wind prevention, fire prevention and fog prevention, and carry out emergency drills such as fire prevention and food poisoning prevention to ensure safe production and personal safety. The Project Department and each construction shift shall thoroughly inspect and maintain the vehicles and motorcycles used. It is forbidden to have sick or dangerous vehicles, and it is forbidden for drivers to drive under the influence of alcohol and fatigue, so as to drive safely.

3. Strengthen emergency duty to ensure smooth information. Establish a safety inspection patrol system, strengthen the safety production duty system, improve the safety accident information reporting channels, and ensure the smooth flow of information. In case of any production safety accident or emergency, the personnel on duty must stand by during working hours, report the situation to the higher authorities truthfully, organize emergency rescue and after-care work in time, and minimize accident losses and social impact.

IV. Existing problems

In the process of self-inspection activities, the specific problems that can be solved should be solved immediately, and those that need to be studied and decided should be worked together to ensure safety. However, there is still a problem that employees' safety consciousness is not strong. Individual employees do not pay enough attention to safety, their thoughts are confused, their safety awareness is weak, they ignore safety precautions, protective facilities and equipment, and treat safety perfunctory.

v. rectification measures

The above problems are influenced by objective factors, but the main reason is that the work responsibility is not true, resulting in passive work. In view of the existing problems, it is mainly to strictly implement the safety responsibility system. According to the investigation, all units shall assign special personnel to be on duty when the responsibility for safety work is fulfilled to people and key positions, strictly abide by the off-duty system, strengthen the management of succession, and make a good record of duty. To ensure safety from top to bottom, everyone has a burden.

in short, in the future work, we will strictly follow the relevant requirements of our superiors and make concerted efforts to ensure the safe operation of all work. We will earnestly learn from the experience and education in previous work, sum up the laws, improve measures, guard against arrogance and rashness, and do a good job in water conservancy safety production as always.

2. Self-inspection report on water conservancy safety production

In May, the flood season entered. In order to publicize the national safety production principles and policies, popularize safety knowledge and improve the safety quality of the whole people, according to the spirit of the document Notice of Bishan County Water Conservancy and Agricultural Machinery Bureau on Launching 2XX Safety Production Month (Bishui Jifa [2XX]32) and combining with the actual situation of our town, the "Safety Production Month" was launched.

1. Establish a leading group for "Safe Production Month"

Establish a leading group for this "Safe Production Month" activity, with the vice mayor in charge of agriculture as the leader and the water conservancy personnel in charge of the Agricultural Technology Center as the members. And led by the Agricultural Technology Center, with the cooperation of water stations, water management units and agricultural machinery stations, they are responsible for the "Safe Production Month" activities of their own units.

2. Do a good job in publicity activities

1. With the theme of "abiding by the rules and laws, caring for life", a meeting was held for the heads of relevant departments who participated in the "Safe Production Month" activity, and a plan was put forward for the development of this activity to ensure the smooth implementation of this "Safe Production Month" activity.

2. In view of this activity, the town government arranged a publicity fund of 8, yuan; Hanging 5 slogans; Do 5 column boards; Held two meetings with more than 4 participants; 28 people participated in the publicity, including 12 leaders; Carry out a large-scale publicity and consultation activity about this activity, with 2,2 participants; Write a special report on this "Safety Production Month" activity.

Third, carry out a safety inspection activity

A safety inspection was carried out for the water conservancy facilities in the town, such as reservoirs, Shanpingtang, Shiheyan, irrigation station and canals, to find out the potential safety hazards and eliminate the existing unsafe factors to ensure the safety in flood season.

The dalu town Municipal People's Government carefully planned and organized this "Safety Production Month" activity, especially strengthened the study and publicity of safety production laws and regulations. Fully implement the safety production rules and regulations of the unit, timely investigate potential safety hazards, and implement the 24-hour duty system in flood season to ensure that no safety accidents occur in flood season.

3. Self-inspection report on water conservancy safety production

In order to conscientiously implement the spirit of the water conservancy work conference on March 6, 2XX, our township timely arranged village and group cadres to conduct a comprehensive safety hazard inspection on water conservancy projects within the jurisdiction of each village, and now the specific inspection situation is reported as follows.

1. Human drinking project:

1. The cadres of the brand-new village group conducted a comprehensive inspection of the water sources, reservoirs and pipe networks of the human drinking project in their jurisdiction. After investigation, it was found that the drinking water pipeline was damaged and leaked, and the village Committee organized personnel to replace the damaged pipeline in time. At the same time, the reservoir was cleaned to ensure safe water use. Up to now, it is running normally.

2. The water source of Village 1 is Maoxiangping, a brand-new village. Because the former water supply project diverted water from the upper reaches of Maoxiangping, the amount of water decreased, which made it difficult for 258 people in Village 1 to drink water. Now it is urgent to find another water source to replenish water, which cannot be implemented due to lack of funds. We hope the higher authorities will give us financial support.

3. The pipeline of Daping Village Drinking Water Project is damaged after inspection, and the cadres of the village committee have organized personnel replacement, which has been running normally so far.

4. The drinking water pipes in villages are seriously aging. At present, the mountain drinking water project in villages is being implemented, and all the aging steel pipes will be replaced. The human drinking project is running normally. In addition, Haizi drinking water project in Qianyu Township involves solving the drinking water problem of more than 9 people in the village, but at present, due to design problems, this project cannot solve the drinking water problem of villagers in groups 2, 4, 5 and 6 of villages and villagers in new village settlements.

Second, weir way:

1. Re-weir in the village draws water from Baihegou. Because Daling Township draws water from the upper reaches of Baihegou, the water consumption in Baihegou is reduced. At the same time, because the re-weir is an earth weir, it has serious infiltration. In the dry season, there is basically no water at the tail of the weir, which seriously affects the irrigation water (water for farmland and fruit trees). At present, a new water source (red mercury) has been found, and water is diverted from red mercury to Baihegou by pipeline to replenish water. At the same time, the three-sided light regulation of the weir can not be implemented because of the shortage of funds, so we hope the higher authorities will give financial support.

2. There are water leaks in the weirs of Happiness Weir, Middle Weir and Lower Weir in Quanxin Village, which need three-sided light seepage control.

3. There were five collapses in the village, and the village cadres organized personnel to repair and rectify them in time. Up to now, the water supply is normal.

4. Self-inspection report on water conservancy safety production

In order to further do a good job in flood control, ensure the safety of flood season, protect the lives and property of people in our town, maintain normal production order and maintain social stability. According to the meeting spirit of Chongqing Flood Control and Drought Relief Headquarters and the requirements of Bixun [2xx] No.3 document, from March 2th to April 1st, our town, headed by Mayor Zhou Liang himself, formed a pre-flood safety inspection team, which carried out a large-scale inspection on the current situation of water conservancy projects, river barrier-building, emergency materials management, reservoir operation and river-related construction projects within the jurisdiction of dalu town, and registered the hidden dangers and phenomena found, and put forward a list.

First, firmly established the idea of preventing floods and saving disasters

Due to the floods in recent years, it has caused great economic losses to our town. Therefore, we have established the idea of people-oriented, building a harmonious society and ensuring the safety of one party, and done a solid job in flood control this year.

II. Strengthening leadership and fulfilling responsibilities

According to the requirements of the document, our town has established a leading group for flood control and drought relief, with the mayor as the leader, the deputy mayor and the deputy secretary of agriculture as the deputy leader, and the relevant personnel of the Agricultural Office and the Agricultural Service Center as members, responsible for flood control and flood control of important reservoirs, Shanpingtang, Shiheyan and dangerous sections of rivers within its jurisdiction, and responsible for supervising and implementing the relevant units to formulate flood control plans and establish water conservancy projects.

Third, implement the duty system in flood season

During the flood season from May 1 to September 3, our town implemented the duty personnel for flood control and drought relief, and defined the responsibilities of the duty personnel, insisting on being on duty 24 hours a day, responsible for collecting information and reporting the flood and drought situation.

IV. Safety inspection before flood season

After inspection, firstly, there are pear trees on the anti-repair water reservoir in Dalu Town; Second, the culvert of Yanwodang Reservoir is blocked due to the repair of Chongqing-Suiyuan Expressway; Third, the Shihe weir at Manaozui, Shidao, was blocked by the repair of the Chongqing-Suiyuan Expressway. No other potential safety hazards were found.

We are actively dealing with the pear trees in the anti-repair reservoir. It is suggested that the culvert blockage and river blockage caused by expressway repair in Yanwodang Reservoir and Shidao Manaozui Shihe Weir should be solved by the higher authorities.

5. Self-inspection report on water conservancy safety production

I. Strengthening leadership and careful deployment

A leading group for the investigation of hidden dangers in flood control of water conservancy projects was established at the meeting, with the main leaders as the team leader, the leaders in charge as the deputy team leader, and the heads of relevant stock rooms as members. Divided into six groups, we will conduct a comprehensive and in-depth investigation of potential safety hazards in reservoirs and water conservancy projects under construction in all townships and towns of the county, and formulate rectification measures within a time limit for those who find out potential safety hazards, and strive to eliminate potential safety hazards in the bud.

2. Highlighting the key points

1. A comprehensive inspection was conducted on the flood control organization, plan revision, emergency materials reserve, emergency rescue team formation, geological hazard investigation of mountain torrents, river clearing and duty implementation of all township reservoirs in the county. In the process of inspection, we made in-depth and detailed field survey on all kinds of water conservancy projects, especially dangerous reservoirs under construction, flood dikes in important sections, areas prone to geological disasters of mountain torrents and flood blocking conditions of rivers, so as to ensure that there is no leakage of one reservoir, one dam, one river and one ditch, and no hidden dangers. At the same time, we ordered relevant departments to immediately formulate relevant measures and rectify within a time limit.

2. Check whether the three major parts of the reservoir hub (dam, spillway and emptying tunnel) are in good condition, and whether the dam has cracks, settlement deformation and leakage. Whether the spillway is completely cleared of obstacles, whether there are any obstacles to flood, and whether it can discharge flood smoothly. Whether the emptying equipment is in good condition, whether the opening and closing equipment is flexible, and whether it can play a role in discharging water; Whether the weeds and trees on the dam are cleared and whether there are potential safety hazards.

3. Existing problems

1. The dam body and dam foundation of some reservoirs are leaking, the inner slope of the dam is eroded by wind and waves, and the landslide is serious, and the weeds and trees on the dam have not been cleared.

2. The standard of spillway in some reservoirs is not enough, and the side wall collapses, silts up and fish-blocking facilities hinder flood.

3. Termites in most reservoirs are seriously harmful.

4. The water discharge facilities of Shikanzi Reservoir cannot operate normally due to years.

5. The awareness of flood control responsibility needs to be strengthened, and a few township leaders and grassroots cadres still have luck in their thinking, and they don't pay enough attention to flood control work.

IV. Implementing rectification measures

For the problems detected, the responsibilities of the township and reservoir management unit have been implemented. The specific measures are as follows: First, speed up the rectification progress of dangerous reservoirs and restore the flood control capacity of reservoirs as soon as possible. For reservoirs that cannot be rectified in flood season, it is necessary to limit the water level and strengthen observation. Second, it is necessary to strengthen the inspection of reservoirs, focusing on the inspection of reservoir key projects. The third is to completely remove the blockage of the spillway, remove weeds and trees on the dam, and dismantle the fish-blocking facilities in the spillway. The fourth is to improve the emptying, drainage equipment and gates. Fifth, it is necessary to strengthen the duty system for flood control, further strengthen the duty system for flood control and the leadership shift system, grasp the flood situation and danger in time, and make good preparations for flood control materials. Sixth, we should pay attention to the changes of water and rain conditions during the flood season and do a good job in information transmission.

through the investigation of safety hazards of water conservancy projects, our bureau further strengthened the implementation of safety precautions for water conservancy projects, further eliminated safety hazards, and ensured that the safety construction of water conservancy projects and the safety of people's lives and property were not threatened.